Phase II of the revaloration of the historic park in Jeglawki, taking into account the protection of biodiversity sites (Q132519)
Jump to navigation
Jump to search
Project Q132519 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Phase II of the revaloration of the historic park in Jeglawki, taking into account the protection of biodiversity sites |
Project Q132519 in Poland |
Statements
3,403,709.04 zloty
0 references
4,004,363.58 zloty
0 references
85.0 percent
0 references
5 December 2018
0 references
29 May 2020
0 references
FUNDACJA EKOPARK TOMASZÓWKA
0 references
Miejsce realizacji: zabytkowy park w Jegławkach (15,02ha), działki nr 11/47, 11/48, 11/49 ,11/50, obręb 05 Jegławki, Gm. Srokowo. Celem projektu jest II etap rewaloryzacji parku w tym miejscowego stawu, budowa ogrodzenia, wzbogacenie występujących na terenie parku siedlisk i gatunków roślin. Planowane roboty: 1. Prace - bioróżnorodność • GOSPODARKA ISTNIEJĄCĄ SZATĄ ROŚLINNĄ –wykaszanie chwastów i samosiewów, sprzątanie terenu(12200 m2) • PRZYGOTOWANIE TERENU I UPRAWA GLEBY (12200 m2) • WYKONANIE NOWYCH NASADZEN ROŚLIN: DRZEWA LISCIASTE (10 szt.); Drzewa i krzewy iglaste (10szt.); KRZEWY LISCIASTE (950 szt.); KRZEWY IGLASTE (110szt.); PNĄCZA (1500szt.); BYLINY i PAPROCIE (660szt.); ROŚLIN ZIELNE - (1200m2) - Kolekcja pokazowa roślin siedliska grądu sub - 3168szt roślin; 10 000 szt. bylin i paproci (5000m2) • ROZŚCIEŁANIE KORY (6000m2) • Zestaw do automatycznego nawadniania • WYKONANIE PRAC ZWIĄZANYCH Z RENOWACJĄ STAWU- oczyszczenie stawu z wywozem odpadów i nasadzenia roślin wodnych (260szt.) 2. Rewaloryzacja stawu Palisada z kołków i słupków (375,40m), Narzut kamienny (639 m2), Bentomat (167,7 m2), Bruk na skarpach 363,35 m2, Bruk grobla (271,6 m2), Podwodny narzut (2szt), Ogrodzenie drewniane (168 m2); Nawierzchnie z płyt żelbetowych pełnych (300m2) i inne 3. Infrastruktura parku • Ogrodzenie frontowe ,cokoły betonowe, nakrywy kamienne na cokoły (100,26m), słupy (56szt.), Ogrodzenie met. (137,32m), wrota (2kpl) i inne • Ogrodzenie parku – ogrodzenie z siatki (1731 mb), wrota z furtkami (3kpl.) i inne • System monitoringu (kamery 8szt.) Pełna lista prac w Studium (pkt.2.2). Etapy realizacji Projektu: -przygotowawczy- dokument. tech. i konkursowa -wyboru wykonawcy inwestycji - konkurencyjność -realizacja inwestycji- wykonanie i odbiór robót -końcowe rozliczenie proj. Projekt wpisuje się w założenia SzOOP RPO poprzez Cel szczegółowy: Lepsze mechanizmy ochrony bioróżnorodności w regionie - zachowując, zabezpieczając i zwiększając bioróżnorodność. (Polish)
0 references
Place of implementation: historic park in Jegławki (15,02 ha), plots no. 11/47, 11/48, 11/49,11/50, area 05 Jegławki, Gm. Srokowo. The aim of the project is the second phase of the regeneration of the park including the local pond, the construction of a fence and enrichment of habitats and plant species found in the park. Planned works: 1. Works – biodiversity • Existing plant garment – weeds and self-seeding, land cleaning (12200 m²) • THERE AND GLEBY PROTECTION (12200 m²) • Implementation of new NASADEN ROSION: Leaf trees (10 pcs); Coniferous trees and shrubs (10 pieces); Leaf shrubs (950 pcs); IGLASTE bushes (110 pieces); Vines (1500 pieces); Perennials and ferns (660 pieces); Herbaceous plants – (1200 m²) – Show collection of plants habitat sub – 3168pcs of plants; 10 000 units. perennials and ferns (5000 m²) • Set of bark (6000 m²) • Automatic irrigation kit • Implementation of joints