Reduce transmission losses in 110 kV electricity distribution lines through the development of innovative material and construction solutions and low-lost overhead cable production technologies. (Q84030)

From EU Knowledge Graph
Revision as of 09:14, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q84030 in Poland
Language Label Description Also known as
English
Reduce transmission losses in 110 kV electricity distribution lines through the development of innovative material and construction solutions and low-lost overhead cable production technologies.
Project Q84030 in Poland

    Statements

    0 references
    3,762,945.55 zloty
    0 references
    903,106.93 Euro
    13 January 2020
    0 references
    7,341,873.35 zloty
    0 references
    1,762,049.60 Euro
    13 January 2020
    0 references
    51.25 percent
    0 references
    1 April 2016
    0 references
    30 June 2019
    0 references
    BORYSZEW SPÓŁKA AKCYJNA
    0 references
    0 references
    Projekt zakłada przeprowadzenie badań naukowych przemysłowych i prac rozwojowych dotyczących opracowania innowacyjnych rozwiązań materiałowo-konstrukcyjnych napowietrznych przewodów elektroenergetycznych o podwyższonej efektywności energetycznej. Konstrukcje przewodów dedykowane są do linii dystrybucyjnych Wysokiego Napięcia o napięciu 110 kV. Założona poprawa efektywności energetycznej zostanie osiągnięta poprzez zmniejszenie rezystancji przewodu, co w konsekwencji pozwoli na obniżenie strat przesyłowych. Cel zostanie osiągnięty w wyniku optymalizacji konstrukcji przewodu z drutami profilowymi w oparciu o nowoopracowany gatunek aluminium serii 1000, unikatową konstrukcję oraz technologię obróbki powierzchni. Wyniki projektu dedykowane są krajowym i zagranicznym Operatorom Systemu Dystrybucyjnego (OSD) energii elektrycznej, którzy w najbliższych latach planują szeroki zakres modernizacji linii dystrybucyjnych WN o napięciu 110 kV. Rezultaty projektu wpisują się realizację polityki europejskiej w zakresie zwiększania efektywności energetycznej (UE 2006/32/WE). (Polish)
    0 references
    The project involves carrying out industrial research and development work on the development of innovative material and construction solutions for overhead power cords with increased energy efficiency. Cable constructions are dedicated to the distribution lines of the High Voltage 110 kV. The expected improvement in energy efficiency will be achieved by reducing cable resistance, which will consequently reduce transmission losses. The goal will be achieved by optimising the wire structure with profile wires based on the newly developed grade of aluminium 1000 series, unique construction and surface treatment technology. The results of the project are dedicated to domestic and foreign Operators of the Distribution System (OSD) of electricity, who in the coming years plan a wide range of modernisation of WN distribution lines with a voltage of 110 kV. The results of the project are in line with the implementation of European energy efficiency policy (EU 2006/32/EC). (English)
    14 October 2020
    0 references
    Le projet consiste à mener des travaux de recherche et de développement industriels sur le développement de matériaux innovants et de solutions de construction pour les câbles électriques aériens avec une efficacité énergétique accrue. Les constructions de câbles sont dédiées aux lignes de distribution de haute tension avec une tension de 110 kV. L’amélioration prévue de l’efficacité énergétique sera réalisée en réduisant la résistance du câble, ce qui réduira les pertes de transmission. L’objectif sera atteint en optimisant la construction du fil avec des fils de profilés basés sur la nouvelle catégorie d’aluminium de la série 1000, la conception unique et la technologie de traitement de surface. Les résultats du projet sont dédiés aux gestionnaires de réseaux de distribution (OSD) nationaux et étrangers d’électricité qui, dans les années à venir, prévoient une vaste gamme de modernisation des lignes de distribution de WN avec une tension de 110 kV. Les résultats du projet sont liés à la mise en œuvre de la politique européenne d’efficacité énergétique (UE 2006/32/CE). (French)
    30 November 2021
    0 references
    Das Projekt umfasst die Durchführung industrieller Forschungs- und Entwicklungsarbeiten an der Entwicklung innovativer Material- und Baulösungen für Freileitungskabel mit erhöhter Energieeffizienz. Kabelkonstruktionen sind für Verteilerleitungen von Hochspannung mit einer Spannung von 110 kV gewidmet. Die geplante Verbesserung der Energieeffizienz wird erreicht, indem der Widerstand des Kabels verringert wird, wodurch die Übertragungsverluste verringert werden. Das Ziel wird erreicht, indem die Konstruktion des Drahtes mit Profildrähten auf Basis der neu entwickelten Aluminiumklasse 1000 Serie, einzigartiger Design- und Oberflächenbehandlungstechnik optimiert wird. Die Ergebnisse des Projekts sind den inländischen und ausländischen Verteilernetzbetreibern (OSD) des Stroms gewidmet, die in den kommenden Jahren ein breites Spektrum an Modernisierung der Verteilerleitungen von WN mit einer Spannung von 110 kV planen. Die Ergebnisse des Projekts sind mit der Umsetzung der europäischen Energieeffizienzpolitik (EU 2006/32/EG) verknüpft. (German)
    7 December 2021
    0 references

    Identifiers

    POIR.04.01.04-00-0022/15
    0 references