Reconstruction of the power supply system 110/6k V marked as E1 (d. 1/86) and E2 (c.1/26) to attach a 11.8 MW RES energy unit (Q84421)

From EU Knowledge Graph
Revision as of 20:00, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q84421 in Poland
Language Label Description Also known as
English
Reconstruction of the power supply system 110/6k V marked as E1 (d. 1/86) and E2 (c.1/26) to attach a 11.8 MW RES energy unit
Project Q84421 in Poland

    Statements

    0 references
    7,628,214.39 zloty
    0 references
    1,830,771.45 Euro
    13 January 2020
    0 references
    10,897,995.12 zloty
    0 references
    2,615,518.83 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    4 April 2017
    0 references
    31 December 2019
    0 references
    TOWARZYSTWO INWESTYCYJNE „ELEKTROWNIA – WSCHÓD” S.A.
    0 references
    0 references
    0 references
    0 references
    Projektu obejmuje przebudowę układu zasilania stacji elektroenergetycznych 110/6kV oznaczonych jako E1 i E2w celu przyłączenia bloku energetycznego OZE o mocy 11,8 MW: - E-1 - ul. Ślusarska 5, Lublin (działka gruntu nr 1/86 obr. 13 Hajdów), - E-2 -ul. Konstruktorów 6 w Lublin (działka gruntu nr 1/26 obr. 13 Hajdów). (Polish)
    0 references
    The project involves the reconstruction of the 110/6 kV power station power supply system designated E1 and E2 in order to connect a 11.8 MW RES power unit: — E-1 – ul. Ślusarska 5, Lublin (part of land no. 1/86 r. 13 Hajd), – E-2 -ul. Constructors 6 in Lublin (part of land no. 1/26 r. 13 Hajds). (English)
    14 October 2020
    0 references
    Le projet comprend la reconstruction du système d’alimentation pour les centrales 110/6 kV marquées comme E1 et E2 afin de raccorder une unité SER de 11,8 MW: — E-1 — m. Ślusarska 5, Lublin (terrain no 1/86 r. 13 Haids), — E-2 -ul. Constructeurs 6 à Lublin (terrain no 1/26 r. 13 haïds). (French)
    30 November 2021
    0 references
    Das Projekt umfasst die Rekonstruktion des Stromversorgungssystems für 110/6 kV-Kraftwerke, die als E1 und E2 gekennzeichnet sind, um ein 11,8 MW RES-Stromaggregat anzuschließen: — E-1 – st. Ślusarska 5, Lublin (Grundstück Nr. 1/86 r. 13 Haids), – E-2 -ul. Bauherren 6 in Lublin (Grundstück Nr. 1/26 r. 13 Haids). (German)
    7 December 2021
    0 references
    Het project omvat de reconstructie van het elektriciteitsvoorzieningssysteem voor 110/6 kV-centrales aangeduid als E1 en E2 met het oog op de aansluiting van een RES-vermogenseenheid van 11,8 MW: E-1 — st. Ślusarska 5, Lublin (perceel nr. 1/86 r. 13 Haids), — E-2 -ul. Bouwers 6 in Lublin (perceel nr. 1/26 r. 13 Haids). (Dutch)
    16 December 2021
    0 references

    Identifiers

    POIS.01.01.02-00-0009/17
    0 references