Construction of photovoltaic installations for own needs of public buildings in the Municipality of Nowe Piekuty (Q2711151)

From EU Knowledge Graph
Revision as of 10:51, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2711151 in Poland
Language Label Description Also known as
English
Construction of photovoltaic installations for own needs of public buildings in the Municipality of Nowe Piekuty
Project Q2711151 in Poland

    Statements

    0 references
    73,799.98 zloty
    0 references
    16,405.74 Euro
    0.2223 Euro
    0 references
    98,400.0 zloty
    0 references
    21,874.32 Euro
    0.2223 Euro
    0 references
    75.0 percent
    0 references
    3 March 2020
    0 references
    15 December 2020
    0 references
    GMINA NOWE PIEKUTY
    0 references

    52°51'18.7"N, 22°42'24.1"E
    0 references
    Projekt zakłada dostawę i montaż kompletnych 2 zestawów fotowoltaicznych oraz wpięcie ich w istniejące systemy instalacji. Projekt będzie realizowany w całości na terenie gminy Nowe Piekuty. Instalacje będą montowane na budynkach należących do gminy: - Instalacja fotowoltaiczna na potrzeby Urzędu Gminy Nowe Piekuty (montowana na dachu) - Nowe Piekuty, ul. Główna 8, 18-212 Nowe Piekuty, nr. ewid. działki 126/2, obręb Nowe Piekuty, - Instalacja fotowoltaiczna na potrzeby Gminnego Ośrodka Kultury w Nowych Piekutach (montowana na dachu) - Nowe Piekuty, ul. Główna 23, 18-212 Nowe Piekuty, dz. nr ew. 55/5, 56/3, obręb Nowe Piekuty. Projekt zakłada dostawę i montaż kompletnych 2 zestawów fotowoltaicznych oraz wpięcie ich w istniejące systemy instalacji. Projekt posiada dwie grupy celów: kwantyfikowane cele bezpośrednie i cele o wymiarze społecznym, gospodarczym i środowiskowym (trudne do kwantyfikacji). Celami bezpośrednimi projektu są: wzrost produkcji energii z OZE i redukcja emisji CO2. Projekt obejmuje zadania: Zadanie 1. Zakup i montaż 2 instalacji fotowoltaicznych (Instalacja fotowoltaiczna na potrzeby Urzędu Gminy Nowe Piekuty, Instalacja fotowoltaiczna na potrzeby Gminnego Ośrodka Kultury w Nowych Piekutach). Zadanie 2. Nadzór inwestorski Beneficjentem Projektu i Wnioskodawcą jest Gmina Nowe Piekuty, która jako jednostka samorządu terytorialnego jest kwalifikowana do wsparcia w ramach Działania 5.1. RPO WP. Beneficjenci ostateczni projektu to mieszkańcy gminy, użytkownicy obiektów w których zostaną zainstalowane urządzenia. Wskaźniki projektu: - Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 2 szt. - Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych – 0,01 MW - Szacowany roczny spadek emisji gazów cieplarnianych - 7,70 Mg/ rok. CO2/rok - Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 9,49 MWh/rok (Polish)
    0 references
    The project involves the delivery and assembly of complete 2 photovoltaic sets and their integration into existing systems of installation. The project will be implemented entirely in the municipality of Nowe Piekuty. The installations will be installed on buildings belonging to the municipality: — Photovoltaic installation for the needs of the Municipality Office of Nowe Piekuty (mounted on the roof) – Nowe Piekuty, ul. Main 8, 18-212 New Piekuty, no. plot 126/2, New Piekuty area, – Photovoltaic installation for the needs of the Municipal Cultural Centre in New Piekuty (mounted on the roof) – Nowe Piekuty, ul. Main 23, 18-212 New Piekuty, ref. no. 55/5, 56/3, area of New Piekuty. The project involves the delivery and assembly of complete 2 photovoltaic sets and their integration into existing systems of installation. The project has two objectives: quantified direct and social, economic and environmental objectives (difficult to quantify). The direct objectives of the project are: increase of energy production from RES and reduction of CO2 emissions. The project includes the following tasks: Activity 1. Purchase and assembly of 2 photovoltaic installations (PV installation for the needs of the Municipality Office of Nowe Piekuty, Photovoltaic installation for the purposes of the Municipal Cultural Centre in New Piekuty). Task 2. Investor supervision The beneficiary of the Project and the Applicant is the Municipality of Nowe Piekuty, which, as a local government unit, is eligible for support under Measure 5.1. ROP PP The final beneficiaries of the project are residents of the municipality, users of the facilities where the equipment will be installed. Project indicators: — Number of RES electricity generation units built – 2 units — Additional renewable energy generation capacity – 0.01 MW – Estimated annual reduction in greenhouse gas emissions – 7.70 Mg/year. CO2/year – Electricity production from newly built RES installations – 9.49 MWh/year (English)
    8 July 2021
    0 references
    Le projet comprend la livraison et l’assemblage de 2 ensembles photovoltaïques complets et leur intégration dans les systèmes d’installation existants. Le projet sera entièrement mis en œuvre dans la municipalité de Nowe Piekuty. Les installations seront installées sur des bâtiments appartenant à la commune: — Installation photovoltaïque pour les besoins du bureau municipal de Nowe Piekuty (monté sur le toit) — Nowe Piekuty, ul. Main 8, 18-212 Nouvelle Piekuty, no 126/2, région de New Piekuty, — Installation photovoltaïque pour les besoins du Centre culturel municipal de New Piekuty (monté sur le toit) — Nowe Piekuty, ul. Main 23, 18-212 New Piekuty, réf. 55/5, 56/3, zone de New Piekuty. Le projet comprend la livraison et l’assemblage de 2 ensembles photovoltaïques complets et leur intégration dans les systèmes d’installation existants. Le projet poursuit deux objectifs: objectifs chiffrés directs et sociaux, économiques et environnementaux (difficile à quantifier). Les objectifs directs du projet sont les suivants: augmentation de la production d’énergie à partir des sources d’énergie renouvelables et réduction des émissions de CO2. Le projet comprend les tâches suivantes: Activité 1. Achat et montage de 2 installations photovoltaïques (installation photovoltaïque pour les besoins du bureau municipal de Nowe Piekuty, installation photovoltaïque pour les besoins du centre culturel municipal de New Piekuty). Tâche 2. Surveillance des investisseurs Le bénéficiaire du projet et la requérante sont la municipalité de Nowe Piekuty, qui, en tant qu’unité de l’administration locale, peut bénéficier d’un soutien au titre de la mesure 5.1. ROP PP Les bénéficiaires finaux du projet sont les résidents de la municipalité, les utilisateurs des installations où l’équipement sera installé. Indicateurs de projet: — Nombre d’unités de production d’électricité SER construites — 2 unités — Capacité supplémentaire de production d’énergie renouvelable — 0,01 MW — Réduction annuelle estimée des émissions de gaz à effet de serre — 7,70 Mg/an. CO2/an — Production d’électricité provenant d’installations SER nouvellement construites — 9,49 MWh/an (French)
    4 December 2021
    0 references

    Identifiers

    RPPD.05.01.00-20-0547/19
    0 references