Reservoirs and polders – Lake Lake Tank – modernisation of the weir (Q2702369)

From EU Knowledge Graph
Revision as of 09:20, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2702369 in Poland
Language Label Description Also known as
English
Reservoirs and polders – Lake Lake Tank – modernisation of the weir
Project Q2702369 in Poland

    Statements

    0 references
    16,053,025.56 zloty
    0 references
    3,568,587.58 Euro
    0.2223 Euro
    0 references
    18,885,912.43 zloty
    0 references
    4,198,338.33 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references
    Przedmiotem projektu jest przeprowadzenie kompleksowego remontu jazu przel.-upust. w zaporze czołowej zb. wodnego "Jeziorsko". Jaz ma za zadanie regulację przepływu wody i jest zlokalizowany w środkowej części zapory, w km 1+264. Dzięki sprawnej pracy jazu zbiornik spełnia funkcję retencyjną oraz zapewnia bezpieczeństwo przeciwpow. (ochrona na wypadek powodzi i suszy). Projekt zakłada realizację następujących zadań: Zadanie 1. Roboty budowlane A także zadań wyszczególnionych jako koszty pośrednie: - nadzór przyrodniczy - informacja i promocja Celem projektu jest zwiększenie bezpieczeństwa powodziowego poprzez poprawę stanu technicznego oraz warunków eksploatacyjnych jazu przelewowo-upustowego, dzięki czemu możliwe będzie uzyskanie niezawodnej i prawidłowej pracy całego obiektu szczególnie podczas przepuszczania przez jaz wód powodziowych. Osiągnięcie zakładanego celu będzie możliwe poprzez wykonanie robót polegających na remoncie poszczególnych urządzeń funkcjonalnie związanych z jazem przelewowo-upustowym, tj. hydrotechnicznych, sterowania, elektrycznych czy mechanicznych i systemu wizyjnego, mających bezpośredni wpływ na niezawodność obiektu i związane z tym bezpieczeństwo przeciwpowodziowe samego obiektu jak również terenów zlokalizowanych poniżej Zbiornika. Projekt będzie zgodny z koncepcją projektowania uniwer. - w ramach projektu nie zostanie wytworzona nowa infrastr. Realiz. zadania ma istotny wpływ na ukierunkowanie ogólnodostępnego ruchu turystycz. i rekr. na obszarach cennych przyrodniczo i leżących wokół zbiornika, stworzenie dogodnych warunków dla całego społecz. Wskaźniki produktu Liczba wyremontowanych urządzeń dla celów ochrony przeciwpowodziowej: 1 szt. Wskaźniki rezultatu Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej (CI20): 536 osób Powierzchnia terenu objęta ochroną przeciwpowodziową: 10 926,90 ha (Polish)
    0 references
    The object of the project is to carry out a comprehensive refurbishment of the weir in the water dam “Jeziorsko”. Jaz is designed to regulate the flow of water and is located in the middle of the dam, in km 1 + 264. Thanks to the efficient operation of the weir, the tank fulfils the function of retention and ensures the safety of anti-powders. (protection against floods and droughts). The project assumes the following tasks: Activity 1. Works and tasks listed as indirect costs: — natural supervision – information and promotion The aim of the project is to increase flood safety by improving the technical condition and operating conditions of the overflow and upstream weir, thanks to which it will be possible to obtain reliable and correct operation of the entire facility, especially when passing through the flood water weirs. Achieving the target will be possible by performing works consisting of refurbishment of individual devices functionally related to the overflow and discharge weir, i.e. hydrotechnical, control, electrical or mechanical and video system, which have a direct impact on the reliability of the facility and the associated flood safety of the object itself as well as the areas located below the Tank. The design will be in line with the design concept of the Univer. — the project will not create a new infrastr. The implementation of tasks has a significant impact on the direction of public tourism and rec. traffic in areas of valuable nature and surrounding the reservoir, creating favourable conditions for the whole society. Output indicators Number of refurbished equipment for flood protection purposes: 1 pcs. Result indicators Number of population benefiting from flood protection measures (CI20): 536 persons The area covered by flood protection: 10926,90 ha (English)
    7 July 2021
    0 references
    L’objet du projet est de réaliser une rénovation complète du déversoir dans le barrage d’eau «Jeziorsko». Jaz est conçu pour réguler l’écoulement de l’eau et est situé au milieu du barrage, au km 1 + 264. Grâce au fonctionnement efficace du déversoir, le réservoir remplit la fonction de rétention et assure la sécurité des antipoudres. (protection contre les inondations et les sécheresses). Le projet assume les tâches suivantes: Activité 1. Travaux et tâches répertoriés comme coûts indirects: — supervision naturelle — information et promotion L’objectif du projet est d’améliorer la sécurité des inondations en améliorant l’état technique et les conditions d’exploitation du débordement et du déversoir en amont, grâce auxquels il sera possible d’obtenir un fonctionnement fiable et correct de l’ensemble de l’installation, notamment en passant par les déversoirs d’eau d’inondation. La réalisation de l’objectif sera possible en réalisant des travaux de remise à neuf de différents dispositifs fonctionnellement liés au déversoir de débordement et de décharge, c’est-à-dire le système hydrotechnique, de contrôle, électrique ou mécanique et vidéo, qui ont un impact direct sur la fiabilité de l’installation et la sécurité d’inondation associée de l’objet lui-même ainsi que des zones situées au-dessous du réservoir. La conception sera conforme au concept de conception de l’Univer. — le projet ne créera pas un nouvel infrastr. L’exécution des tâches a un impact significatif sur l’orientation du tourisme public et de la circulation dans les zones de valeur et autour du réservoir, créant des conditions favorables à l’ensemble de la société. Indicateurs de réalisation Nombre d’équipements remis à neuf à des fins de protection contre les inondations: 1 pcs. Indicateurs de résultat Nombre de population bénéficiant de mesures de protection contre les inondations (CI20): 536 personnes La zone couverte par la protection contre les inondations: 10 926,90 ha (French)
    4 December 2021
    0 references

    Identifiers

    RPLD.05.01.01-10-0002/19
    0 references