Renovation and access for visiting the church tower and restoration of the facade of the Baroque Church and Monastery Team of the Norbertanek Sisters in Imbramowice (Q112741)

From EU Knowledge Graph
Revision as of 16:00, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q112741 in Poland
Language Label Description Also known as
English
Renovation and access for visiting the church tower and restoration of the facade of the Baroque Church and Monastery Team of the Norbertanek Sisters in Imbramowice
Project Q112741 in Poland

    Statements

    0 references
    7,124,370.93 zloty
    0 references
    1,709,849.02 Euro
    13 January 2020
    0 references
    10,178,036.35 zloty
    0 references
    2,442,728.72 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    31 May 2016
    0 references
    13 July 2020
    0 references
    KLASZTOR SIÓSTR NORBERTANEK
    0 references
    0 references
    Zespół klasztorny jest wpisany do Rej. Zabytków Woj. Małop. Zespół jest także jednym ze 176 zabytków widniejących na liście obiektów o znaczeniu region. w Woj. Progr. Opieki nad Zabytkami Małopolski na l. 2014-17 (poz.41). Celem projektu jest rewitalizacja i zabezpieczenie przed zniszczeniem zabytkowych budynków Zespołu Klasztornego ss. Norbertanek, poprawa zabezpieczenia przeciwpożarowego wieży, poprawa estetyki kompleksu klasztornego (szczeg. na tle już odnowionych obiektów) oraz jeszcze szersze udostępnienie i uatrakcyjnienie Zespołu Klasztornego dla turystów odwiedzających Imbramowice, Gm. Trzyciąż i Woj. Małopolskie. Przedmiotem projektu jest kontynuacja prac konserwatorskich w Zespole Klasztornym, na które złożą się następujące działania: 1. Koszty przygotowawcze a/ opracowanie analizy finasnowej; b/ opracowanie brakujących elem. dokument. i kosztorysów. 2. Remont konserwatorski wieży, w tym: a/ wzmocnienie fundamentów b/ udostępnienie wieży i remont wnętrza c/ odtworzenie hełmu wieży d/ konserwacja zegara e/ ekspozycja ukazująca historię miejsca i zakonu. 3. Remont elewacji zabytkowego bud. klasztornego wraz z kościołem, w tym: a/ architektura i konstrukcja; b/ montaż instalacji SAP, oddymiania, CCTV oraz alarmowej. 4. Instalacja pompy ciepła w wieży. 5. Koszty dodatkowe: obsługa prawna projektu, inspektor nadzoru, nadzór autorski, nadzór konserwatorski, nadzór archeologiczny, zarządzanie projektem, promocja unijnego źródła finansow. Całość prac poprzedziło opracowanie szczeg. dokumentacji konserwat., która była podstawą sporządzenia dokumentacji budow. Dokumentacja została opracowana przez znanych i uznanych krakowskich specjalistów w dziedzinie konserwacji zabytków, a stały nadzór Woj. Konserwat. Zabytków oraz liczne konsultacje specjalist. w trakcie opracowywania dokumentacji gwarantują, iż przyjęte rozwiązania są zgodne z najlepszą praktyką dla zespołów zabytkowych o tak wysokiej randze. (Polish)
    0 references
    The monastic team is inscribed in the Regiment. Monuments of the War. It’s a monkey. The complex is also one of 176 monuments on the list of objects of importance in the region. It’s a progr. Care of the Monuments of Małopolska on the year 2014-17 (poz.41). The aim of the project is to revitalise and protect against the destruction of historic buildings of the Monastery Syndrome. Norbertine, improvement of fire protection of the tower, improvement of the aesthetics of the monastery complex (especially against the background of already renovated buildings) and even wider accessibility and attractiveness of the Monastery Team for tourists visiting Imbramowice, Gm.Treat and Woj. It’s Małopolska. The subject of the project is the continuation of conservation works in the Monastery Team, which will consist of the following activities: 1. Preparatory costs a/development of financial analysis; B/development of missing elem. document. and financial statements. 2. Restoration of the tower, including: a/Strengthening the foundations b/accessibility of the tower and renovation of the interior c/reconstruction of the helmet of tower d/clock maintenance e/exposition showing the history of the place and order. 3. Renovation of the facade of the historic monastery building with the church, including: a/architecture and construction; B/assembly of SAP, smoke, CCTV and alarm systems. 4. Heat pump installation in the tower. 5. Ancillary costs: legal support of the project, supervisor, author supervision, conservation supervision, archaeological supervision, project management, promotion of the EU financial source. The whole work was preceded by the preparation of detailed documentation of conservation, which was the basis for drawing up the documentation of the constructions. The documentation was prepared by well-known and recognised specialists in the field of preservation of monuments, and constant supervision of the Woj. It’s a Conservative. Historical monuments and numerous expert consultations during the preparation of the documentation ensure that the adopted solutions are in line with best practice for historic monuments of such high rank. (English)
