* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * of the (Q2074816)

From EU Knowledge Graph
Revision as of 14:24, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2074816 in Italy
Language Label Description Also known as
English
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * of the
Project Q2074816 in Italy

    Statements

    0 references
    13,050.0 Euro
    0 references
    26,100.0 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    17 September 2019
    0 references
    14 December 2018
    0 references
    PIROLLO DANILO
    0 references
    0 references

    45°36'27.07"N, 11°59'57.88"E
    0 references
    L'AZIENDA INTENDE ATTUARE UNA SERIE DI INTERVENTI FINALIZZATI AL CONTENIMENTO DI CONSUMI ENERGETICI DIVISI IN DUE GRANDI MACRO AREE; LA *individuo* A NUOVI MACCHINARI PER EFFICIENTARE IL PROCESSO PRODUTTIVO: - INSTALLAZIONE MAGAZINO AUTOMATICO CHE PERMETTE DI LIMITARE TUTTE LE OPERAZIONI FATTE CON MULETTI E GLI SPOSTAMENTI DI UTENSILI NON VOLUTI DOVUTI AD UN ERRATO STOCCAGGIO, - SOSTITUZIONE DELL'ODIERNO COMPRESSORE A VITE CON UNO AD INVERTER. LA SECONDA AREA E' RELATIVA ALL'EFFICENTAMENTO ENERGETICO EDIFICI PREVEDE L'INSTALLAZIONE DI UNA POMPA DI CALORE PER LA CLIMATIZZAZIONE DELL'AREA DI CONTROLLO E MISURA E L'INSTALLAZIONE DI UN SISTEMA DI ILLUMINAZIONE PER L'AREA DI CONTROLLO E MISURA E, INFINE, L'INSTALLAZIONE DI UN IMPIANTO FOTOVOLTAICO. (Italian)
    0 references
    THE COMPANY INTENDS TO IMPLEMENT A SERIES OF MEASURES AIMED AT CURBING ENERGY CONSUMPTION, DIVIDED INTO TWO BROAD MACRO-AREAS; * any individual * A new NEW MACHINERY TO BE PRODUCED PRODUtBOI: — AUTOMATIC MAGIC INSTALLATION ALLOWING TO LIMIT ALL OPERATIONS WITH MULES AND MOVEMENTS OF UNWANTED TOOLS DUE TO INCORRECT STORAGE, — REPLACEMENT OF TODAY’S COMPRESSOR BY MEANS OF INVERTER. THE SECOND AREA CONCERNS THE ENERGY EFFICIENCY OF THE BUILDINGS PROVIDED FOR IN THE INSTALLATION OF A HEAT PUMP FOR AIR CONDITIONING OF THE CONTROL AREA AND MEASUREMENT AND INSTALLATION OF A LIGHTING SYSTEM FOR THE CONTROL AREA AND MEASUREMENT AREA AND, FINALLY, THE INSTALLATION OF A PHOTOVOLTAIC INSTALLATION. (English)
    0 references
    L’ENTREPRISE A L’INTENTION DE METTRE EN ŒUVRE UNE SÉRIE D’INTERVENTIONS VISANT À LIMITER LA CONSOMMATION D’ÉNERGIE DIVISÉE EN DEUX GRANDES MACROZONES; *Individuel* DANS LA NOUVELLE MACHINERY AU PROCESSUS Efficace: — INSTALLATION AUTOMATIQUE DE MAGAZINO QUI PERMET DE LIMITER TOUTES LES OPÉRATIONS EFFECTUÉES AVEC DES CHARIOTS ÉLÉVATEURS ET LE DÉPLACEMENT DES OUTILS INDÉSIRABLES EN RAISON D’UN STOCKAGE INCORRECT, — REMPLACEMENT DU COMPRESSEUR À VIS COURANT PAR UN ONDULEUR. LE DEUXIÈME DOMAINE CONCERNE L’EFFICACITÉ ÉNERGÉTIQUE DES BÂTIMENTS: L’INSTALLATION D’UNE POMPE À CHALEUR POUR LA CLIMATISATION DE LA ZONE DE CONTRÔLE ET DE MESURE, L’INSTALLATION D’UN SYSTÈME D’ÉCLAIRAGE POUR LA ZONE DE CONTRÔLE ET DE MESURE ET, ENFIN, L’INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE. (French)
    16 December 2021
    0 references

    Identifiers

    B47B18000050009
    0 references