Improving the functioning of waste water management in the Rudnik-San metropolitan area by modernising waste water treatment plant and extension of sanitary sewage system (Q118932)

From EU Knowledge Graph
Revision as of 07:29, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif stratégique du projet est d’améliorer l’environnement naturel et la qualité de vie des habitants de la région de la municipalité et de la ville de Rudnik nad Sanem. L’objet du projet est la reconstruction avec l’extension de la station d’épuration des eaux usées de Rudnik nad Sanem avec les installations et équipements nécessaires, ainsi que l’extension du réseau d’assainissement sanitaire. Le projet prévoit la construction et des tra...)
Jump to navigation Jump to search
Project Q118932 in Poland
Language Label Description Also known as
English
Improving the functioning of waste water management in the Rudnik-San metropolitan area by modernising waste water treatment plant and extension of sanitary sewage system
Project Q118932 in Poland

    Statements

    0 references
    7,350,435.73 zloty
    0 references
    1,764,104.58 Euro
    13 January 2020
    0 references
    8,647,571.47 zloty
    0 references
    2,075,417.15 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 March 2017
    0 references
    26 October 2018
    0 references
    GMINA I MIASTO RUDNIK NAD SANEM
    0 references
    0 references
    Celem strategicznym projektu jest poprawa stanu środowiska naturalnego i podniesienie jakości życia mieszkańców na obszarze Gminy i Miasta Rudnik nad Sanem. Przedmiotem podejmowanego projektu jest przebudowa z rozbudową oczyszczalni ścieków w Rudniku nad Sanem wraz z wymaganymi instalacjami i urządzeniami, a także rozbudowa sieci kanalizacji sanitarnej. W ramach projektu przewiduje się prace budowlane i technologiczne w zakresie mechaniczno-biologicznej oczyszczalni ścieków z symultanicznym wspomaganiem usuwania fosforu, pracującej w układzie denitryfikacji wstępnej. Oczyszczalnia ścieków wyposażona zostanie w układ niwelacji ponadnormatywnego napływu ścieków np. w trakcie trwania opadów atmosferycznych. Ponadto przewiduje się montaż instalacji OZE do produkcji energii elektrycznej na potrzeby działania i funkcjonowania oczyszczalni ścieków . Dodatkowo niezbędnym elementem projektu jest rozbudowa działającej sieci kanalizacyjnej na terenie Gminy i Miasta Rudnik nad Sanem (w obszarze aglomeracji Rudnik nad Sanem) o kanalizację grawitacyjną o długości 685 m, kanalizację tłoczną 307 m wraz ze studzienkami 25 szt. oraz budowę przepompowni o średnicy 1500 cm i wysokości 4600 cm. (Polish)
    0 references
    The strategic goal of the project is to improve the state of the environment and improve the quality of life of residents in the area of the Municipality and the City of Rudnik nad Sanem. The subject of the project is the reconstruction with the extension of the sewage treatment plant in Rudnik nad San, together with the required installations and equipment, as well as the extension of the sanitary sewage system. The project envisages construction and technological work in the field of mechanical and biological sewage treatment plant with simultaneous support for phosphorus removal, working in the pre-denitrification system. The sewage treatment plant will be equipped with an overvalorative sewage system, e.g. during precipitation. In addition, the installation of RES installations for the production of electricity for the operation and operation of the sewage treatment plant is envisaged. In addition, an essential element of the project is the extension of a functioning sewerage network in the Municipality and the City of Rudnik nad San (in the area of Rudnik nad Sanem agglomeration) with 685 m long gravity sewerage, 307 m discharge sewage system with 25 wells and the construction of a pumping room with a diameter of 1500 cm and a height of 4600 cm. (English)
    20 October 2020
    0 references
    L’objectif stratégique du projet est d’améliorer l’environnement naturel et la qualité de vie des habitants de la région de la municipalité et de la ville de Rudnik nad Sanem. L’objet du projet est la reconstruction avec l’extension de la station d’épuration des eaux usées de Rudnik nad Sanem avec les installations et équipements nécessaires, ainsi que l’extension du réseau d’assainissement sanitaire. Le projet prévoit la construction et des travaux technologiques dans le domaine d’une station d’épuration mécanique et biologique des eaux résiduaires, avec un soutien simultané pour l’élimination du phosphore, fonctionnant dans un système de prédénitrification. La station de traitement des eaux résiduaires sera équipée d’un système d’entrées excessives d’eaux usées, par exemple pendant les précipitations. En outre, il est envisagé d’installer des installations SER pour la production d’électricité pour l’exploitation et l’exploitation des stations d’épuration des eaux usées. En outre, un élément essentiel du projet est l’extension du réseau d’assainissement en état de marche dans la municipalité et la ville de Rudnik nad Sanem (dans la zone de l’agglomération Rudnik-San) avec des égouts gravitaires d’une longueur de 685 m, un égout de 307 m avec des puits de 25 unités et la construction d’une station de pompage d’un diamètre de 1 500 cm et d’une hauteur de 4 600 cm. (French)
    2 December 2021
    0 references