    20 October 2020
    0 references
    L’ensemble du monastère est inscrit dans Rej. Les monuments des guerres. Le Singe. L’ensemble est également l’un des 176 monuments apparaissant sur la liste des objets de la région d’importance. Progr. Prise en charge des monuments de Małopolska le l. 2014-17 (point 41). L’objectif du projet est de revitaliser et de protéger contre la destruction des bâtiments historiques du complexe monastère SS. Norbertanek, améliorer la protection contre l’incendie de la tour, améliorer l’esthétique du complexe du monastère (surtout sur le fond d’objets déjà rénovés) et rendre le complexe du monastère encore plus accessible et attrayant pour les touristes visitant Imbramowice, Trzyciąż i Woj. Małopolska. Le projet a pour objet la poursuite des travaux de conservation au sein du groupe Monastère, qui comprendront les activités suivantes: 1. Les coûts préparatoires et/ou la préparation de l’analyse financière; B Élaboration de documents manquants et estimations de coûts. 2. Révision de l’entretien de la tour, y compris: a/renforcement de la fondation b/tour d’accès et rénovation de l’intérieur c/reconstruction du casque de tour d/préservation de l’horloge e/exposition montrant l’historique du lieu et de la commande. 3. Rénovation de la façade de l’édifice historique du monastère avec l’église, y compris: a/architecture et construction; B/montage de l’installation SAP, enlèvement de fumée, CCTV et système d’alarme. 4. Installation d’une pompe à chaleur dans la tour. 5. Surcoûts: service juridique du projet, inspecteur de surveillance, supervision de l’auteur, surveillance de la conservation, supervision archéologique, gestion du projet, promotion des sources financières de l’UE. L’ensemble des travaux a été précédé de la préparation d’une documentation détaillée du conservat, qui a servi de base à l’élaboration de la documentation de construction. La documentation a été préparée par des spécialistes bien connus et reconnus dans le domaine de la conservation des monuments, et la surveillance constante des guerres. Le conservateur. Monuments historiques et de nombreuses consultations spécialisées. Au cours de la préparation de la documentation, ils garantissent que les solutions adoptées sont conformes aux meilleures pratiques pour les équipes historiques d’un rang aussi élevé. (French)
    1 December 2021
    0 references
    Das Kloster-Ensemble ist in Rej eingeschrieben. Die Denkmäler der Kriege. Der Affe. Das Ensemble ist auch eines von 176 Denkmälern auf der Liste der Objekte von Bedeutung Region. in Woj. Progr. Pflege der Denkmäler von Małopolska auf l. 2014-17 (Punkt 41). Ziel des Projekts ist es, die historischen Gebäude des SS-Klosterskomplexes neu zu beleben und vor der Zerstörung zu schützen. Norbertanek, Verbesserung des Brandschutzes des Turms, Verbesserung der Ästhetik des Klosterkomplexes (vor allem vor dem Hintergrund bereits renovierter Objekte) und macht den Klosterkomplex noch zugänglicher und attraktiver für Touristen, die Imbramowice, Trzyciąż i Woj besuchen. Małopolska. Gegenstand des Projekts ist die Fortsetzung der Erhaltungsarbeiten in der Klostergruppe, die folgende Aktivitäten umfassen wird: 1. Vorbereitende Kosten und/oder Vorbereitung der Finanzanalyse; B/Ausarbeitung fehlender Unterlagen und Kostenschätzungen. 2. Wartungsüberholung des Turms, einschließlich: a/Verstärkung des Fundaments b/Zugangsturm und Renovierung des Innenraums c/rekonstruierender Turmhelm d/Erhaltung der Uhr e/Ausstellung zeigt die Geschichte des Ortes und der Ordnung. 3. Renovierung der Fassade des historischen Klostergebäudes zusammen mit der Kirche, einschließlich: a/Architektur und Konstruktion; B/Montage von SAP Installation, Rauchentfernung, CCTV und Alarmanlage. 4. Installation einer Wärmepumpe im Turm. 5. Zusätzliche Kosten: Rechtsdienst des Projekts, Aufsichtsinspektor, Aufsicht des Autors, Erhaltungsaufsicht, archäologische Überwachung, Projektmanagement, Förderung von EU-Finanzquellen. Der gesamten Arbeit ging die Erstellung einer detaillierten Dokumentation des Konservats voraus, die die Grundlage für die Erstellung der Baudokumentation bildete. Die Dokumentation wurde von bekannten und anerkannten Spezialisten auf dem Gebiet der Denkmalpflege und der ständigen Überwachung der Kriege erstellt. Der Konservative. Historische Denkmäler und zahlreiche Fachkonsultationen. Bei der Vorbereitung der Dokumentation garantieren sie, dass die übernommenen Lösungen den bewährten Verfahren für historische Teams von so hohem Rang entsprechen. (German)
    7 December 2021
    0 references

    Identifiers

    RPMP.06.01.01-12-0107/16
    0 references