Requalification and coastal protection of Pocinho, Pico (Q2853811)
Jump to navigation
Jump to search
Project Q2853811 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification and coastal protection of Pocinho, Pico |
Project Q2853811 in Portugal |
Statements
69,199.0 Euro
0 references
81,411.0 Euro
0 references
85.0 percent
0 references
10 October 2019
0 references
31 October 2021
0 references
DIRECÇÃO REGIONAL DOS ASSUNTOS DO MAR
0 references
A presente operação consiste na execução de solução referente ao Prolongamento e Reforço da Proteção Marginal do Pocinho, na Ilha do Pico, através da execução de intervenções em duas zonas, tal como previsto no projeto de execução:ZONA DE INTERVENÇÃO 1 - Remoção do enrocamento existente de modo a permitir a sua recolocação em duas camadas Reposição do enrocamento do manto de proteção, em duas camadas, com enrocamento de 10 a 20 kNs Colmatação (Portuguese)
0 references
The present operation consists of the implementation of a solution related to the extension and reinforcement of the Marginal Protection of Pocinho, on Pico Island, through the execution of interventions in two zones, as foreseen in the implementation project: INTERVENTION ZONE 1 – Removal of the existing screwing in order to allow its relocation in two layers Replacement of the protective mantle, in two layers, with screwing of 10 to 20 kN (English)
6 July 2021
0 references
Cette opération consiste en la mise en œuvre d’une solution relative à l’allongement et au renforcement de la protection marginale de Pocinho, sur l’île de Pico, par la mise en œuvre d’interventions dans deux zones, comme prévu dans le projet execução:ZONA D’INTERVENTION 1 — Élimination du brouillage existant afin de permettre son déplacement en deux couches Remplacement du manteau protecteur, en deux couches, avec un vissage de 10 à 20 kNs (French)
4 December 2021
0 references
Madalena
0 references
Identifiers
ACORES-05-1809-FEDER-000029
0 references