Thermal modernisation of the building at ul. Żeromski 2B (Q132266)
Jump to navigation
Jump to search
Project Q132266 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building at ul. Żeromski 2B |
Project Q132266 in Poland |
Statements
1,405,499.86 zloty
0 references
1,735,399.26 zloty
0 references
80.99 percent
0 references
12 January 2017
0 references
31 December 2019
0 references
GMINA ELBLĄG
0 references
Projekt przewiduje kompleksową termomodernizację w budynku będącym własnością Gminy Elbląg, przy ul. Żeromskiego 2B. Projekt dotyczy budynku wykorzystywanego głównie na potrzeby w zakresie ochrony zdrowia. Budynek jest wpisany do rejestru zabytków pod numerem 242/92 dnia 24.12.1992 r Projekt można podzielić na dwa etapy tj: 1) Prace przygotowawcze – dokumentacja projektowa, audyt energetyczny, studium wykonalności 2) Prace termomodernizacyjne. Elementem projektu będzie także zatrudnienie inżyniera kontraktu oraz działania promocyjne Przyjęty wariant projektu zakłada przeprowadzenie następujących prac termomodernizacyjnych: 1) Modernizacja instalacji c.o. Modernizacja obejmuje poprawę sprawności przesyłu poprzez montaż izolacji na rurociągach przesyłowych, montaż zaworów termostatycznych z inteligentnymi głowicami . 2) Ocieplenie dachu budynku materiałem termoizolacyjnym. 3) Wymiana stolarki okiennej (wszystkich okien w obiekcie) na nową oszkloną szybą zespoloną podwójną. 4) Ocieplenie ścian zewnętrznych przy gruncie budynku materiałem termoizolacyjnym wraz z warstwą fakturową na siatce. 5) Wymiana stolarki drzwiowej ( wszystkie drzwi zewnętrzne) na nową oszkloną szybą zespoloną podwójną. 6) Ocieplenie wszystkich ścian zewnętrznych budynku przy użyciu materiału termoizolacyjnego: Natrysk poliuretanowy o grubości minimum: 3 cm. Ocieplenie ścian dotyczy wszystkich ścian zewnętrznych kondygnacji naziemnych. W ociepleniu uwzględniono modernizację cokołu. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Poddziałania 4.3.1 ponieważ w wyniku jego realizacji nastąpi zwiększanie efektywności energetycznej budynku, co jest zgodne z celami w/w działania. Ponadto projekt jest zgodny z oczekiwanymi efektami wsparcia dla Osi nr 4 tj: 1) Obniżeniem zużycia energii pierwotnej w budynkach publicznych i zapotrzebowania na ciepło w zabudowie mieszkaniowej. 2) Spadkiem emisji gazów cieplarnianych do atmosfery (Polish)
0 references
The project provides for a comprehensive thermal modernisation in a building owned by the Municipality of Elbląg, on ul. Zeromski 2B. The project concerns a building used mainly for health care purposes. The building is entered in the Register of Monuments on 242/92 on 24.12.1992 The project can be divided into two stages, i.e.: 1) Preparatory work – design documentation, energy audit, feasibility study 2) Thermomodernisation work. The project will also include hiring a contract engineer and promotional activities The chosen project option assumes the following thermo-modernisation works: 1) Modernisation of central heating installations. Modernisation includes improving transmission efficiency through installation of insulation on transmission pipelines, installation of thermostatic valves with intelligent heads. 2) Insulating the roof of the building with insulation material. 3) Replacement of window joinery (all windows in the building) with a new glazed double glazed glass. 4) Warming of the outer walls next to the ground of the building with insulating material together with an invoice layer on the grid. 5) Replacement of the door carpentry (all external doors) with a new glazed double glazed glass. 6) Warming of all exterior walls of the building using insulation material: Polyurethane spray with a minimum thickness: It’s 3 centimeters. Wall warming applies to all external walls of ground floors. The warming takes into account the modernisation of the pedestal. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 4.3.1 as the result of its implementation will increase the energy efficiency of the building, which is consistent with the objectives of the above-mentioned action. In addition, the project complies with the expected support effects for Axis No 4, i.e.: 1) Reducing primary energy consumption in public buildings and the need for heat in housing. 2) Falling greenhouse gas emissions into the atmosphere (English)
21 October 2020
0 references
Le projet prévoit une thermomodernisation complexe dans le bâtiment appartenant à la municipalité d’Elbląg, à ul. ▲eromski 2B. Le projet concerne un bâtiment principalement utilisé à des fins de santé. Le bâtiment est inscrit au registre des monuments sous le numéro 242/92 le 24.12.1992 Le projet peut être divisé en deux étapes, à savoir: 1) Travaux préparatoires — documentation du projet, audit énergétique, étude de faisabilité 2) travaux de thermomodernisation. Le projet comprendra également l’emploi d’un ingénieur contractuel et des activités promotionnelles. La variante acceptée du projet consiste à réaliser les travaux de thermomodernisation suivants: 1) La modernisation des installations de chauffage central comprend l’amélioration de l’efficacité de la transmission en installant une isolation sur les canalisations de transmission, en assemblant des vannes thermostatiques avec des têtes intelligentes. 2) L’isolation du toit du bâtiment avec un matériau d’isolation thermique. 3) Remplacement de la menuiserie des fenêtres (toutes les fenêtres de l’installation) par un nouveau verre double vitrage. 4) Réchauffement des murs extérieurs au sol du bâtiment avec un matériau d’isolation thermique ainsi que la couche de texture sur la maille. 5) Remplacement de la menuiserie de porte (toutes les portes extérieures) par un nouveau verre double vitrage. 6) Réchauffer tous les murs extérieurs du bâtiment à l’aide d’un matériau d’isolation thermique: Pulvérisation de polyuréthane d’épaisseur minimale: Trois centimètres. L’isolation des murs s’applique à tous les murs extérieurs du rez-de-chaussée. La modernisation du socle a été incluse dans le réchauffement. Le projet est conforme aux hypothèses énoncées dans le ROP WiM SzOOP pour la sous-mesure 4.3.1, car sa mise en œuvre entraînera une augmentation de l’efficacité énergétique du bâtiment, ce qui est conforme aux objectifs de la mesure susmentionnée. En outre, le projet est conforme aux effets de soutien attendus pour l’axe 4, c’est-à-dire: 1) réduction de la consommation d’énergie primaire dans les bâtiments publics et de la demande de chaleur dans les bâtiments résidentiels. 2) Une diminution des émissions de gaz à effet de serre dans l’atmosphère (French)
2 December 2021
0 references
Identifiers
RPWM.04.03.01-28-0027/17
0 references