Tourism development of the swimming pool of Boucan Canot — Construction phase (Q3712381)
Jump to navigation
Jump to search
Project Q3712381 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Tourism development of the swimming pool of Boucan Canot — Construction phase |
Project Q3712381 in France |
Statements
403,636.44 Euro
0 references
576,623.48 Euro
0 references
70.0 percent
0 references
1 February 2015
0 references
31 October 2019
0 references
COMMUNE DE SAINT PAUL
0 references
Le projet d’aménagement du Bassin de Boucan Canot a pour objet la réhabilitation du bassin, la mise en place d'un système de maintien de qualité de l'eau, l’aménagement et la sécurisation des accès ainsi que l’aménagement de l’accès à la plage. (French)
0 references
The purpose of the Boucan Canot Basin development project is to rehabilitate the basin, establish a system to maintain water quality, develop and secure access and develop access to the beach. (English)
22 November 2021
0 references
Das Projekt zur Erschließung des Beckens von Boucan Canot zielt auf die Sanierung des Beckens, die Einrichtung eines Systems zur Erhaltung der Wasserqualität, die Einrichtung und Sicherung der Zugänge sowie die Einrichtung des Zugangs zum Strand ab. (German)
2 December 2021
0 references
Het doel van het Boucan Canot Basin-ontwikkelingsproject is het herstel van het bekken, het opzetten van een systeem om de waterkwaliteit te handhaven, de toegang tot het strand te ontwikkelen en te beveiligen en de toegang tot het strand te verbeteren. (Dutch)
6 December 2021
0 references
Identifiers
RE0003270
0 references