Improving the energy efficiency of the public utility building – ZBGKiM headquarters in Rudziniec. (Q123838)

From EU Knowledge Graph
Revision as of 08:05, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend une thermomodernisation complète d’un bâtiment composé de 2 segments à ul. Forêt 4 à Rudziniec. Le bâtiment a été repris par la municipalité pour le nouveau siège de ZBGKiM, mais nécessite une modernisation thermique complète en raison du non-respect des exigences en matière d’isolation des murs extérieurs, du toit, des portes et des fenêtres. Le projet couvre les principaux types de travaux de construction suivants: — amélior...)
Jump to navigation Jump to search
Project Q123838 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of the public utility building – ZBGKiM headquarters in Rudziniec.
Project Q123838 in Poland

    Statements

    0 references
    380,792.57 zloty
    0 references
    91,390.22 Euro
    13 January 2020
    0 references
    447,991.25 zloty
    0 references
    107,517.9 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 December 2016
    0 references
    16 May 2017
    0 references
    GMINA RUDZINIEC
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references
    Projekt obejmuje kompleksową termomodernizację budynku składającego się z 2 segmentów przy ul. Leśnej 4 w Rudzińcu. Budynek został przejęty przez gminę z przeznaczeniem na nową siedzibę ZBGKiM, wymaga jednak kompleksowej termomodernizacji z uwagi na niespełnianie wymogów izolacyjności ścian zewnętrznych, dachu, drzwi i okien. Projekt obejmuje następujące główne rodzaje robót budowlanych: - poprawę izolacyjności przegród budowlanych - docieplenie styropianem grubości 18 cm; - wymianę okien i drzwi zewnętrznych; - docieplenie dachu styropapą o grubości 25 cm; - modernizację instalacji c.o. jako elementu kompleksowej modernizacji energetycznej budynku; - wymianę oświetlenia wewnętrznego oraz zewnętrznego na energooszczędne; - przebudowę systemu wentylacji i klimatyzacji; - wymianę źródła ciepła nieefektywnego ekologicznie (wraz z pozostałymi elementami systemu grzewczego) na system grzewczy wykorzystujący biomasę; - pozostałe roboty budowlane i instalacyjne (Polish)
    0 references
    The project includes a comprehensive thermomodernisation of a building consisting of 2 segments at ul. Forest 4 in Rudziniec. The building has been taken over by the municipality for the new ZBGKiM headquarters, but requires comprehensive thermal modernisation due to failure to meet the requirements of insulation of external walls, roof, doors and windows. The project covers the following main types of construction works: — improvement of insulation of building partitions – 18 cm thick polystyrene warming; — replacement of windows and external doors; — 25 cm thick styropapa roof warming; — modernisation of the central heating system as part of a comprehensive energy modernisation of the building; — exchange of internal and external lighting with energy-efficient lighting; — reconstruction of the ventilation and air-conditioning system; — the exchange of an environmentally inefficient heat source (including other elements of the heating system) to a biomass heating system; — other construction and installation works (English)
    21 October 2020
    0 references
    Le projet comprend une thermomodernisation complète d’un bâtiment composé de 2 segments à ul. Forêt 4 à Rudziniec. Le bâtiment a été repris par la municipalité pour le nouveau siège de ZBGKiM, mais nécessite une modernisation thermique complète en raison du non-respect des exigences en matière d’isolation des murs extérieurs, du toit, des portes et des fenêtres. Le projet couvre les principaux types de travaux de construction suivants: — amélioration de l’isolation des cloisons de bâtiment — isolation avec une épaisseur de polystyrène de 18 cm; — remplacement des fenêtres et des portes extérieures; — réchauffement du toit avec 25 cm d’épaisseur Styropap; — modernisation des installations de chauffage central dans le cadre d’une modernisation complète de l’énergie du bâtiment; — remplacement de l’éclairage intérieur et extérieur par un éclairage économe en énergie; — reconstruction du système de ventilation et de climatisation; — remplacement d’une source de chaleur inefficace (y compris d’autres éléments du système de chauffage) par un système de chauffage à biomasse; — autres travaux de construction et d’installation (French)
    2 December 2021
    0 references

    Identifiers

    RPSL.04.03.01-24-042F/16
    0 references