Installation of 30 kW and 40 kW photovoltaic installations (Q131770)
Jump to navigation
Jump to search
Project Q131770 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of 30 kW and 40 kW photovoltaic installations |
Project Q131770 in Poland |
Statements
290,332.36 zloty
0 references
341,567.48 zloty
0 references
85.0 percent
0 references
3 March 2016
0 references
30 November 2017
0 references
PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI "PWIK" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt polega na wykonaniu dwóch instalacji fotowoltaicznych (o mocach 40 kW i 30kW) na potrzeby oczyszczalni ścieków i stacji uzdatniania wody w Ornecie. W ramach projektu wykonane zostaną następujące elementy niezbędnej do prawidłowego funkcjonowania elektrowni fotowoltaicznej: moduły fotowoltaiczne (panele), Falowniki, konstrukcja, zabezpieczenia DC, zabezpieczenia AC, instalacja odgromowa, materiały montażowe, montaż, monitoring (system IT) oraz przewody stało i zmiennoprądowe. Projekt przyczyni się do zwiększenia udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez budowę infrastruktury do wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych. Projekt przyczyni się również do rozwiązania problemów przedsiębiorstwa w zakresie energii. Projekt przyczynia się do zaspokojenia wszystkich zdiagnozowanych problemów wszystkich wskazanych interesariuszy. Wnioskodawca jest przygotowany do rozpoczęcia inwestycji. Posiada dokumentację techniczną, pozwolenie na budowę ani zgłoszenie budowy nie jest wymagane. Posiada również uregulowany stosunek prawny do nieruchomości zabudowanych i niezabudowanych, na których realizowany będzie projekt. Projekt realizowany będzie na działkach: 21/2 i 20/10 w jednostce ewidencyjnej Bogatyńskie (Stacja Uzdatniania Wody, ul Morąska) i 379 i 382/1 w obrębie ewidencyjnym 5 w jednostce ewidencyjnej Orneta. (Polish)
0 references
The project consists of two photovoltaic installations (with a capacity of 40 kW and 30 kW) for the sewage treatment plant and water treatment plant in Ornet. The project will produce the following elements necessary for the proper functioning of the photovoltaic power plant: photovoltaic modules (panels), Inverters, construction, DC security, AC security, lightning installation, assembly materials, installation, monitoring (IT system) and fixed and fluctuating cables. The project will contribute to increasing the share of renewable energy sources in the overall energy balance of the region by building infrastructure for the generation and distribution of renewable energy sources. The project will also help solve the company’s energy problems. The project contributes to addressing all the identified problems of all the stakeholders identified. The applicant is prepared to start the investment. No technical documentation, construction permit or construction declaration is required. It also has a regulated legal relationship to built-up and unbuilt real estate on which the project will be implemented. The project will be implemented on plots of: 21/2 and 20/10 in the registering unit Bogatyńskie (Water Treatment Station, Morąska Street) and 379 and 382/1 within the registering unit 5 in the Ornetian registration unit. (English)
21 October 2020
0 references
Le projet consiste en la construction de deux installations photovoltaïques (40 kW et 30 kW) pour les stations d’épuration des eaux usées et les stations d’épuration des eaux usées à Ornet. Le projet mettra en œuvre les éléments suivants nécessaires au bon fonctionnement de la centrale photovoltaïque: modules photovoltaïques (panneaux), onduleurs, construction, protection CC, sécurité AC, système de protection contre la foudre, matériaux de montage, assemblage, surveillance (système informatique) et câbles à courant fixe et variable. Le projet contribuera à accroître la part des sources d’énergie renouvelables dans le bilan énergétique global de la région en construisant des infrastructures pour la production et la distribution d’énergie à partir de sources renouvelables. Le projet contribuera également à résoudre les problèmes énergétiques de l’entreprise. Le projet contribue à résoudre tous les problèmes diagnostiqués de tous les intervenants identifiés. Le demandeur est prêt à lancer l’investissement. Il dispose d’une documentation technique, d’un permis de construction ou d’une notification de construction. Elle a également une relation juridique réglementée avec les propriétés bâties et non aménagées sur lesquelles le projet sera réalisé. Le projet sera mis en œuvre sur des parcelles: 21/2 et 20/10 dans l’unité cadastrale riche (station de traitement de l’eau, rue Morąska) et 379 et 382/1 dans la zone cadastrale 5 de l’unité cadastrale Orneta. (French)
2 December 2021
0 references
Identifiers
RPWM.04.01.00-28-0110/16
0 references