Rehabilitation of Plaza Santiago Tejera and endowment of children’s playground (Q3181734)

From EU Knowledge Graph
Revision as of 14:39, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3181734 in Spain
Language Label Description Also known as
English
Rehabilitation of Plaza Santiago Tejera and endowment of children’s playground
Project Q3181734 in Spain

    Statements

    0 references
    572,647.58 Euro
    0 references
    673,703.03 Euro
    0 references
    85.0 percent
    0 references
    21 May 2020
    0 references
    21 March 2022
    0 references
    AYUNTAMIENTO DE LAS PALMAS DE GRAN CANARIA
    0 references

    28°7'43.93"N, 15°26'5.64"W
    0 references
    35016
    0 references
    El proyecto afronta problemas y retos detectados en la elaboración de la Estrategia DUSI (2014-2020), en concreto, aborda directamente los retos de la_x000D_ falta de explotación del potencial turístico del barrio de San Cristóbal, los problemas de accesibilidad y de infraestructuras que apoyen el desarrollo_x000D_ económico y urbano de la zona. _x000D_ _x000D_ El objeto del proyecto consiste en mejorar la calidad, funcionalidad y atractivo de un área de esparcimiento en el barrio de San Cristóbal, así como la dotación de nuevos equipamientos y dotaciones básicas de carácter social y cultural, potenciando los juegos infantiles y los espacios de ocio ligados a su historia marina._x000D_ _x000D_ En concreto, el proyecto contempla las siguientes actividades:_x000D_ - Proyecto de rehabilitación y renovación de la Plaza Santiago Tejera Ossavarry y entorno._x000D_ - Ordenación del espacio peatonal y rodado del entorno, de cara a favorecer usos distintos y compatibles_x000D_ - Dotación de un área infantil y elementos de juego y ocio (barco y juegos ligados a la historia marinera), en zona centro._x000D_ - Tematización de la plaza, de manera participada con la población del barrio de San Cristóbal. Tres ejes iniciales de trabajo, de arraigo en el entorno: piratería, vela latina y tradición marinera._x000D_ _x000D_ Esta operación contribuye a la mejora de los servicios públicos sociales y a la regeneración y revitalización de esta área urbana con problemas de_x000D_ infraestructuras y donde habitan colectivos desfavorecidos. (Spanish)
    0 references
    The project faces problems and challenges identified in the elaboration of the DUSI Strategy (2014-2020), in particular, it directly addresses the challenges of the_x000D_ lack of exploitation of the tourism potential of the San Cristobal neighborhood, the accessibility and infrastructure problems that support the economic and urban development of the area. _x000D_ _x000D_ the object of the project is to improve the quality, functionality and attractiveness of a leisure area in the San Cristobal neighborhood, as well as the provision of new basic social and cultural equipment and facilities, enhancing children’s games and leisure spaces linked to its marine history._x000D_ _x000D_ In particular, the project contemplates the following activities:_x000D_ — Project for the rehabilitation and renovation of Plaza Santiago Tejera Ossavarry and environment._x000D_ — Ordination of the pedestrian space and rolling of the environment, with a view to promoting different and compatible uses_x000D_ — Endowing of a children’s area and elements of play and leisure (ship and games linked to the history of the seafaring), in central zone._x000D_ — Thematisation of the square, in a way that participates with the population of San Cristobal neighborhood. Three initial axes of work, rooted in the environment: piracy, Latin sailing and seafaring tradition._x000D_ _x000D_ This operation contributes to the improvement of public social services and the regeneration and revitalisation of this urban area with problems of_x000D_ infrastructures and where disadvantaged groups live. (English)
    12 October 2021
    0 references
    Le projet est confronté à des problèmes et défis identifiés lors de l’élaboration de la stratégie DUSI (2014-2020), en particulier, il aborde directement les défis du_x000D_ manque d’exploitation du potentiel touristique du quartier de San Cristobal, les problèmes d’accessibilité et d’infrastructure qui soutiennent le développement économique et urbain de la région. _x000D_ _x000D_ l’objet du projet est d’améliorer la qualité, la fonctionnalité et l’attractivité d’un espace de loisirs dans le quartier de San Cristobal, ainsi que la mise à disposition de nouveaux équipements et équipements sociaux et culturels de base, en améliorant les jeux pour enfants et les espaces de loisirs liés à son histoire marine._x000D_ _x000D_En particulier, le projet envisage les activités suivantes:_x000D_ — Projet de réhabilitation et de rénovation de la Plaza Santiago Tejera Ossavarry et de l’environnement._x000D_ — Ordination de l’espace piéton et du roulement de l’environnement, en vue de promouvoir des usages différents et compatibles_x000D_ — Dotation d’un espace pour enfants et éléments de jeux et de loisirs (navire et jeux liés à l’histoire de la mer), dans la zone centrale._x000D_ — Thematisation de la place, de manière à participer avec la population du quartier de San Cristobal. Trois premiers axes de travail, enracinés dans l’environnement: piraterie, navigation latine et tradition maritime._x000D_ _x000D_ Cette opération contribue à l’amélioration des services sociaux publics ainsi qu’à la régénération et à la revitalisation de cette zone urbaine avec des problèmes d’infrastructures_x000D_ et où vivent des groupes défavorisés. (French)
    4 December 2021
    0 references
    Palmas de Gran Canaria, Las
    0 references

    Identifiers

    FDU01IC1225
    0 references