GIOIA TAURO: COMPLETION OF NORTHERN OPERATIONS (Q2017469)

From EU Knowledge Graph
Revision as of 11:15, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2017469 in Italy
Language Label Description Also known as
English
GIOIA TAURO: COMPLETION OF NORTHERN OPERATIONS
Project Q2017469 in Italy

    Statements

    0 references
    13,632,624.75 Euro
    0 references
    18,176,833.0 Euro
    0 references
    75.0 percent
    0 references
    1 July 2008
    0 references
    20 November 2019
    0 references
    AUTORITA' PORTUALE DI GIOIA TAURO
    0 references
    0 references

    38°25'26.29"N, 15°53'56.40"E
    0 references
    LA FINALITà DELL¿INTERVENTO Ê CONSENTIRE LA CIRCOLAZIONE VEICOLARE ALL'INTERNO DELL'AREA PORTUALE CON MARGINI DI SICUREZZA ADEGUATI, EVITANDO DI UTILIZZARE LE BANCHINE COME ARTERIE DI TRANSITO E ADEGUANDO LE INFRASTRUTTURE ESISTENTI ALLE NUOVE NORMATIVE EUROPEE (Italian)
    0 references
    THE PURPOSE OF THIS ASSIGNMENT IS TO ENABLE THE MOVEMENT OF TRANSPORT WITHIN THE PORT AREA WITH ADEQUATE SAFETY MARGINS, AVOIDING THE USE OF QUAYS AS TRANSIT ROUTES AND ADAPTING EXISTING INFRASTRUCTURE TO THE NEW EUROPEAN RULES. (English)
    0 references
    L’OBJECTIF DE L’INTERVENTION EST DE PERMETTRE LA CIRCULATION DES VÉHICULES À L’INTÉRIEUR DE LA ZONE PORTUAIRE AVEC DES MARGES DE SÉCURITÉ ADÉQUATES, EN ÉVITANT D’UTILISER LES QUAIS COMME ARTÈRES DE TRANSIT ET EN ADAPTANT LES INFRASTRUCTURES EXISTANTES AUX NOUVELLES RÉGLEMENTATIONS EUROPÉENNES. (French)
    14 December 2021
    0 references

    Identifiers

    F51B13000280002
    0 references