(10360.14072017.115000060) LOC. CARRAIA (Q2056984)
Jump to navigation
Jump to search
Project Q2056984 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000060) LOC. CARRAIA |
Project Q2056984 in Italy |
Statements
221,440.91 Euro
0 references
738,136.34 Euro
0 references
30.0 percent
0 references
30 March 2018
0 references
30 March 2020
0 references
16 November 2020
0 references
COMUNE DI CALENZANO
0 references
GLI INTERVENTI PREVISTI, FINALIZZATI AL RISPARMIO ENERGETICO, OLTRE A QUELLI EDILI COMPLEMENTARI ED ALTRI DEL COMPLESSO SCOLASTICO SONO I SEGUENTI:- INSTALLAZIONE NUOVA POMPA DI CALORE PER FUNZIONAMENTO IBRIDO CON CALDAIA A METANO ESISTENTE, MODIFICHE SUGLI IMPIANTI DI DISTRIBUZIONE ED EMISSIONE DELL'IMPIANTO DI RISCALDAMENTO ED ALLACCIAMENTI ELETTRICI;- NUOVO SISTEMA DI TELECONTROLLO/TELEGESTIONE, MONITORAGGIO ENERGETICO E DIMMERIZZAZIONE CORPI ILLUMINANTI;- SOSTITUZIONE INFISSI ESISTENTI, CON DEI NUOVI CON DOPPIO VETRO E TELAIO IN ALLUMINIO A TAGLIO TERMICO PER TUTTO IL FABBRICATO;- REALIZZAZIONE DI CAPPOTTO TERMICO ESTERNO PER TUTTO IL FABBRICATO;- INSTALLAZIONE DI FRANGISOLE SU ALCUNE FINESTRE DEL COMPLESSO PER RIDUZIONE SOLEGGIAMENTO INTERNO;- REALIZZAZIONE DI TETTO VENTILATO PER RIDUZIONE SURRISCALDAMENTO ESTIVO NELLA PORZIONE CHE OSPITA LA SCUOLA MATERNA (Italian)
0 references
THE MEASURES ENVISAGED, WITH THE AIM OF SAVING ENERGY, IN ADDITION TO THE ADDITIONAL CONSTRUCTION AND OTHER COMPONENTS OF THE SCHOOL COMPLEX, ARE AS FOLLOWS: — NEW HEAT PUMP INSTALLATION FOR HYBRID OPERATION WITH EXISTING METHANE BOILER, CHANGES TO THE HEATING SYSTEM AND THE INSTALLATION OF THE HEATING SYSTEM AND ELECTRICAL CONNECTIONS; — NEW REMOTE MANAGEMENT, ENERGY MONITORING AND DIME SYSTEM; — REPLACEMENT OF EXISTING FIXTURES, WITH NEW, WITH TWO NEW ONES WITH DOUBLE GLASS AND THERMAL CUT ALUMINIUM FRAME FOR THE ENTIRE BUILDING; — INSTALLATION OF EXTERNAL THERMAL COAT OVER THE ENTIRE BUILDING; — ERECTION OF FRANGISOLE ON SOME WINDOWS OF THE COMPLEX FOR INDOOR REDUCTION; — IMPLEMENTATION OF VENTILATED HEATING CEILING FOR SUMMER HEATING IN THE KINDERGARTEN SECTION (English)
0 references
LES INTERVENTIONS PRÉVUES, DESTINÉES À ÉCONOMISER L’ÉNERGIE, EN PLUS DES BÂTIMENTS COMPLÉMENTAIRES ET D’AUTRES DU COMPLEXE SCOLAIRE SONT LES SUIVANTES:- INSTALLATION D’UNE NOUVELLE POMPE À CHALEUR HYBRIDE AVEC CHAUDIÈRE À MÉTHANE EXISTANTE, MODIFICATION DES SYSTÈMES DE DISTRIBUTION ET D’ÉMISSION DU SYSTÈME DE CHAUFFAGE ET DE RACCORDEMENT ÉLECTRIQUE;- NOUVEAU SYSTÈME DE TÉLÉCOMMANDE/TÉLÉGESTION, DE SURVEILLANCE DE L’ÉNERGIE ET DE GRADATION DES STRUCTURES D’ÉCLAIRAGE;- REMPLACEMENT DES APPAREILS EXISTANTS, PAR DE NOUVEAUX PAR UN DOUBLE CADRE DE COUPE THERMIQUE EN VERRE ET EN ALUMINIUM POUR L’ENSEMBLE DU BÂTIMENT;- RÉALISATION D’UNE COUCHE THERMIQUE EXTERNE POUR L’ENSEMBLE DU BÂTIMENT;- INSTALLATION D’ÉCRANS SOLAIRES SUR CERTAINES FENÊTRES DU COMPLEXE POUR LA RÉDUCTION DE L’ENSOLEILLEMENT INTERNE;- RÉALISATION D’UN TOIT VENTILÉ POUR RÉDUIRE LA SURCHAUFFE ESTIVALE DANS LA PARTIE QUI ABRITE LA MATERNELLE (French)
16 December 2021
0 references
Identifiers
E77D18000440006