associated with the restoration of the pond with the removal of waste and planting of water plants (260 pieces) 2. Revaluation of the pond with pegs and posts (375.40 m), Stone bed (639 m²), Bentomat (167.7 m²), Bruck on grading 363.35 m², pavement of the weed (271.6 m²), underwater overhead (2 pieces), Wooden fence (168 m²); Surfaces with solid reinforced concrete plates (300 m²) and other 3. Infrastructure of the park • Front fences, concrete wheels, stone covers for pedestals (100.26 m), columns (56 pieces), metre fence. 137.32 m, gate (2 kpl) and others • Park fence – grid fence (1731 mb), gateway with gates (3 kpl.) and others • Monitoring system (camera 8pc.) Full list of works in Studium (point 2.2). Stages of Project Implementation: —preparatory- tech. and competition document – selection of the investment contractor – competitiveness – implementation of investments – execution and receipt of works – final project settlement. The project fits into the assumptions of the Shoop RPO through the specific objective: Better mechanisms for protecting biodiversity in the region – preserving, safeguarding and increasing biodiversity. (English)
21 October 2020
0 references
Lieu de mise en œuvre: parc historique à Jegławek (15,02 ha), terrain no 11/47, 11/48, 11/49,11/50, zone 05 Jegławki, Gm. Srokowo. L’objectif du projet est la deuxième phase de revitalisation du parc, y compris l’étang local, la construction d’une clôture, l’enrichissement des habitats et des espèces végétales présentes dans le parc. Travaux prévus: 1. Travaux — Biodiversité • ÉCONOMIQUE — Localisation existante — désherbage et auto-ensemencement, nettoyage du site (12 200 m²) • THERENECTING AND gleba Uave (12 200 m²) • DÉPENDITURE DE NOUVELLES RÉSULTATS: Arbres feuillus (10 pièces); Conifères et buissons (10 pièces); Arbustes à feuilles (950 pièces); Arbustes de conifères (110pcs); Vigne (1500 unités); Vivaces et fougères (660 pièces); Plantes vertes — (1 200 m²) — Montre collection de plantes de l’habitat du sous-jeu — 3168pcs de plantes; 10 000 vivaces et fougères (5 000 m²) • Doublure d’écorce (6 000 m²) • Kit d’irrigation automatique • TRAVAIL CONCERNÉ AVEC ÉTUDES Rénovation- Nettoyage de l’étang avec l’exportation de déchets et la plantation d’installations d’eau (260pcs) 2. Revalorisation de l’étang de Palisada avec chevilles et poteaux (375,40 m), lit en pierre (639 m²), Bentomat (167,7 m²), Bruk sur les pentes 363,35 m², digue de Bruk (271,6 m²), couvre-lit sous-marin (2pcs), clôture en bois (168 m²); Surfaces des plaques de béton armé massif (300 m²) et autres 3. Infrastructure du parc • Clôture avant, piédestaux en béton, couvercles en pierre pour les socles (100,26 m), poteaux (56pcs), clôture de meth. (137,32 m), portail (2kpl) et autres • Clôture de parc — clôture en maille (1 731 m), portail avec portails (3kpl.) et autres • Système de surveillance (caméras 8pcs) Liste complète des œuvres du Studio (point.2.2). Étapes du projet: —document préparatoire. tech. et concurrence -élection du contractant de l’investissement — compétitivité — mise en œuvre de l’investissement- exécution et acceptation des travaux — règlement final du projet. Le projet est conforme aux hypothèses du ROP SzOOP à travers l’objectif spécifique: De meilleurs mécanismes de protection de la biodiversité dans la région — préservation, sauvegarde et renforcement de la biodiversité. (French)
2 December 2021
0 references
Identifiers
RPWM.05.03.00-28-0011/19
0 references