Basic School of Foz do Neiva, Castelo do Neiva, Viana do Castelo Fibrocimento Removal (Q2899506)

From EU Knowledge Graph
Revision as of 18:39, 5 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2899506 in Portugal
Language Label Description Also known as
English
Basic School of Foz do Neiva, Castelo do Neiva, Viana do Castelo Fibrocimento Removal
Project Q2899506 in Portugal

    Statements

    0 references
    113,603.0 Euro
    0 references
    113,603.0 Euro
    0 references
    100.0 percent
    0 references
    2 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE VIANA DO CASTELO
    0 references
    Q3000045 (Deleted Item)
    0 references

    41°52'49.19"N, 8°31'23.74"W
    0 references
    Remoção de fibrocimento no edifício escolar. Os trabalhos a realizar abarcam a remoção integral da cobertura de amianto no edifício escolar, conforme normas de controlo e qualidade ambiental com a posterior colocação de uma cobertura dotada de isolamento térmico e providas de caleiras. (Portuguese)
    0 references
    Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters. (English)
    8 July 2021
    0 references
    Enlèvement du ciment d’amiante dans le bâtiment de l’école. Les travaux à effectuer comprennent l’enlèvement complet de la couverture d’amiante dans le bâtiment scolaire, conformément aux normes de contrôle et de qualité environnementale, avec la mise en place ultérieure d’un toit avec isolation thermique et équipé de calcaires. (French)
    5 December 2021
    0 references
    Viana do Castelo
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000366
    0 references