Smart line conditioning (Q18635)

From EU Knowledge Graph
Revision as of 15:06, 19 March 2020 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 39.9999999679199 percent)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Smart line conditioning
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,481,261.73 Czech koruna
    0 references
    299,250.46920000005 Euro
    10 January 2020
    0 references
    18,703,154.34 Czech koruna
    0 references
    748,126.1736 Euro
    10 January 2020
    0 references
    31 December 2022
    0 references
    E.ON Distribuce, a.s.
    0 references
    0 references

    48°57'40.28"N, 14°27'20.84"E
    0 references
    37001
    0 references
    Předmětem projektu je instalace 27 linkových kondicionérů v různých lokalitách na distribučním území společnosti E.ON Distribuce, a.s. Linkový kondicionér pracuje jako výkonový stabilizátor nízkého napětí, který kompenzuje změny síťového napětí pomocí sériově zapojených transformátorů napájených měničem elektrické energie. Projekt je realizován za účelem zvýšení kvality dodávky elektrické energie zákazníkům v dotčených lokalitách. a. (Czech)
    0 references
    The subject of the project is the installation of 27 line-based conditioners in E.ON Distribuce, a.s., based as a low voltage performance stabiliser at various locations in the distribution territory of E.ON Distribuce, a.s., which compensates for the changes in the network voltage by means of a series of power transformers supplied with electric power converters. The project is being implemented in order to improve the quality of the supply of electricity to customers in the locations concerned. (English)
    0 references

    Identifiers

    CZ.01.3.12/0.0/0.0/18_234/0015770
    0 references