Construction of a photovoltaic installation supplying the Sports and spectacle hall in Płoty (Q137801)

From EU Knowledge Graph
Revision as of 22:06, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet est stationnaire. Localisation du projet: Des clôtures, St. Koszalińska 2a, parcelle no 47, zone d’arpentage à 2 m. Płoty. Le projet sera mis en œuvre dans le domaine d’intervention stratégique (SSW). L’objet du projet est la construction d’une installation photovoltaïque d’une capacité d’env. 39,52 Wp — 137 cellules photovoltaïques d’une puissance d’au moins 290 Wp chacune. L’électricité sous forme de courant continu produite par des...)
Jump to navigation Jump to search
Project Q137801 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic installation supplying the Sports and spectacle hall in Płoty
Project Q137801 in Poland

    Statements

    0 references
    226,755.34 zloty
    0 references
    54,421.28 Euro
    13 January 2020
    0 references
    266,771.0 zloty
    0 references
    64,025.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 March 2017
    0 references
    30 June 2019
    0 references
    GMINA PŁOTY
    0 references
    0 references
    Projekt ma charakter stacjonarny. Lokalizacja projektu: Płoty, ul. Koszalińska 2a, działka nr 47, obręb geodezyjny 2 m. Płoty. Projekt realizowany będzie na obszarze Strategicznej Interwencji (SSW). Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy ok. 39,52 Wp – 137 ogniwa fotowoltaiczne o mocy co najmniej 290 Wp każde. Energia elektryczna w postaci prądu stałego prod. przez ogniwa fotowolt. będzie przekszt. przez falowniki na prąd zmienny o napięciu 400V,a następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy. Przewiduje się budowę inst. fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej. Konstrukcja posadowiona będzie na stopach żelbetowych. Oprócz inst. fotowoltaicznej nie przewiduje się wykonania na działce dodatkowej infrastruktury technicznej. ETAPY REALIZACJI PROJEKTU: 1.Przygotowanie dokumentacji projektu w tym: opracowanie studium wykonalności (III 2017r); 2.Budowa instalacji fotowoltaicznej - prace budowlano-instalacyjne, w tym: Konstrukcja wsporcza pod panele; Moduły i inwertery; Okablowanie; Rozdzielnice i zabezpieczenia elektryczne; Telemechanika i zabezpieczenie; Instalacja uziemiająca i wyrównawcza; termin - V-VI 2019; 4.Nadzór inwestorski, w tym: wynagrodzenie inspektora nadzoru (IV-VII 2019r.) Za realizację proj odp. będzie Gmina Płoty która jednocześnie będzie zarządzała projektem. Do wdrażanie projektu zaangażowany zostanie powołany zespół zarządzający - Kierownik proj. i Specjalista ds. zamówień publicznych i rozliczenia projektu. Obsługa księgowa projektu prowadzona będzie przez Skarbnika Gminy. Okr. realiz. projektu: 02.03.2017 do 30.06.2019 r. Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. Gmina Płoty posiada niezbędne zasoby finansowe, techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
    0 references
    The project is stationary. Location of the project: Fences, hives. Koszalińska 2a, plot no. 47, geodetic area 2 m. Płoty. The project will be implemented in the area of Strategic Intervention (SSW). The object of the project is the construction of a photovoltaic installation with a power of approx. 39.52 Wp – 137 photovoltaic cells with a power of at least 290 Wp each. Electricity in the form of direct current through photovolt cells will be converted by inverters into alternating current with a voltage of 400V and then via a transformer network to the applicant’s power grid. A photovoltaic installation on a free-standing steel structure is envisaged. The structure will be placed on reinforced concrete alloys. Apart from photovoltaic, no additional technical infrastructure is expected to be built on the plot. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: development of a feasibility study (III 2017); 2.Construction of photovoltaic installation – construction and installation works, including: Support structure for the panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; deadline – V-VI 2019; 4.Investor supervision, including: remuneration of the Supervisory Inspector (IV-VII 2019) for the implementation of the project will be the Municipality of Płota which will manage the project simultaneously. A management team – Project Manager and Specialist for Public Procurement and Project Settlement will be involved in the implementation of the project. Accounting services of the project will be carried out by the Municipal Treasurer. Round of implementation of the project: 02.03.2017 by 30.06.2019 Technical and technological solutions enable the project to be carried out according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. The municipality of Płoty has the necessary financial, technical, human resources and experience to guarantee the correct implementation of the project. (English)
    21 October 2020
    0 references
    Le projet est stationnaire. Localisation du projet: Des clôtures, St. Koszalińska 2a, parcelle no 47, zone d’arpentage à 2 m. Płoty. Le projet sera mis en œuvre dans le domaine d’intervention stratégique (SSW). L’objet du projet est la construction d’une installation photovoltaïque d’une capacité d’env. 39,52 Wp — 137 cellules photovoltaïques d’une puissance d’au moins 290 Wp chacune. L’électricité sous forme de courant continu produite par des cellules photovoltaïques sera convertie au moyen d’onduleurs en courant alternatif avec une tension de 400 V, puis à l’aide d’un réseau de transformateurs vers le réseau électrique de la requérante. Il est envisagé de construire un inst. photovoltaïque monté sur une structure en acier autoportante. La construction sera placée sur des pieds en béton armé. Outre le photovoltaïque, aucune infrastructure technique supplémentaire n’est prévue sur la parcelle. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: 1.Préparation de la documentation du projet, y compris: élaboration d’une étude de faisabilité (III 2017); 2.Construction de l’installation photovoltaïque — travaux de construction et d’installation, y compris: Structure de support pour les panneaux; Modules et onduleurs; Câblage; Appareils de commutation et protection électrique; Telemechanika et protection; Mise à la terre et installation compensatoire; date limite — V-VI 2019; 4.Surveillance des investisseurs, y compris: rémunération de l’inspecteur de surveillance (IV-VII 2019) La municipalité de Płoty, qui gérera le projet en même temps, sera chargée de la mise en œuvre du projet. Une équipe de gestion — gestionnaire de projet et spécialiste des marchés publics et de la comptabilité du projet — sera associée à la mise en œuvre du projet. Le service comptable du projet sera assuré par le trésorier de la municipalité. Mise en œuvre du projet: 02.03.2017 au 30.06.2019 Les solutions techniques et technologiques permettent la mise en œuvre du projet selon le calendrier prévu. Une fois l’investissement terminé, l’infrastructure sera prête à être utilisée en pleine fonctionnalité. La municipalité de Płoty dispose des ressources financières, techniques, humaines et de l’expérience nécessaires pour garantir la bonne exécution du projet. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-B182/17
    0 references