Construction of a photovoltaic power plant with a capacity of up to 1 MW to ensure energy independence at the “HEKO” Plant for Plastics and Various Products (Q127503)

From EU Knowledge Graph
Revision as of 09:17, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est de garantir l’indépendance énergétique des bâtiments industriels de la requérante situés à Czermno. La requérante y exploite seule une usine de traitement des matières plastiques, qui nécessite de grandes quantités d’électricité pour le bon fonctionnement des machines, de l’équipement et de l’éclairage des halls. La mise en œuvre de ce projet conduira à une situation dans laquelle toute l’énergie proviendra d’une source...)
Jump to navigation Jump to search
Project Q127503 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic power plant with a capacity of up to 1 MW to ensure energy independence at the “HEKO” Plant for Plastics and Various Products
Project Q127503 in Poland

    Statements

    0 references
    1,838,051.34 zloty
    0 references
    441,132.32 Euro
    13 January 2020
    0 references
    2,625,787.63 zloty
    0 references
    630,189.03 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 March 2018
    0 references
    31 October 2019
    0 references
    HENRYK KONIECZNY ZAKŁAD TWORZYW SZTUCZNYCH I WYROBÓW RÓŻNYCH "HEKO"
    0 references
    0 references
    Celem projektu jest zapewnienie niezależności energetycznej budynkom przemysłowym Wnioskodawcy położonym w miejscowości Czermno. Wnioskodawca prowadzi tam samodzielnie zakład przetwórstwa tworzyw sztucznych, który wymaga dużych ilości energii elektrycznej, dla prawidłowego działania maszyn, urządzeń oraz oświetlenia hal. Realizacja niniejszego projektu ma doprowadzić do sytuacji, gdzie całość energii pochodziła będzie z odnawialnego źródła energii – energii słonecznej. Dodatkowo zakłada się sprzedaż nadwyżek produkowanej energii do sieci. Zadania jakie realizowane będą w projekcie obejmują zakup środków trwałych oraz prace montażowe - elektrownia fotowoltaiczna do mocy do 1 MW wraz z przebudową wewnętrznej instalacji elektroenergetycznej celem połączenia systemu z budynkami, a także przyłącze do sieci. Projekt realizuje koncepcję projektowania uniwersalnego – system wyposażony będzie m.in. użyteczne i łatwe w obsłudze oprogramowanie sterujące. Projekt realizowany będzie w miejscowości Czermno - nr działek: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (obręb 0002 Czermno). Projekt zgodny jest z założeniami Działania 3.1. RPO Woj. Świętokrzyskiego, bowiem obejmuje swoim zakresem budowę infrastruktury służącej do wytwarzania energii elektrycznej, pochodzącej ze źródeł odnawialnych - energii słonecznej. Projekt dotyczy wyłącznie zakupu nowych, nieużywanych elementów. Projekt pozwoli zrealizować następujące wskaźniki: a) Produktu: Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE - 1 szt. Liczba przedsiębiorstw otrzymujących wsparcie - 1 szt. b) Rezultatu: Produkcja energii elektrycznej z nowo wybudowanych inst. wykorzystujących OZE - 757 MWhe/rok Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych - 0,85 MWe Wzrost zatrudnienia we wspieranych przedsiębiorstwach - 4,5 EPC J.w. - mężczyźni 3,0 - EPC J.w. - kobiety - 1,5 EPC Szacowany roczny spadek emisji gazów cieplarnianych - 605,53 t/rok (Polish)
    0 references
    The aim of the project is to ensure energy independence for the applicant’s industrial buildings located in Czermno. The applicant operates a plastic processing plant on its own, which requires large amounts of electricity, for the proper operation of machinery, equipment and hall lighting. The implementation of this project is intended to lead to a situation where all energy will come from a renewable energy source – solar energy. In addition, it is assumed to sell surplus produced energy to the grid. The tasks that will be carried out in the project include the purchase of fixed assets and assembly works – a photovoltaic power plant up to a capacity of up to 1 MW together with the reconstruction of the internal power installation in order to connect the system with buildings, as well as the connection to the network. The project implements the universal design concept – the system will be equipped with, among others, useful and easy to use control software. The project will be implemented in Czermno – plot no.: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (Bermno 0002). The project is in line with the assumptions of Action 3.1. RPO War. Świętokrzyskie, as it covers the construction of infrastructure for the generation of electricity from renewable sources – solar energy. The project only concerns the purchase of new, unused elements. The project will implement the following indicators: the product: Number of built units of electricity generation from RES – 1 pcs. Number of enterprises receiving support – 1 units (b) Results: Production of electricity from newly built renewable energy sources – 757 MWhe/year Additional renewable electricity generation capacity – 0.85 MWe Job growth in supported enterprises – 4.5 EPC J.w. – men 3.0 – EPC J.w. – women – 1.5 FTE Estimated annual reduction in greenhouse gas emissions – 605.53 t/year (English)
    21 October 2020
    0 references
    L’objectif du projet est de garantir l’indépendance énergétique des bâtiments industriels de la requérante situés à Czermno. La requérante y exploite seule une usine de traitement des matières plastiques, qui nécessite de grandes quantités d’électricité pour le bon fonctionnement des machines, de l’équipement et de l’éclairage des halls. La mise en œuvre de ce projet conduira à une situation dans laquelle toute l’énergie proviendra d’une source d’énergie renouvelable — l’énergie solaire. En outre, on suppose que l’électricité excédentaire est vendue au réseau. Les tâches à réaliser dans le cadre du projet comprennent l’achat d’immobilisations et de travaux d’assemblage — une centrale photovoltaïque d’une capacité maximale de 1 MW, ainsi que la conversion du réseau électrique interne pour relier le réseau aux bâtiments, ainsi que le raccordement au réseau. Le projet met en œuvre le concept de conception universelle — le système sera équipé, entre autres, d’un logiciel de contrôle utile et facile à utiliser. Le projet sera mis en œuvre à Czermno — numéro de la parcelle: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (tous deux 0002 Chermno). Le projet est conforme aux objectifs de l’action 3.1. La guerre du ROP. Świętokrzyskie, parce qu’elle couvre la construction d’infrastructures pour la production d’électricité à partir de sources renouvelables — l’énergie solaire. Le projet ne concerne que l’achat de nouveaux articles inutilisés. Le projet mettra en œuvre les indicateurs suivants: a) Produit: Nombre d’unités de production d’électricité SER construites — 1 pcs. Nombre d’entreprises soutenues — 1 b) Résultat: Production d’électricité à partir de SER nouvellement construits utilisant des SER — 757 MWhe/an Capacité supplémentaire de production d’électricité renouvelable — 0,85 MWe Croissance de l’emploi dans les entreprises bénéficiant d’un soutien — 4,5 ETP — hommes 3,0 — ETP JU — femmes — 1,5 ETP Réduction annuelle estimée des émissions de gaz à effet de serre — 605,53 t/an (French)
    2 December 2021
    0 references

    Identifiers

    RPSW.03.01.00-26-0049/17
    0 references