“The use of renewable energy sources in a comprehensive modernisation of the heating system for the buildings of the Municipal Cultural Centre and Fire Service in Bishops” (Q131719)

From EU Knowledge Graph
Revision as of 19:25, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif de l’investissement est la reconstruction du système de chauffage dans le bâtiment GOK et le GRT à Biskupiec sur le terrain no 621/2 dans le bâtiment, à partir d’une pompe à chaleur saumâtre-eau, qui puise la chaleur du sol par un échangeur de chaleur vertical. Installation du système interne sur les itinéraires actuels. Un système de chauffage a été conçu: un système de fermeture à deux tuyaux à base d’eau. Méthode de chauffage à l’a...)
Jump to navigation Jump to search
Project Q131719 in Poland
Language Label Description Also known as
English
“The use of renewable energy sources in a comprehensive modernisation of the heating system for the buildings of the Municipal Cultural Centre and Fire Service in Bishops”
Project Q131719 in Poland

    Statements

    0 references
    1,142,642.58 zloty
    0 references
    274,234.22 Euro
    13 January 2020
    0 references
    1,344,285.39 zloty
    0 references
    322,628.49 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 October 2015
    0 references
    31 October 2017
    0 references
    GMINA BISKUPIEC
    0 references
    0 references

    53°30'6.1"N, 19°20'52.8"E
    0 references
    Przedmiotem inwestycji jest przebudowa instalacji grzewczej w budynku GOK i OSP w Biskupcu na działce nr 621/2 w budynku, oparty na pompie ciepła typu solanka- woda, pobierającej ciepło z ziemi poprzez pionowy wymiennik ciepła. Wewnętrzną instalację układu po obecnych trasach. Zaprojektowano instalację grzewczą: wodną dwururową sytemu zamkniętego. Sposób ogrzewania pomieszczeń poprzez stalowe grzejniki płytowe: - aparat grzewczy dla budynku straży pożarnej- garaż moc 5,0 kW 2 szt. - aparat grzewczy dla budynku GOK- sala widowiskowa moc 5,0 2 szt. Zakres niezbędnych czynności: Instalacja systemu odnawialnych źródeł energii: • Wykonanie dolnego źródła energii • Wykonanie obiegu pierwotnego • Wykonanie wytwornicy ciepła • Wykonanie obiegu wtórnego • Wykonanie instalacji technologicznej pompy ciepła Przebudowa instalacji grzewczej: INSTALACJA C.O- BUDYNEK GOK i OSP • Wykonanie instalacji c.o. (grzejniki) • Instalacja aparatów ogrzewczo- wentylacyjnych • Demontaż instalacji c.o. • Malowanie i prace wykończeniowe • Docieplenie posadzek • Roboty budowlane towarzyszące Projekt wpisuje się w SzOOP RPO WiM 2014-2020- Oś priorytetowa Efektywność energetyczna gdyż odpowiada na wyzwania europejskiej polityki energetycznej i koncentruje się na działaniach zmierzających do poprawy bezpieczeństwa energetycznego województwa warmińsko-mazurskiego poprzez wzrost mocy wytwórczych w oparciu o źródła odnawialne i możliwości odbioru wytworzonej energii, budownictwie i systemach transportowych w miastach prowadzącej do redukcji emisji. Oczekiwane efekty wsparcia: 1. Wzrost udziału energii elektrycznej produkowanej ze źródeł odnawialnych w produkcji energii elektrycznej ogółem. 2. Obniżenie zużycia energii pierwotnej w budynkach publicznych i zapotrzebowania na ciepło w zabudowie mieszkaniowej. 3. Większa skala skojarzonego wytwarzania energii cieplnej. 4. Wzrost sprawności systemów komunikacyjnych w miastach. 5. Spadek emisji gazów ciepla (Polish)
    0 references
    The subject of the investment is the reconstruction of the heating system in the GOK and OSP building in Biskupec on plot no.621/2 in the building, based on a heat pump of the brine-water type, which draws heat from the ground through a vertical heat exchanger. Internal installation of the system on current routes. A heating system has been designed: a water two-tube system closed. Method of space heating through steel plate radiators: — heating apparatus for fire brigade building – garage power 5,0 kW 2 pcs. — heating apparatus for the GOK building – spectacle room power 5,0 2 pcs. Scope of necessary activities: Installation of a renewable energy system: • The production of the lower energy source • The production of the primary circuit • The manufacture of the heat generator • The production of a secondary circuit • Manufacture of a heat pump technology installation Reconstruction of the heating system: Installation of C.O-BUDYNEK GOK and OSP • Manufacturing of central heating installations (heaters) • Installation of heating and ventilation devices • Dismantling of central heating installations • Painting and finishing works • Installation of floors • Construction works accompanying works The project fits into the energy efficiency of renewable energy sources of the RPO WiM 2014-2020- Priority axis Energy efficiency as it responds to the challenges of European energy policy and concentrates on energy efficiency improvement of energy efficiency in the energy efficiency of the energy policy and focuses on the improvement of energy efficiency. Expected effects of support: 1. Increase in the share of electricity produced from renewable sources in total electricity production. 2. Reduce primary energy consumption in public buildings and the demand for heat in housing. 3. A larger scale of combined heat generation. 4. Increasing the efficiency of communication systems in cities. 5. Reduction of heat gas emissions (English)
    21 October 2020
    0 references
    L’objectif de l’investissement est la reconstruction du système de chauffage dans le bâtiment GOK et le GRT à Biskupiec sur le terrain no 621/2 dans le bâtiment, à partir d’une pompe à chaleur saumâtre-eau, qui puise la chaleur du sol par un échangeur de chaleur vertical. Installation du système interne sur les itinéraires actuels. Un système de chauffage a été conçu: un système de fermeture à deux tuyaux à base d’eau. Méthode de chauffage à l’aide de radiateurs en tôle d’acier: — appareils de chauffage pour le bâtiment des pompiers — puissance de garage 5,0 kW 2 pièces. — appareil de chauffage pour le bâtiment GOK — performance hall puissance 5,0 2 pièces. Portée des activités nécessaires: Installation d’un système d’énergie renouvelable: • Exécution de la source d’énergie inférieure • Faire le circuit primaire • Construction du générateur de chaleur • Exécution du circuit secondaire • Mise en œuvre de l’installation technologique de la pompe à chaleur Reconstruction du système de chauffage: Installation C.O-budynek GOK et OSP • Exécution d’installations de chauffage central (chauffeurs) • Installation d’appareils de chauffage et de ventilation • Démontage des installations de chauffage central • Peinture et finition • Réchauffement du sol • Réchauffement des bâtiments accompagnant le projet s’insère dans le SzOOP ROP WiM 2014-2020 — axe prioritaire en matière d’efficacité énergétique, car il répond aux défis de la politique énergétique européenne et met l’accent sur des actions visant à améliorer la sécurité énergétique de la région de Warmińsko-Mazurskie en augmentant la capacité de production basée sur les sources renouvelables et les possibilités de réception d’énergie produite, de construction et de transport. Résultats escomptés du soutien: 1. Augmentation de la part de l’électricité produite à partir de sources renouvelables dans la production totale d’électricité. 2. Réduire la consommation d’énergie primaire dans les bâtiments publics et la demande de chaleur dans les logements. 3. Une plus grande échelle de production combinée de chaleur. 4. Accroître l’efficacité des systèmes de communication dans les villes. 5. Diminution des émissions de gaz thermiques (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0035/16
    0 references