Reduce low emissions and improve energy efficiency in Łazy through thermal modernisation of public buildings. (Q123917)

From EU Knowledge Graph
Revision as of 07:10, 8 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q123917 in Poland
Language Label Description Also known as
English
Reduce low emissions and improve energy efficiency in Łazy through thermal modernisation of public buildings.
Project Q123917 in Poland

    Statements

    0 references
    3,776,821.28 zloty
    0 references
    906,437.11 Euro
    13 January 2020
    0 references
    4,518,269.26 zloty
    0 references
    1,084,384.62 Euro
    13 January 2020
    0 references
    83.59 percent
    0 references
    25 July 2016
    0 references
    30 September 2020
    0 references
    GMINA ŁAZY
    0 references
    0 references

    50°25'39.4"N, 19°23'41.3"E
    0 references
    Zakres projektu obejmuje kompleksową termomodernizację 8 budynków użyteczności publicznej w Gminie Łazy: 1. ZOZ w Niegowonicach 2. SP w Grabowej 3. Budynek Użyteczności Publicznej (BUP) pełniący funkcje społeczno-kulturalne w Niegowonicach 4. Budynek Użyteczności Publicznej (BUP) pełniący funkcje społeczno-kulturalne w Ciągowicach 5. SP nr 1 w Łazach 6. Przedszkole ul. Topolowa w Łazach 7. Przedszkole ul. Kolejowa w Łazach 8. KTS w Łazach Łączny zakres prac obejmuje: - docieplenie budynku (w 8 budynkach), - wymianę okien i drzwi (w 8 budynkach), - wymianę źródła ciepła (w 3 budynkach), - modernizację instalacji c.o. (w 4 budynkach), - modernizację instalacji c.w.u. (w 3 budynkach), - wykonanie instalacji mechanicznej wentylacji z odzyskiem ciepła (w 1 budynku). Pod względem formalno-prawnym projekt jest gotowy do realizacji. (Polish)
    0 references
    The scope of the project includes comprehensive thermal modernisation of 8 public buildings in the Łazy Municipality: 1. ZOZ in Niwonice 2. SP in Grabowa 3. Building of Public Use (BUP) performing socio-cultural functions in Nimwonice 4. Building of Public Use (BUP) performing socio-cultural functions in Ciągowice 5. SP No 1 in Lazy 6. Kindergarten St. Topolowa in Laza 7. Kindergarten St. Railway in Lazai 8. KTS in Łazy The total scope of works includes: — warming of the building (in 8 buildings), – replacement of windows and doors (in 8 buildings), – replacement of heat source (in 3 buildings), – modernisation of the central heating system (in 4 buildings), – modernisation of the central heating system (in 3 buildings), – construction of a mechanical ventilation system with heat recovery (in 1 buildings). In formal and legal terms, the project is ready for implementation. (English)
    21 October 2020
    0 references
    Le champ d’application du projet comprend la thermomodernisation complète de 8 bâtiments publics dans la commune de Łazy: 1. ZOZ dans Niegowonice 2. SP à Grabowa 3. Bâtiment à usage public (BUP) avec des fonctions socioculturelles à Niegowonice 4. Le bâtiment à usage public (BUP) avec des fonctions socioculturelles au Congo deux fois 5. SP 1 à Łaza 6. Le jardin d’enfants. Topolowa dans Łazy 7. Le jardin d’enfants. Gare de Lazakh 8. KTS in Łazy La portée totale des travaux comprend: — isolation du bâtiment (dans 8 bâtiments), — remplacement des fenêtres et des portes (dans 8 bâtiments), — remplacement de la source de chaleur (dans 3 bâtiments), — modernisation des installations de chauffage central (dans 4 bâtiments), modernisation des installations de chauffage central (dans 3 bâtiments), — construction d’une installation de ventilation mécanique avec récupération de chaleur (dans 1 bâtiment). Formellement et juridiquement, le projet est prêt à être mis en œuvre. (French)
    2 December 2021
    0 references
    Das Projekt umfasst eine umfassende Thermomodernisierung von 8 öffentlichen Gebäuden in der Gemeinde Łazy: 1. ZOZ in Niegowonice 2. SP in Grabowa 3. Public Use Building (BUP) mit soziokulturellen Funktionen in Niegowonice 4. Das Public Use Building (BUP) mit soziokulturellen Funktionen in Kongowice 5. SP 1 in Łaza 6. Kindergarten st. Topolowa in Łazy 7. Kindergarten st. Bahnhof in Lazakh 8. KTS in Łazy Gesamtumfang der Arbeiten umfasst: — Isolierung des Gebäudes (in 8 Gebäuden), – Austausch von Fenstern und Türen (in 8 Gebäuden), – Austausch der Wärmequelle (in 3 Gebäuden), – Modernisierung von Zentralheizungsanlagen (in 4 Gebäuden), Modernisierung von Zentralheizungsanlagen (in 3 Gebäuden), – Bau einer mechanischen Lüftungsanlage mit Wärmerückgewinnung (in 1 Gebäude). Formal und rechtlich ist das Projekt zur Umsetzung bereit. (German)
    8 December 2021
    0 references

    Identifiers

    RPSL.04.03.01-24-050F/17
    0 references