Construction of a system for collecting and retaining rainwater through the construction of retention and drainage reservoirs and rainwater drainage systems together with accompanying infrastructure in Lubin within the streets of W. Komara, T. Ślusarskigo, J. Kusociński (Q2698563)

From EU Knowledge Graph
Revision as of 08:49, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2698563 in Poland
Language Label Description Also known as
English
Construction of a system for collecting and retaining rainwater through the construction of retention and drainage reservoirs and rainwater drainage systems together with accompanying infrastructure in Lubin within the streets of W. Komara, T. Ślusarskigo, J. Kusociński
Project Q2698563 in Poland

    Statements

    0 references
    3,610,046.85 zloty
    0 references
    802,513.41 Euro
    0.2223 Euro
    0 references
    4,247,113.94 zloty
    0 references
    944,133.43 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 August 2020
    0 references
    30 October 2021
    0 references
    GMINA MIEJSKA LUBIN
    0 references
    0 references

    51°23'58.9"N, 16°11'57.5"E
    0 references
    Przedmiotem projektu jest budowa zintegrowanego systemu odbioru i zagospodarowania wód opadowych poprzez budowę kanalizacji deszczowej o długości 2,6km wraz z infrastrukturą towarzyszącą oraz 3 zbiorników retencyjno rozsączających o łącznej kubaturze 255,1 m3. Przedsięwzięcie obejmuje swym zasięgiem ulice W. Komara, T. Ślusarskiego, J. Kusocińskiego będące częścią osiedla Małomice w Lubinie. Realizacja przedsięwzięcia umożliwi odbiór, retencjonowanie i zagospodarowanie nadmiaru wód opadowych z osiedla Małomice, z obszaru o powierzchni 2,97 ha, na którym obecnie zamieszkuje 171 osób. Projekt obejmuje wykonanie sieci kanalizacji deszczowej o długości 2,6 km, trzech zbiorników retencyjno-rozsączających (ZB1 - o kubaturze 236,8m3, ZB2 o kubaturze 12,9m3, ZB3 o kubaturze 5,4m3), infrastruktury towarzyszącej w postaci piaskownika przed zbiornikiem ZB1, 7 studni osadnikowych oraz wylotu do potoku Małomickiego. Zakres projektu stanowi w pełni funkcjonujący system zagospodarowania nadmiaru wód deszczowych ze zlewni. Realizacja projektu nie wymaga dodatkowych przedsięwzięć do prawidłowego jego działania, a sam projekt nie zawiera instalacji i elementów nie mających bezpośredniego wpływu na funkcjonowanie systemu. Realizacja projektu przyczyni się do poprawy bezpieczeństwa mieszkańców Lubina poprzez budowę sieci kanalizacji deszczowej wraz infrastrukturą towarzyszącą mających za zadanie odbiór i zagospodarowanie wód opadowych podczas intensywnych opadów deszczu. Wybrana technologia jest wynikiem przeprowadzonych prac koncepcyjnych. W fazie koncepcyjnej zaproponowano 4 warianty rozwiązania problemu wód opadowych na terenie objętym projektem. Wybrany wariant okazał się optymalnym. Wnioskodawca dysponuje odpowiednimi zasobami kadrowymi oraz zapleczem technicznymi i organizacyjnym niezbędnym do realizacji inwestycji.Projekt jest przygotowany do realizacji. W ramach projektu część wydatków realizowana będzie w ramach kosztów pośrednich przy zastosowaniu stawki ryczałtowej ( (Polish)
    0 references
    The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a 2,6 km long rainwater drainage system with accompanying infrastructure and 3 drainage reservoirs with a total volume of 255.1 m³. The project covers the streets of W. Komara, T. Ślusarskigo and J. Kusociński, which are part of the Małomice estate in Lubin. Implementation of the project will enable the collection, retention and management of excess rainwater from the Malomice estate, from an area of 2.97 hectares, where 171 people currently live. The project includes the construction of a 2,6 km long rain drainage network, three retention and drainage tanks (ZB1 – with a volume of 236.8 m³, ZB2 with a volume of 12.9 m³, ZB3 with a volume of 5.4 m³), accompanying infrastructure in the form of a sandbox in front of the ZB1 reservoir, 7 settlement wells and a outlet to the Małomicki stream. The scope of the project is a fully functioning system for managing excess rainwater from the catchment area. The implementation of the project does not require additional projects for its proper operation and the project itself does not contain installations and elements that do not directly affect the functioning of the system. The implementation of the project will contribute to improving the safety of Lubin’s inhabitants by building a rainwater network with accompanying infrastructure for the collection and management of rainwater during heavy rain. The chosen technology is the result of the conceptual work carried out. In the concept phase, 4 options were proposed to address the problem of rainwater in the area covered by the project. The chosen option turned out to be optimal. The applicant has the appropriate human resources and the technical and organisational resources necessary for the implementation of the investment. The project is prepared for implementation. As part of the project, part of the expenditure will be implemented through indirect costs using a flat rate ( (English)
    7 July 2021
    0 references
    L’objet du projet est la construction d’un système intégré de collecte et de gestion de l’eau de pluie grâce à la construction d’un système de drainage des eaux de pluie de 2,6 km de long avec des infrastructures d’accompagnement et de 3 réservoirs de drainage d’un volume total de 255,1 m³. Le projet couvre les rues de W. Komara, T. Ślusarskigo et J. Kusociński, qui font partie du domaine Małomice à Lubin. La mise en œuvre du projet permettra la collecte, la rétention et la gestion des eaux de pluie excédentaires du domaine Malomice, d’une superficie de 2,97 hectares, où 171 personnes vivent actuellement. Le projet comprend la construction d’un réseau de drainage pluvial de 2,6 km, de trois réservoirs de rétention et de drainage (ZB1 — d’un volume de 236,8 m³, ZB2 d’un volume de 12,9 m³, ZB3 d’un volume de 5,4 m³), d’une infrastructure d’accompagnement sous la forme d’un bac à sable devant le réservoir ZB1, de 7 puits de peuplement et d’une sortie vers le ruisseau Małomicki. La portée du projet est un système pleinement opérationnel de gestion des eaux de pluie excédentaires provenant du bassin versant. La mise en œuvre du projet n’exige pas de projets supplémentaires pour son bon fonctionnement et le projet lui-même ne contient pas d’installations et d’éléments qui n’ont pas d’incidence directe sur le fonctionnement du système. La mise en œuvre du projet contribuera à améliorer la sécurité des habitants de Lubin en construisant un réseau d’eau de pluie avec des infrastructures d’accompagnement pour la collecte et la gestion de l’eau de pluie en cas de fortes pluies. La technologie choisie est le résultat du travail conceptuel effectué. Au cours de la phase conceptuelle, quatre options ont été proposées pour résoudre le problème de l’eau de pluie dans la zone couverte par le projet. L’option choisie s’est avérée optimale. Le demandeur dispose des ressources humaines appropriées et des ressources techniques et organisationnelles nécessaires à la réalisation de l’investissement. Le projet est préparé pour la mise en œuvre. Dans le cadre du projet, une partie des dépenses sera mise en œuvre au moyen de coûts indirects à l’aide d’un taux forfaitaire ( (French)
    4 December 2021
    0 references

    Identifiers

    RPDS.04.05.01-02-0005/19
    0 references