(A19_067_2015_0670016_1099) A19_067_2015_0670016 (Q2167388)

From EU Knowledge Graph
Revision as of 13:28, 24 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2167388 in Italy
Language Label Description Also known as
English
(A19_067_2015_0670016_1099) A19_067_2015_0670016
Project Q2167388 in Italy

    Statements

    0 references
    85,541.32 Euro
    0 references
    380,183.65 Euro
    0 references
    22.5 percent
    0 references
    2 January 2017
    0 references
    15 March 2021
    0 references
    15 March 2021
    0 references
    UNIVERSITA' DEGLI STUDI DI FIRENZE
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO RIGUARDA LO SVILUPPO E LA DIMOSTRAZIONE DI UN SISTEMA AVANZATO DI DIAGNOSTICA PREDITTIVA (PROGNOSTICA) DI TUTTI I PRINCIPALI COMPONENTI DI UN IMPIANTO GEOTERMICO CHE RISULTI INTEGRATO E CONFIGURABILE E CHE PERMETTA DI: ? ESTENDERE L?ATTUALE LIVELLO DI MONITORAGGIO, INCLUDENDO NUOVI COMPONENTI E PROCESSI; ? MONITORARE ON-LINE LO STATO DI SALUTE/PERFORMANCE DELL?IMPIANTO E DEI SUOI SOTTO-SITEMI; ? RICONOSCERE IN ANTICIPO POSSIBILI GUASTI; ? AGGREGARE DIVERSE TIPOLOGIE DI INFORMAZIONI, STRUTTURATE (AD ESEMPIO I DATI DI PROCESSO) E NON STRUTTURATE (COME GLI ORDINI DI MANUTENZIONE); ? DOTARE GLI OPERATORI E I RESPONSABILI DI ESERCIZIO E MANUTENZIONE DEGLI IMPIANTI DI SISTEMI DI ANALISI E DI SUPPORTO ALLE DECISIONI PER L?OTTIMIZZAZIONE DELL?INTERO PARCO. IL SISTEMA SAR? DIMOSTRATO ATTRAVERSO L?IMPLEMENTAZIONE DI UN PRIMO PILOTA SU UNA CENTRALE GEOTERMICA DA 20MWE DI ULTIMA GENERAZIONE E SAR? ESTESO ALLE SEGUENTI SEZIONI: ? POZZI DI ESTRAZIONE E RETE DI TRASPORTO DEL VAPORE GEOTER (Italian)
    0 references
    THE PROJECT CONCERNS THE DEVELOPMENT AND DEMONSTRATION OF AN ADVANCED DIAGNOSTIC (PROGNOSTIC) SYSTEM OF ALL MAJOR COMPONENTS OF A GEOTHERMAL PLANT THAT IS INTEGRATED AND CONFIGURABLE, AND WHICH MAKES IT POSSIBLE TO: ? EXTEND THE CURRENT LEVEL OF MONITORING TO INCLUDE NEW COMPONENTS AND PROCESSES; ? TO MONITOR THE STATE OF HEALTH/PERFORMANCE OF THE PLANT AND ITS SUBCOMPONENTS, ONLINE; ? RECOGNITION IN ADVANCE OF POSSIBLE FAILURES; ? AGGREGATING DIFFERENT TYPES OF INFORMATION, STRUCTURED (E.G. PROCESS DATA) AND UNSTRUCTURED (SUCH AS MAINTENANCE ORDERS); ? GIVE OPERATORS AND OPERATORS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF SYSTEMS OF ANALYSIS AND SUPPORT FOR DECISION SUPPORT SYSTEMS FOR THE OPTIMISATION OF THE WHOLE PARK. THE SAR SYSTEM? DEMONSTRATED THROUGH THE IMPLEMENTATION OF A FIRST PILOT ON A GEOTHERMAL POWER PLANT OF THE LAST GENERATION OF 20MWE OF THE LAST GENERATION AND SAR? EXTENDED TO THE FOLLOWING SECTIONS: ? EXTRACTION WELLS AND STEAM TRANSPORTATION NETWORK GEOTER (English)
