MRS. MATERAN-SALANRA (Q2021712)

From EU Knowledge Graph
Revision as of 06:50, 29 December 2020 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q2500930 was merged with Q252898)
Jump to navigation Jump to search
Project Q2021712 in Italy
Language Label Description Also known as
English
MRS. MATERAN-SALANRA
Project Q2021712 in Italy

    Statements

    0 references
    11,728,969.24 Euro
    0 references
    15,876,572.91 Euro
    0 references
    73.88 percent
    0 references
    6 December 2017
    0 references
    31 July 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°40'6.67"N, 16°36'5.72"E
    0 references
    LA PROPOSTA PROGETTUALE IN ESAME RIGUARDA LA REALIZZAZIONE DEL NUOVO ELETTRODOTTO A 150 KV MATERA - SALANDRA E SI COMPONE DELL'INSIEME DEI SINGOLI ELETTRODOTTI GROTTOLE - MATERA CP, GROTTOLE - SALANDRA E SALANDRA - SAN MAURO FORTE AFFERENTI ALLA REGIONE BASILICATA E RISULTA STRETTAMENTE COMPLEMENTARE AGLI INTERVENTI SULLE RETI DI DISTRIBUZIONE NELL'AREA DI INTERESSE VOLTI AD INCREMENTARE LO SFRUTTAMENTO DI GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI CONNESSA A TALI RETI NELLA MISURA IN CUI CONSENTIRà DI EVITARE QUOTA PARTE DELLA MANCATA PRODUZIONE EOLICA (MPE) PREVEDIBILE NELL'AREA.LA PROPOSTA PROGETTUALE IN ESAME INERISCE LA REALIZZAZIONE DI CIRCA 32 KM DI LINEA 150 KV SEMPLICE TERNA AEREA IL CUI TRACCIATO RIPERCORRERà PER CIRCA 21 KM LA LINEA ESISTENTE E, PER LA PARTE RIMANENTE, CONSENTIRà UNA VARIANTE ALL'ATTUALE LINEA CONSENTENDO DI LIBERARE UNA BUONA PORZIONE DEL TERRITORIO DALL'INFRASTRUTTURA ELETTRICA.LE SUE MOTIVAZIONI RISIEDONO PRINCIPALMENTE NELLA NECESSITà DI AUMENTARE (Italian)
    0 references
    THIS PROJECT PROPOSAL CONCERNS THE CONSTRUCTION OF THE NEW 150 KV “MATERA — SALANDRA” ELECTRICAL POWER LINE — MATERA CP, GROWLE — SALANDRA AND SALANDRA — SAN MAURO IN RELATION TO THE REGION OF BASILICATA AND IS CLOSELY COMPLEMENTARY TO THE INTERVENTIONS ON DISTRIBUTION NETWORKS IN THE AREA OF INTEREST TO INCREASE THE EXPLOITATION OF DISTRIBUTED GENERATION FROM RENEWABLE SOURCES CONNECTED TO SUCH NETWORKS IN SO FAR AS THE PROPOSED PROJECT UNDER CONSIDERATION IS THAT OF APPROXIMATELY 32 KM OF LINE 150 KV WHICH WILL BE ACHIEVED BY APPROXIMATELY 21 KM OF THE EXISTING LINE AND, FOR THE REMAINING PART, THE CURRENT LINE WILL BE ABLE TO FREE UP A LARGE PORTION OF THE TERRITORY FROM THE ELECTRICAL INFRASTRUCTURE, THE REASONS FOR WHICH ARE MAINLY IN THE NEED TO INCREASE (English)
    0 references

    Identifiers

    G23G17001530007
    0 references