Armament of investment areas in the area of the 650th anniversary settlement in Bartoszyce – stage I (Q130229)

From EU Knowledge Graph
Revision as of 11:39, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet est la première étape de la réalisation de la propriété de 650 ans à Bartoszyce et consiste à créer des infrastructures routières avec éclairage public pour les services de transport ainsi que des armements des zones (exécution de l’approvisionnement en eau, assainissement, drainage des pluies) désignées dans le MPZP applicable de la ville de Bartoszyce (Résolution du conseil municipal de Bartoszyce no XLV/262/2006 du 30 mars 2006). Le...)
Jump to navigation Jump to search
Project Q130229 in Poland
Language Label Description Also known as
English
Armament of investment areas in the area of the 650th anniversary settlement in Bartoszyce – stage I
Project Q130229 in Poland

    Statements

    0 references
    1,325,077.51 zloty
    0 references
    318,018.60 Euro
    13 January 2020
    0 references
    1,636,100.15 zloty
    0 references
    392,664.04 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    15 March 2017
    0 references
    30 September 2018
    0 references
    GMINA MIEJSKA BARTOSZYCE
    0 references
    0 references
    Przedsięwzięcie stanowi I etap realizacyjny osiedla 650-lecia w Bartoszycach i polega na stworzeniu infrastruktury drogowej wraz z oświetleniem ulicznym do obsługi komunikacyjnej wraz z uzbrojeniem terenów (wykonanie wodociągu, kanalizacji sanitarnej, kanalizacji deszczowej) oznaczonych w obowiązującym MPZP miasta Bartoszyce (Uchwała Rady Miasta Bartoszyce Nr XLV/262/2006 z dnia 30 marca 2006 r.). Zakres przedmiotowego projektu dotyczy obszaru oznaczonego w powyższym MPZP jako 19 UHR Teren projektowanych usług handlowych i rzemieślniczych. Obsługa komunikacyjna tego terenu określona została wyłącznie z projektowanej ulicy wewnętrznej. Szczegółowy opis projektu znajduje się w Załączniku nr 5 do wniosku w wyciągu z dokumentacji technicznej, natomiast część graficzna w wypisie i wyrysie MPZP. Projekt będzie wdrażany przez Urząd Miasta Bartoszyce w zakresie kompetencji Wydziału Techniczno-Inwestycyjnego. Do najważniejszych etapów realizacji projektu należy zaliczyć: - wyłonienie wykonawcy w procedurze Prawa zamówień publicznych (założono podpisanie umowy z wykonawcą w I kw. 2017), - właściwą realizację rzeczową i finansową inwestycji w terminie od I kw. 2017 do III kw. 2018. Projekt wpisuje się w założenia określone w SzOOP RPO WiM realizując cel Poddziałania 1.3.4 Tereny inwestycyjne określony jako Lepsze warunki do rozwoju MŚP. Zgodność z typem projektu określono w pkt. 3.7 wniosku. (Polish)
    0 references
    The project constitutes the first stage of implementation of the housing estate of 650 years in Bartoszyce and consists of the creation of road infrastructure, together with street lighting for communication services, along with the armament of the areas (construction of water supply, sanitary sewage system, rainwater drainage) marked in the current MPZP of Bartoszyce City Council (BARTOszyce City Council Resolution No. XLV/262/2006 of 30 March 2006). The scope of the project relates to the area identified in the above-mentioned MPZP as 19 UHR Areas of the proposed commercial and craft services. The communication services of this area were determined only from the designed internal street. A detailed description of the project can be found in Annex 5 to the application in the extract from the technical documentation, while the graphic part in the extract and engraving of the MPZP. The project will be implemented by the Bartoszyce City Hall in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — selection of an economic operator in the Public Procurement Law procedure (a contract was signed with the contractor in the first quarter. 2017), – proper implementation in kind and financial of the investment within the period from quarter I. 2017 to III sq. 2018. The project fits into the assumptions set out in the SzOOP RPO WiM fulfilling the objective of sub-measure 1.3.4 Investment areas defined as better conditions for the development of SMEs. Conformity with the type of project is specified in point. 3.7 of the proposal. (English)
    21 October 2020
    0 references
    Le projet est la première étape de la réalisation de la propriété de 650 ans à Bartoszyce et consiste à créer des infrastructures routières avec éclairage public pour les services de transport ainsi que des armements des zones (exécution de l’approvisionnement en eau, assainissement, drainage des pluies) désignées dans le MPZP applicable de la ville de Bartoszyce (Résolution du conseil municipal de Bartoszyce no XLV/262/2006 du 30 mars 2006). Le champ d’application du projet concerne la zone identifiée dans le PMZP susmentionné comme étant 19 zones UHR de services commerciaux et d’artisanat proposés. Le service de communication de cette zone a été déterminé exclusivement à partir de la rue intérieure. Une description détaillée du projet figure à l’annexe 5 de la requête dans l’extrait de la documentation technique, tandis que la partie graphique de l’extrait et du dessin du MPZP. Le projet sera mis en œuvre par le conseil municipal de Bartoszyce dans le domaine de compétence du département technique et d’investissement. Les étapes les plus importantes de la mise en œuvre du projet sont les suivantes: — sélection du contractant dans le cadre de la procédure de passation de marché public (il a été présumé que le contrat avec le contractant a été signé au premier trimestre). 2017), — mise en œuvre matérielle et financière adéquate de l’investissement dans le délai fixé au premier trimestre 2017 au troisième trimestre 2018. Le projet est conforme aux hypothèses énoncées dans le ROP WiM SzOOP en vue d’atteindre l’objectif de la sous-mesure 1.3.4 Domaines d’investissement définis comme de meilleures conditions pour le développement des PME. La conformité avec le type de conception est spécifiée au point. 3.7 de la proposition. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.01.03.04-28-0012/16
    0 references