Hermanowice Strachocin gas pipeline (Q86102)

From EU Knowledge Graph
Revision as of 09:36, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q86102 in Poland
Language Label Description Also known as
English
Hermanowice Strachocin gas pipeline
Project Q86102 in Poland

    Statements

    0 references
    0 references
    0 references
    146,210,751.0 zloty
    0 references
    35,090,580.24 Euro
    13 January 2020
    0 references
    267,581,181.84 zloty
    0 references
    64,219,483.64 Euro
    13 January 2020
    0 references
    54.64 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    49°25'48.7"N, 22°35'15.7"E
    0 references

    49°41'15.7"N, 22°10'16.7"E
    0 references

    49°41'34.1"N, 22°28'47.3"E
    0 references

    49°41'45.6"N, 22°44'43.8"E
    0 references

    49°44'0.6"N, 22°46'46.2"E
    0 references

    49°33'24.1"N, 22°12'42.1"E
    0 references

    49°34'34.3"N, 22°21'42.8"E
    0 references
    Przedmiotem Projektu jest budowa gazociągu Hermanowice-Strachocina. Projekt jest zlokalizowany na terenie gmin Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne należących do województwa podkarpackiego. W ramach Projektu przewiduje się realizację następujących przedsięwzięć: budowa gazociągu Hermanowice - Strachocina o następujących parametrach: średnica nominalna: 700 mm, ciśnienie robocze:8,4 MPa, długość gazociągu: L= 71,7 km, a także: pięciu zespołów zaporowo – upustowych, układu przyłączeniowego do węzła Hermanowice, układu regulacyjnego/redukcyjnego i pomiarowego na terenie węzła Hermanowice, śluzy nadawczo – odbiorczej tłoka na terenie węzła Hermanowice, układów, systemu ochrony katodowej, w tym stacji ochrony katodowej oraz układów zasilania (AKPiA) elektroenergetycznego wraz z przyłączami. (Polish)
    0 references
    The subject of the project is the construction of the Hermanowice-Strachocina gas pipeline. The project is located in the communes of Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne belonging to Podkarpackie Voivodeship. The project envisages the implementation of the following projects: construction of the Hermanowice – Strachocina pipeline with the following parameters: nominal diameter: 700 mm, working pressure: 8,4 MPa, pipeline length: L= 71,7 km as well as: five draw-off systems, connection system to Hermanowice node, regulation/reduction and measurement system in the area of Hermanowice node, transmission and reception locks in the Hermanowice node, systems, cathode protection system, cathode protection station and power supply systems (AKPiA) with connections. (English)
    14 October 2020
    0 references
    Le projet concerne la construction du gazoduc Hermanowice-Strachocina. Le projet est situé dans les municipalités de Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne appartenant à la voïvodie de Podkarpackie. Le projet prévoit la mise en œuvre des projets suivants: construction du gazoduc Hermanowice — Strachocina avec les paramètres suivants: diamètre nominal: 700 mm, pression robocze:8,4 MPa, longueur du pipeline: L= 71,7 km, ainsi que: cinq barrages et évents, un système de raccordement au nœud Hermanowice, un système de commande/réduction et de mesure dans le nœud Hermanowice, un émetteur-récepteur à piston au nœud Hermanowice, des systèmes, un système de protection contre les cathodes, y compris une station de protection contre les cathodes et des systèmes d’alimentation électrique (AKPiA) avec connexions électriques. (French)
    30 November 2021
    0 references
    Das Projekt betrifft den Bau der Gaspipeline Hermanowice-Strachocina. Das Projekt befindet sich in den Gemeinden Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne der Woiwodschaft Podkarpackie. Das Projekt sieht die Durchführung folgender Projekte vor: Bau der Gaspipeline Hermanowice – Strachocina mit folgenden Parametern: Nenndurchmesser: 700 mm, Druck robocze:8,4 MPa, Rohrleitungslänge: L= 71,7 km, sowie: fünf Damm- und Entlüftungseinheiten, ein Anschlusssystem zum Hermanowice-Knoten, ein Steuer-/Reduktions- und Messsystem im Hermanowice-Knoten, ein Kolben-Transceiver am Hermanowice-Knoten, Systeme, ein Kathodenschutzsystem, einschließlich einer Kathodenschutzstation und Netzteilsysteme (AKPiA) mit Stromanschlüssen. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.07.01.00-00-0002/16
    0 references