Reducing the energy performance of the building of the Cheb Municipal Office, King George’s Square 1/14 (Q73372)

From EU Knowledge Graph
Revision as of 08:10, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q73372 in Czech Republic
Language Label Description Also known as
English
Reducing the energy performance of the building of the Cheb Municipal Office, King George’s Square 1/14
Project Q73372 in Czech Republic

    Statements

    0 references
    1,953,443.2 Czech koruna
    0 references
    78,137.73 Euro
    10 January 2020
    0 references
    4,883,608.0 Czech koruna
    0 references
    195,344.32 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    17 July 2019
    0 references
    31 January 2021
    0 references
    Město Cheb
    0 references
    0 references
    0 references

    50°3'50.83"N, 12°22'28.99"E
    0 references

    50°4'24.67"N, 12°23'16.44"E
    0 references
    35002
    0 references
    Předmětem projektu je zateplení obálky budovy Městského úřadu v Chebu. MÚ sídlí ve dvou objektech na nám. Krále Jiřího z Poděbrad čp. 1/14 (parcela st. 126), čp. 514/13 (parcela st. 136) a v objektu v ulici Školí čp. 646/4 (parcela st. 5426) v k.ú. Cheb (650919). Budova je Kulturní památkou, nachází se v Městské památkové rezervaci a část interiéru objektu MÚ je památkově chráněná. Zateplení zahrnuje zateplení stropů a stěn do nevytápěné půdy a výměnu výplní otvorů. (Czech)
    0 references
    The object of the project is to insulate the envelope of the building of the Municipal Office in Cheb. The MÚ is located in two buildings on us. King George of Poděbrady. 1/14 (parcela st. 126), i.e. 514/13 (parcela st. 136) and in the building in Školí street 646/4 (parcela st. 5426) in k.ú. Cheb (650919). The building is a Cultural Monument, it is located in the Municipal Monument Reserve and part of the interior of the building is protected. Thermal insulation includes insulated ceilings and walls into unheated soil and replacement of opening fillings. (English)
    23 October 2020
    0 references
    L’objet du projet est l’isolation de l’enveloppe du bâtiment de l’autorité municipale de Cheb. Le protocole d’accord est situé dans deux bâtiments sur nous. Roi George de Poděbrady No. 1/14 (parcellaire, art. 126), no. 514/13 (Parcella st. 136) et dans le bâtiment dans la rue Školí čp. 646/4 (parcelle 5426) en UC Cheb (650919). Le bâtiment est un monument culturel, il est situé dans la réserve patrimoniale municipale et une partie de l’intérieur du bâtiment MÚ est classé. L’isolation comprend l’isolation des plafonds et des murs dans le sol non chauffé et le remplacement des trous de remplissage. (French)
    29 November 2021
    0 references
    Gegenstand des Projekts ist die Isolierung des Umschlags des Gebäudes der Gemeindeverwaltung in Cheb. Die MoU befindet sich in zwei Gebäuden auf uns. König Georg von Poděbrady Nr. 1/14 (Parcella st. 126), Nr. 514/13 (Parcella st. 136) und im Gebäude in der Straße Školí čp. 646/4 (parcel st. 5426) in CU Cheb (650919). Das Gebäude ist ein Kulturdenkmal, es befindet sich im Stadterbe-Reservat und Teil des Inneren des MÚ-Gebäudes ist aufgeführt. Die Isolierung umfasst die Isolierung von Decken und Wänden in unbeheizten Boden und den Austausch von Fülllöchern. (German)
    3 December 2021
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/17_070/0006515
    0 references