2017-Investment action to improve ABC’s public network of children’s schools Sociedade Cooperativa Galega (Q3231933)

From EU Knowledge Graph
Revision as of 17:37, 5 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3231933 in Spain
Language Label Description Also known as
English
2017-Investment action to improve ABC’s public network of children’s schools Sociedade Cooperativa Galega
Project Q3231933 in Spain

    Statements

    0 references
    16,668.86 Euro
    0 references
    20,836.08 Euro
    0 references
    80.0 percent
    0 references
    30 June 2017
    0 references
    5 December 2017
    0 references
    ABC SCG
    0 references
    0 references
    0 references

    43°29'4.88"N, 8°13'59.38"W
    0 references
    15036
    0 references
    Actuación de inversión para la mejora de la red pública de escuelas infantiles de ABC Socidade Coopertiva Galega; consistente en:_x000D_ a) Obras menores de adecuación y mejora de las infraestructuras: colocación de puertas y ventanas de aluminio; instalación eléctrica - LEDS; acondicionamiento de paredes; y acondicionamiento aula con friso y puertas de madera_x000D_ b) Adquisición, mejora de equipamiento y material didáctico: material de descanso e higiene; y mobiliario y material de aula y exterior_x000D_ c) Dotación de conexión a internet: 3 packs de pizarra Workscreen de 82" y proyector OPTOMA + soporte (Spanish)
    0 references
    Investment action to improve the public network of children's schools of ABC Socidade Cooperativa Galega; consisting of:_x000D_ a) Minor works for adaptation and improvement of infrastructures: placement of aluminum doors and windows; electrical installation - LEDS; conditioning of walls; and classroom conditioning with frieze and wooden doors_x000D_ b) Acquisition, improvement of equipment and didactic material: rest and hygiene material; and furniture and classroom and exterior material_x000D_ c) Internet connection provision: 3 82 "Workscreen slate packs and OPTOMA proyector + support (English)
    0 references
    Investissements pour améliorer le réseau public d’écoles pour enfants de la Société Coopertiva Galega; composé de:_x000D_ a) de petits travaux de mise à niveau et d’amélioration des infrastructures: mise en place de portes et de fenêtres en aluminium; installation électrique — LEDS; montage mural; et conditionnement des salles de classe avec frise et portes en bois_x000D_ b) Acquisition, amélioration de l’équipement et du matériel didactique: les équipements de repos et d’hygiène; et mobilier et équipement de salle de classe et d’extérieur_x000D_c) Connexion Internet: Kits d’ardoise WorkScreen de 3 82" et projecteur OPTOMA + support (French)
    5 December 2021
    0 references
    Ferrol
    0 references

    Identifiers

    204-2018000059
    0 references