Reconstruction of Item 1 — Studies and Works (Q3713406)

From EU Knowledge Graph
Revision as of 06:29, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q3713406 in France
Language Label Description Also known as
English
Reconstruction of Item 1 — Studies and Works
Project Q3713406 in France

    Statements

    0 references
    2,518,127.5 Euro
    0 references
    4,197,545.85 Euro
    0 references
    59.99 percent
    0 references
    1 March 2019
    0 references
    1 March 2020
    0 references
    GRAND PORT MARITIME DE LA REUNION
    0 references
    0 references
    Suite à l’étude de faisabilité, la première solution a été retenue par le maître d'ouvrage à l'issu du rapport d'étude. Cette solution consiste à démolir le tablier construit en 1957 jusqu'au niveau du corbeau réalisé en 2ème phase en 1965. (French)
    0 references
    Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English)
    22 November 2021
    0 references
    Im Anschluss an die Durchführbarkeitsstudie wurde die erste Lösung vom Bauherrn auf der Grundlage des Studienberichts gewählt. Diese Lösung besteht darin, die 1957 gebaute Schürze bis zur Höhe der Krähe abzureißen, die 1965 in der zweiten Phase errichtet wurde. (German)
    2 December 2021
    0 references
    Na de haalbaarheidsstudie heeft de aanbestedende dienst de eerste oplossing gekozen op basis van het studieverslag. Deze oplossing bestaat uit het slopen van het in 1957 gebouwde schort tot het niveau van de raaf die in de tweede fase in 1965 werd gemaakt. (Dutch)
    7 December 2021
    0 references

    Identifiers

    RE0018406
    0 references