Requalification of the Cleaning Station of Telheiras (Q2880632)

From EU Knowledge Graph
Revision as of 23:10, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2880632 in Portugal
Language Label Description Also known as
English
Requalification of the Cleaning Station of Telheiras
Project Q2880632 in Portugal

    Statements

    0 references
    21,980.0 Euro
    0 references
    48,745.0 Euro
    0 references
    45.09 percent
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    MUNICIPIO DE LISBOA
    0 references
    0 references

    38°46'16.79"N, 9°9'49.57"W
    0 references
    As medidas de eficiência energética abrangem intervenções ao nível do isolamento da cobertura, substituição de: vãos envidraçados, iluminação LED, sistema de climatização e instalação de sistema solar fotovoltaico. A redução global do consumo da energia primária e final é de 45,9%, A redução global das emissões de CO2 é igualmente de 45,9%. A classe de eficiência energética do edifício antes de intervenção é o D e após intervenção será o B. (Portuguese)
    0 references
    Energy efficiency measures cover interventions in the isolation of coverage, replacing: Glazed bays, LED lighting, air conditioning system and solar photovoltaic system installation. The overall reduction in primary and final energy consumption is 45.9 %, the overall reduction in CO2 emissions is also 45.9 %. The energy efficiency class of the building before intervention is D and after intervention it will be the B. (English)
    7 July 2021
    0 references
    Les mesures d’efficacité énergétique couvrent les interventions dans l’isolation de la couverture, le remplacement: portées vitrées, éclairage LED, système de climatisation et installation d’un système solaire photovoltaïque. La réduction globale de la consommation d’énergie primaire et finale est de 45,9 % et la réduction globale des émissions de CO2 est également de 45,9 %. La classe d’efficacité énergétique du bâtiment avant l’intervention est D et après intervention sera B. (French)
    5 December 2021
    0 references
    Lisboa, Lumiar
    0 references

    Identifiers

    LISBOA-03-1203-FEDER-000106
    0 references