Reconstruction of the North and South II transmission network in Tychy (Q85010)
Jump to navigation
Jump to search
Project Q85010 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the North and South II transmission network in Tychy |
Project Q85010 in Poland |
Statements
1,270,000.0 zloty
0 references
4,221,170.5 zloty
0 references
30.09 percent
0 references
30 September 2016
0 references
28 February 2019
0 references
PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
0 references
projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowana izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych. (Polish)
0 references
the project consists of the conversion of channel heating networks with degraded thermal insulation and corrosion by heating pipes into a sewerless district heating network from modern pre-insulated pipes. (English)
14 October 2020
0 references
le projet consiste à reconstituer des réseaux de chauffage urbain sans conduits avec isolation thermique dégradée et conduites de chauffage affectées par la corrosion en un réseau de chauffage sans conduits à partir de conduites pré-isolées modernes. (French)
30 November 2021
0 references
das Projekt umfasst den Wiederaufbau kanalloser Fernwärmenetze mit degradierter Wärmedämmung und korrosionsbeeinflußten Heizleitungen in ein kanalloses Heiznetz aus modernen vorisolierten Rohren. (German)
7 December 2021
0 references
Identifiers
POIS.01.07.02-00-0005/16
0 references