Construction of rainwater drainage in Barlink (Q137839)

From EU Knowledge Graph
Revision as of 22:05, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’un système d’eau de pluie à BarLink sur des parcelles de numerze:obręb 2 Barlinek, les parcelles no 674, 688/7, 651/9, 660/12 (de la division de la parcelle 660/1), 695/1 et la superficie 1 Barlinek, les parcelles no 458562, 564, 584, 586, 592/3, 592/14, 705707/1, 709, 710/1, 566.L’investissement couvre ul. Flukowskiego et ul. L’investissement s’inscrit dans le cadre d’un vaste projet (précédemment mis en...)
Jump to navigation Jump to search
Project Q137839 in Poland
Language Label Description Also known as
English
Construction of rainwater drainage in Barlink
Project Q137839 in Poland

    Statements

    0 references
    2,845,747.37 zloty
    0 references
    682,979.37 Euro
    13 January 2020
    0 references
    3,347,938.11 zloty
    0 references
    803,505.15 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 March 2016
    0 references
    30 July 2018
    0 references
    GMINA BARLINEK
    0 references
    Przedmiotem projektu jest budowa kanalizacji deszczowej w Barlinku na działkach o numerze:obręb 2 Barlinek, działki nr 674, 688/7, 651/9, 660/12 (z podziału działki 660/1), 695/1 oraz obręb 1 Barlinek, działki nr 458,562, 564, 584, 586, 592/3, 592/14, 705,707/1, 709, 710/1, 566.Inwestycja obejmuje swoim zakresem ul. Flukowskiego oraz ul. Zielną na odcinku 828 mb.Inwestycja jest częścią dużego (wcześniej zrealizowanego z POiŚ)projektu w zakresie gospodarki wodno-ściekowej przez PWK "Płonia" określonego w tym projekcie jako zadania nr 2.4.1 (Budowa kanalizacji deszczowej w ul. Flukowskiego) oraz 2.5 (Budowa separatorów na kolektorach deszczowych w ul. Ogrodowej, przebudowa i remont zbiornika retencyjnego wód deszczowych, przebudowa kanalizacji deszczowej w ul. Zielnej w Barlinku, tylko w części dotyczącej ul. Zielnej).Elementy te nie zostały zrealizowane z uwagi na brak formalnych możliwości pozyskania na dane zadania dofinansowania z POiŚ.Obecnie inwestycja jest "przepisywana" na Gminę Barlinek aby móc dokończyć zakres inwestycji przedstawiony w niniejszym wniosku. (Polish)
    0 references
    The subject of the project is the construction of a rainwater drainage system in Barlink on plots numbered: 2 Barlinek, plots no 674, 688/7, 651/9, 660/12 (with division of parcel 660/1), 695/1 and area 1 Barlinek, plots no 458,562, 564, 584, 586, 592/3, 592/14, 705,707/1, 709, 710/1, 1. Flukowskiego and ul. Green on the section of 828 m.The investment is part of a large (previously implemented from the POiŚ) project in the field of water and sewage management by PWK “Płonia” defined in this project as a task no 2.4.1 (Construction of rainwater drainage in ul. Flukowskiego) and 2.5 (Construction of separators on rain collectors in ul. Garden, reconstruction and renovation of the rainwater reservoir, reconstruction of the rainwater sewage system in ul. Herba in Barlink, only in the section concerning ul. These elements were not realised due to the lack of formal possibilities of obtaining funding from the POiŚ for the specific tasks.Currently, the investment is “provisioned” for the Barlinek Municipality in order to be able to complete the scope of the investment presented in this proposal. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’un système d’eau de pluie à BarLink sur des parcelles de numerze:obręb 2 Barlinek, les parcelles no 674, 688/7, 651/9, 660/12 (de la division de la parcelle 660/1), 695/1 et la superficie 1 Barlinek, les parcelles no 458562, 564, 584, 586, 592/3, 592/14, 705707/1, 709, 710/1, 566.L’investissement couvre ul. Flukowskiego et ul. L’investissement s’inscrit dans le cadre d’un vaste projet (précédemment mis en œuvre à partir de l’Opie) dans le domaine de la gestion de l’eau et des eaux usées par PWK «Płonia» défini dans ce projet comme la tâche 2.4.1 (Construction du système d’eau de pluie à ul. Flukowskiego) et 2.5 (Construction de séparateurs sur les collecteurs de pluie en ul. Jardin, reconstruction et réparation du réservoir d’eau de pluie, reconstruction de l’assainissement des eaux pluviales à ul. Herbacée dans BarLink, seulement dans la partie concernant ul. Ces éléments n’ont pas été mis en œuvre en raison de l’absence de possibilités formelles d’obtenir un cofinancement des OP & E pour des tâches données. À l’heure actuelle, l’investissement est «enregistré» pour la municipalité de Barlinek afin de pouvoir compléter la portée de l’investissement présenté dans la présente demande. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.03.03.00-32-A005/16
    0 references