Extension of the municipal water supply network in Linowo area – 1st stage from junction No 219 to 301/118; Second stage from no. 301/118 to 179/71 (Q2717371)
Jump to navigation
Jump to search
Project Q2717371 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the municipal water supply network in Linowo area – 1st stage from junction No 219 to 301/118; Second stage from no. 301/118 to 179/71 |
Project Q2717371 in Poland |
Statements
203,501.28 zloty
0 references
239,413.27 zloty
0 references
85.0 percent
0 references
9 June 2017
0 references
18 November 2020
0 references
GMINA DŹWIERZUTY
0 references
Projekt stanowi samodzielną jednostkę analizy i obejmuje wszystkie zadania niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po realizacji zakresu rzeczowego. Dla uruchomienia produktów projektu nie jest wymagana realizacja innych zadań. 1. Lokalizacja a) Rozbudowa gminnej sieci wodociągowej w m. Linowo obręb Linowo – I etap: obejmuje budowę sieci wodociągowej poprzez montaż rurociągów z rur PE SDR17 PN10 o średnicy zewnętrznej 160 mm i długości 423,5. Podłączenie instalacji do sieci wodociągowych - trójniki wbudowane do istniejących rurociągów. Dodatkowo zaplanowano m.in. odtworzenie nawierzchni betonowej, żwirowej oraz ogrodzenia a także montaż hydrantów pożarowych naziemnych. b) Rozbudowa gminnej sieci wodociągowej w m. Linowo obręb Linowo – II etap: obejmuje budowę sieci wodociągowej poprzez montaż rurociągów z rur PE SDR17 PN10 o średnicy zewnętrznej 160 mm i długości 787,5 m. Dodatkowo zaplanowano m.in. odtworzenie nawierzchni żwirowej a także montaż hydrantów pożarowych naziemnych. Wnioskodawcą, Inwestorem i Beneficjentem jest Gmina Dźwierzuty. Zarządzanie projektem w formie zespołu projektowego działającego w oparciu o metodykę PCM i mechanizmy partycypacyjne. Za projekt będzie odpowiedzialny Urząd Gminy w Dźwierzutach. Projekt nie jest duży i nie jest objęty pomocą publiczną. Projekt wpisuje się założenia SZOOP WiM 2014-2020: Działanie 5.2 Gospodarka wodno-ściekowa, OP 5. Środowisko przyrodnicze i racjonalne wykorzystanie zasobów poprzez zwiększenie dostępu do lepszej jakości wody i do zachowania i ochrony środowiska przyrodniczego i efektywnego gospodarowania zasobami. (Polish)
0 references
The project is a stand-alone unit of analysis and covers all tasks necessary to ensure the functionality and operability of the infrastructure as soon as the material scope is completed. Other tasks are not required to launch project products. 1. Location a) Expansion of the municipal water supply network in Linowo – 1st stage: it includes the construction of a water supply network by installing pipelines from PE SDR17 PN10 pipes with an external diameter of 160 mm and a length of 423.5. Connection of the installation to the water supply network – tees built into existing pipelines. In addition, the reconstruction of concrete pavement, gravel pavement and fence as well as the installation of ground fire hydrants are planned. b) Expansion of the municipal water supply network in the Linowo region – II stage: it includes the construction of a water supply network through the installation of pipelines from PE SDR17 PN10 pipes with an external diameter of 160 mm and a length of 787.5 m. In addition, it is planned to reconstruct the gravel surface as well as the installation of ground fire hydrants. The Applicant, Investor and Beneficiary is the Municipality of Dzwierzuty. Project management in the form of a project team operating on the basis of PCM methodology and participatory mechanisms. The project will be under the responsibility of the Municipality Office in Dzwierzuty. The project is not large and does not benefit from state aid. The draft follows the assumptions of the SZOOP WiM 2014-2020: Measure 5.2 Water and wastewater management, OP 5. The natural environment and resource efficiency by increasing access to better water quality and to preserving and protecting the natural environment and resource efficiency. (English)
8 July 2021
0 references
Le projet est une unité d’analyse autonome et couvre toutes les tâches nécessaires pour assurer la fonctionnalité et l’exploitation de l’infrastructure dès que le champ d’application matériel est terminé. D’autres tâches ne sont pas nécessaires pour lancer les produits du projet. 1. Emplacement a) Élargissement du réseau municipal d’approvisionnement en eau à Linowo — 1ère étape: elle comprend la construction d’un réseau d’approvisionnement en eau en installant des conduites PE SDR17 PN10 d’un diamètre extérieur de 160 mm et d’une longueur de 423,5. Raccordement de l’installation au réseau d’adduction d’eau — tees intégrés dans les canalisations existantes. En outre, la reconstruction des trottoirs en béton, des trottoirs de gravier et des clôtures ainsi que l’installation de bouches d’incendie au sol sont prévues. b) Élargissement du réseau municipal d’approvisionnement en eau dans la région de Linowo — phase II: il comprend la construction d’un réseau d’alimentation en eau par l’installation de canalisations à partir de tuyaux PE SDR17 PN10 d’un diamètre extérieur de 160 mm et d’une longueur de 787,5 m. En outre, il est prévu de reconstruire la surface de gravier ainsi que l’installation d’une bouche d’incendie au sol. La requérante, l’investisseur et le bénéficiaire sont la municipalité de Dzwierzuty. Gestion de projet sous la forme d’une équipe de projet fonctionnant sur la base de la méthodologie de la gestion des projets et des mécanismes participatifs. Le projet sera placé sous la responsabilité du bureau municipal de Dzwierzuty. Le projet n’est pas grand et ne bénéficie pas d’aides d’État. Le projet suit les hypothèses du SZOOP WiM 2014-2020: Mesure 5.2 Gestion de l’eau et des eaux usées, PO 5. L’environnement naturel et l’utilisation efficace des ressources en améliorant l’accès à une meilleure qualité de l’eau et en préservant et protégeant l’environnement naturel et l’utilisation efficace des ressources. (French)
4 December 2021
0 references
Identifiers
RPWM.05.02.00-28-0005/20
0 references