Installation of five biomass boilers in the Centro de Mayors de Caranza (Q3231369)

From EU Knowledge Graph
Revision as of 08:13, 10 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q3231369 in Spain
Language Label Description Also known as
English
Installation of five biomass boilers in the Centro de Mayors de Caranza
Project Q3231369 in Spain

    Statements

    0 references
    159,991.1 Euro
    0 references
    199,988.88 Euro
    0 references
    80.0 percent
    0 references
    23 March 2017
    0 references
    7 November 2017
    0 references
    XUNTA DE GALICIA
    0 references
    0 references
    0 references

    43°29'4.88"N, 8°13'59.38"W
    0 references
    15036
    0 references
    Sustitución de una caldera de gas natural de 965 kW por cinco calderas de biomasa de pellets de carga automática de 128 kW/ud, para la generación de agua caliente sanitaria y calefacción en el Centro de mayores de Caranza (Ferrol) (Spanish)
    0 references
    Replacement of a 965 kW natural gas boiler with five biomass boilers of automatic load pellets of 128 kW/ud, for the generation of domestic hot water and heating at the Caranza Majors’ Centre (Ferrol) (English)
    14 October 2021
    0 references
    Remplacement d’une chaudière au gaz naturel de 965 kW par cinq chaudières à biomasse en granulés de charge automatiques de 128 kW/ud, pour la production d’eau chaude domestique et le chauffage au Centre Caranza Majors (Ferrol) (French)
    5 December 2021
    0 references
    Ersatz eines 965 kW Erdgaskessels durch fünf Biomassekessel mit automatischen Lastpellets von 128 kW/Ed zur Erzeugung von Warmwasser und Heizung im Caranza Majors’ Centre (Ferrol) (German)
    10 December 2021
    0 references
    Ferrol
    0 references

    Identifiers

    048-2018000157
    0 references