    0 references
    LE PROJET CONCERNE LE DÉVELOPPEMENT ET LA DÉMONSTRATION D’UN SYSTÈME DE DIAGNOSTIC PRÉDICTIF AVANCÉ (PROGNOSTIQUE) DE TOUTES LES COMPOSANTES PRINCIPALES D’UNE CENTRALE GÉOTHERMIQUE INTÉGRÉE ET CONFIGURABLE ET PERMETTANT: ÉTENDRE LE NIVEAU ACTUEL DE SURVEILLANCE, Y COMPRIS LES NOUVEAUX COMPOSANTS ET PROCESSUS; SURVEILLER EN LIGNE L’ÉTAT DE SANTÉ/LA PERFORMANCE DE LA CENTRALE ET DE SES SOUS-SYSTÈMES; RECONNAÎTRE D’ÉVENTUELLES DÉFAILLANCES À L’AVANCE; AGRÉGER DIFFÉRENTS TYPES D’INFORMATIONS, STRUCTURÉES (DONNÉES DE PROCESSUS E.G.) ET NON STRUCTURÉES (COMME LES ORDRES DE MAINTENANCE); ÉQUIPER LES EXPLOITANTS ET LES GESTIONNAIRES DES INSTALLATIONS DE SYSTÈMES D’ANALYSE ET DE PRISE DE DÉCISION POUR L’OPTIMISATION DE L’ENSEMBLE DU PARC. LE SYSTÈME SAR? DÉMONTRÉ PAR LA MISE EN ŒUVRE D’UN PREMIER PROJET PILOTE SUR UNE CENTRALE GÉOTHERMIQUE DE DERNIÈRE GÉNÉRATION DE 20MWE ET SUR LA RAS? ÉTENDUE AUX SECTIONS SUIVANTES: PUITS D’EXTRACTION ET RÉSEAU DE TRANSPORT DE VAPEUR GEOTER (French)
    23 December 2021
    0 references
    HET PROJECT BETREFT DE ONTWIKKELING EN DEMONSTRATIE VAN EEN GEAVANCEERD VOORSPELLEND (PROGNOSTISCH) DIAGNOSTISCH SYSTEEM VAN ALLE HOOFDCOMPONENTEN VAN EEN GEOTHERMISCHE INSTALLATIE DIE GEÏNTEGREERD EN CONFIGUREERBAAR IS EN DIE HET MOGELIJK MAAKT: UITBREIDING VAN HET HUIDIGE MONITORINGNIVEAU, MET INBEGRIP VAN NIEUWE COMPONENTEN EN PROCESSEN; ON LINE TOEZICHT HOUDEN OP DE GEZONDHEIDSTOESTAND/PRESTATIES VAN DE INSTALLATIE EN DE SUBSYSTEMEN ERVAN; EVENTUELE STORINGEN VAN TEVOREN TE HERKENNEN; AGGREGATIE VAN VERSCHILLENDE SOORTEN INFORMATIE, GESTRUCTUREERDE (E.G. PROCESGEGEVENS) EN ONGESTRUCTUREERDE (ZOALS ONDERHOUDSOPDRACHTEN); DE EXPLOITANTEN EN BEHEERDERS VAN DE INSTALLATIES VOORZIEN VAN ANALYSE- EN BESLISSINGSONDERSTEUNENDE SYSTEMEN VOOR DE OPTIMALISATIE VAN HET GEHELE PARK. HET SAR-SYSTEEM? GEDEMONSTREERD DOOR DE IMPLEMENTATIE VAN EEN EERSTE PROEF OP EEN 20MWE NIEUWSTE GENERATIE GEOTHERMISCHE ELEKTRICITEITSCENTRALE EN SAR? UITGEBREID NAAR DE VOLGENDE RUBRIEKEN: EXTRACTIEPUTTEN EN STOOMTRANSPORTNETWERK GEOTER (Dutch)
    24 December 2021
    0 references

    Identifiers