Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna (Q85957)

From EU Knowledge Graph
Revision as of 20:00, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q85957 in Poland
Language Label Description Also known as
English
Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna
Project Q85957 in Poland

    Statements

    0 references
    775,677,722.67 zloty
    0 references
    186,162,653.44 Euro
    13 January 2020
    0 references
    912,562,026.68 zloty
    0 references
    219,014,886.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2023
    0 references
    GMINA MIASTO ŚWINOUJŚCIE
    0 references
    0 references

    53°49'37.2"N, 14°20'8.5"E
    0 references
    Zakłada się wykonanie tunelu jednonawowego w technologii tarczy drążonej TBM, dł. 1,44 km. Pozostałymi elementami układu drogowego będą: drogi dojazdowe do tunelu: wyspa Uznam drogi dojazdowe do tunelu wraz ze stacją poboru opłat, wyspa Wolin drogi dojazdowe do tunelu oraz rondo. (Polish)
    0 references
    A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout. (English)
    14 October 2020
    0 references
    Tunnel à une nage est supposé dans la technologie de disque creux TBM, long. 1,44 km. Les autres éléments du système routier seront les suivants: routes d’accès au tunnel: Les routes d’accès de l’île d’Uznam au tunnel avec la station de péage, les routes d’accès de l’île Wolin au tunnel et au rond-point. (French)
    30 November 2021
    0 references
    Einschiffiger Tunnel wird in der TBM-Hohlscheibentechnologie lange angenommen. 1,44 km. Die anderen Elemente des Straßensystems werden sein: Zufahrtsstraßen zum Tunnel: Uznam Island Zufahrtsstraßen zum Tunnel mit Mautstation, Wolin Insel Zufahrt Straßen zum Tunnel und Kreisverkehr. (German)
    7 December 2021
    0 references
    Een tunnel wordt aangenomen in TBM holle schijf technologie, lang. 1,44 km. De andere elementen van het wegennet zijn: toegangswegen tot de tunnel: Uznam Island toegangswegen naar de tunnel met tolstation, Wolin eiland toegangswegen naar de tunnel en rotonde. (Dutch)
    16 December 2021
    0 references

    Identifiers

    POIS.04.02.00-00-0021/16
    0 references