DIRECTOR CASTROCUCCO-EABOLI (Q2021713)
Jump to navigation
Jump to search
Project Q2021713 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | DIRECTOR CASTROCUCCO-EABOLI |
Project Q2021713 in Italy |
Statements
14,154,416.07 Euro
0 references
19,159,707.4 Euro
0 references
73.88 percent
0 references
21 September 2017
0 references
31 July 2020
0 references
TERNA - RETE ELETTRICA NAZIONALE
0 references
IL PRESENTE PROGETTO RIGUARDERà LA REALIZZAZIONE DI UN NUOVO ELETTRODOTTO A 150 KV IN CAVO INTERRATO PER COLLEGARE LA CABINA PRIMARIA DI MARATEA ALLA CENTRALE DI CASTROCUCCO. L'AREA DEL CILENTO Ê ALIMENTATA DALLE SE DI MONTECORVINO E ROTONDA, TRAMITE UN'ESTESA RETE AD ANELLO A 150 KV, LA QUALE, A CAUSA DELL'ELEVATO CONSUMO SOPRATTUTTO NEI PERIODI ESTIVI, Ê IMPEGNATA DA NOTEVOLI TRANSITI. TALE ASSETTO COMPORTA UN ELEVATO IMPEGNO DELLE TRASFORMAZIONI NELLE DUE STAZIONI E UN RISCHIO ELEVATO DI ENERGIA NON FORNITA IN CONDIZIONI DI MANUTENZIONE SU UN TRONCO DEL SUDDETTO ANELLO. AL FINE DI INCREMENTARE L'ADEGUATEZZA DEL SISTEMA E MIGLIORARE LA SICUREZZA DI ESERCIZIO DELLA TRASMISSIONE Ê PROGRAMMATA LA REALIZZAZIONE DI UN NUOVO COLLEGAMENTO A 150 KV TRA LA C.LE DI CASTROCUCCO E LA SE DI MARATEA. TALE INTERVENTO CONSENTIRà UNA MIGLIORE GESTIONE DELLE MANUTENZIONI E UN MINORE RISCHIO DI DISALIMENTAZIONI. INOLTRE IL PRESENTE PROGETTO PREVEDE UNA SERIE DI INTERVENTI INNOVATIVI DI IMPLEMENTAZ (Italian)
0 references
THIS PROJECT WILL COVER THE CONSTRUCTION OF A NEW 150 KV POWER LINE IN BASEMENT TO CONNECT THE PRIMARY CABIN OF MARATEA TO THE CASTROCUCCO POWER STATION. THE CILENTO ÃO AREA, ON THE BASIS OF A WIDE NETWORK OF 150 KV RING, WHICH, BECAUSE OF HIGH CONSUMPTION DURING THE SUMMER PERIODS, HAS BEEN BUSY. THIS ARRANGEMENT INVOLVES A HIGH DEGREE OF COMMITMENT OF THE TRANSFORMATION IN THE TWO STATIONS AND A HIGH RISK OF ENERGY NOT BEING PROVIDED UNDER MAINTENANCE CONDITIONS ON A TRUNK OF THE ABOVE-MENTIONED RING. IN ORDER TO INCREASE THE ADEQUACY OF THE SYSTEM AND IMPROVE THE SAFE OPERATION OF THE TRANSMISSION, THE IMPLEMENTATION OF A NEW 150 KV CONNECTION BETWEEN THE PREMISES OF THE C.LE OF CASTELCUCCO AND THE IF OF MARATEA IS PLANNED. THIS WORK WILL IMPROVE MAINTENANCE MANAGEMENT AND A LOWER RISK OF DISEANS. IN ADDITION, THIS PROJECT PROVIDES FOR A SERIES OF INNOVATIVE ACTIONS TO BE MADE BY IMPLESMENTAZ (English)
0 references
CE PROJET PORTERA SUR LA CONSTRUCTION D’UNE NOUVELLE LIGNE ÉLECTRIQUE SOUTERRAINE DE 150 KV POUR RELIER LA CABINE PRINCIPALE DE MARATEA À L’USINE CASTROCUCCO. LA ZONE DE CILENTO Ê EST ALIMENTÉE PAR LE MONTECORVINO ET LE ROND-POINT, À TRAVERS UN VASTE RÉSEAU DE BOUCLES DE 150 KV, QUI, EN RAISON DE LA FORTE CONSOMMATION SURTOUT PENDANT L’ÉTÉ, EST ENGAGÉ PAR D’IMPORTANTS TRANSITS. CET ARRANGEMENT IMPLIQUE UN ENGAGEMENT ÉLEVÉ DE TRANSFORMATIONS DANS LES DEUX STATIONS ET UN RISQUE ÉLEVÉ D’ÉNERGIE NON FOURNIE DANS DES CONDITIONS D’ENTRETIEN SUR UN TRONC DE CET ANNEAU. AFIN D’AUGMENTER L’ADÉQUATION DU SYSTÈME ET D’AMÉLIORER LA SÉCURITÉ OPÉRATIONNELLE DE LA TRANSMISSION Ê PRÉVU LA RÉALISATION D’UNE NOUVELLE CONNEXION DE 150 KV ENTRE LE C.LE DE CASTROCUCCO ET LA SE DE MARATEA. CELA PERMETTRA UNE MEILLEURE GESTION DE LA MAINTENANCE ET UN RISQUE DE DÉCONNEXION MOINDRE. EN OUTRE, CE PROJET PRÉVOIT UNE SÉRIE D’INTERVENTIONS INNOVANTES PAR IMPLEMENTAZ (French)
14 December 2021
0 references