Thermomodernisation of Public Basic Schools in Dołuje and Rzędzina in the Municipality of Good (Q137640)

From EU Knowledge Graph
Revision as of 21:30, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet de l’étude est de réaliser des travaux de thermomodernisation des bâtiments des écoles publiques de Dołuje et Rzędziny dans la commune de Dobra.Le champ d’action prévu sera en même temps les étapes matérielles de l’investissement, à savoir: (1) la documentation projektowa:studium,audyty,dokumentacja,opinie ornithologique et chiropterologique;(2)Les travaux de modernisation thermique, y compris:a)Termomodernisation SP en Dołujach:1.drzwi...)
Jump to navigation Jump to search
Project Q137640 in Poland
Language Label Description Also known as
English
Thermomodernisation of Public Basic Schools in Dołuje and Rzędzina in the Municipality of Good
Project Q137640 in Poland

    Statements

    0 references
    590,009.11 zloty
    0 references
    141,602.19 Euro
    13 January 2020
    0 references
    694,128.38 zloty
    0 references
    166,590.81 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 November 2018
    0 references
    31 December 2020
    0 references
    GMINA DOBRA
    0 references
    0 references
    Przedmiotem opracowania jest dokonanie prac termomodernizacyjnych budynków szkół publicznych w Dołujach i Rzędzinach w Gminie Dobra.Zaplanowany zakres prac będzie jednocześnie etapami rzeczowymi inwestycji,a mianowicie:(1)dokumentacja projektowa:studium,audyty,dokumentacja,opinie ornitologiczne i chiropterologiczne;(2)Roboty termomodernizacyjne,w tym:(a)Termomodernizacja SP w Dołujach:1.drzwi nowe (Drzwi do wymiany):zamurowania stolarki:9,44 m2;2.docieplenie-stropodach (GRUPA stropodach),Powierzchnia docieplenia:680m2;3.docieplenie-ściana zewnętrzna (GRUPA ściana zewnętrzna +fundamentowa; Powierzchnia docieplenia:591m2;;(b)Termomodernizacja SP w Rzędzinach:1. Nowa stolarka drzwiowa (GRUPA stolarka 3,400);2. docieplenie - ściana zewnętrzna (GRUPA ściana zewnętrzna),Powierzchnia docieplenia: 306,00m2.W ramach prac wykonane będą także liczniki ciepła z montażem (energii cieplnej) oraz niezbędne (wynikające z Warunków Technicznych) koszty dodatkowe przy dociepleniu elewacji (zadaszenia oraz oświetlenie wejść)dla budynków szkół(3)Inspektor nadzoru;(4)Promocja projektu oraz (5)Koszty pośrednie.Dzięki przeprowadzonym pracom modernizacyjnym oszczędność zapotrzebowania ciepłą wyniesie powyżej 25%.Efektem realizacji będzie bowiem wdrożenie działań związanych z głęboką, kompleksową modernizacją energetyczną obiektów oświatowych, które służą dzisiaj zarówno dzieciom jak i nauczycielom pracującym w obiekcie jako obiekt oświatowo-kulturalny.Szczegóły prac opisano w SW 2.1.1.1 oraz 3.1.3.1 (Polish)
    0 references
    The planned scope of works will be both material stages of the investment, namely:(1)project documentation:study,audyty,documentation,ornithological opinions and chiropterological opinions;(2)thermomodernisationworks,including:(a)Modernisation of SP in Doples:9.44doors-Rounds:,therthermomodernisation,including:(a)Permomodernisation of the SP in Doples:44. Warming area:591m2;;(b)Thermomodernisation of SP in Rzędzin:1. New door carpentry (GRUPA carpentry 3.400);2. warming – outer wall (GRUPA outer wall), Warm area: 306.00 m².The works will also include heat meters with installation (heat energy) and necessary (resulting from the Technical Conditions) additional costs for insulation of facades (closing and lighting of entrances) for school buildings(3)Supervisory inspector;(4)Promotion of the project and (5)Intermediate costs. (English)
    21 October 2020
    0 references
    L’objet de l’étude est de réaliser des travaux de thermomodernisation des bâtiments des écoles publiques de Dołuje et Rzędziny dans la commune de Dobra.Le champ d’action prévu sera en même temps les étapes matérielles de l’investissement, à savoir: (1) la documentation projektowa:studium,audyty,dokumentacja,opinie ornithologique et chiropterologique;(2)Les travaux de modernisation thermique, y compris:a)Termomodernisation SP en Dołujach:1.drzwi nouveau (porte de remplacement):Camping stolarki:9,44 m²;2.stropod heat (GRUPA stropodach),Outdoor Surface (GRUPA extérieur mur + Fondation; Surface docieplenia:591m2; b)Termomodernisation SP dans les cotes:1. Nouvelle menuiserie de porte (GRUPA menuiserie 3,400);2. isolation — mur extérieur (mur extérieur GRUPA), Surface chauffante: 306,00 m².Les travaux comprendront également des compteurs de chaleur avec montage (énergie thermique) et nécessaires (résultant des conditions techniques) sur les coûts supplémentaires lors du réchauffement de la façade (entrées de couverture et d’éclairage) pour les bâtiments scolaires(3)Superviseur;(4)Promotion du projet et (5) coûts indirects. Grâce aux travaux de modernisation, les économies de chaleur seront supérieures à 25 %. La mise en œuvre se traduira par la mise en œuvre d’activités liées à la modernisation énergétique profonde et complète des installations éducatives, qui servent aujourd’hui à la fois les enfants et les enseignants travaillant dans l’établissement en tant qu’objet éducatif et culturel. Les détails des travaux sont décrits dans SW 2.1.1.1 et 3.1.3.1. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.06.00-32-B003/18
    0 references