Improving the quality and accessibility of education at the general level through the expansion and reconstruction of the John Paul II Secondary School – Sisters of Presents in Rzeszów (Q119334)
Jump to navigation
Jump to search
Project Q119334 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the quality and accessibility of education at the general level through the expansion and reconstruction of the John Paul II Secondary School – Sisters of Presents in Rzeszów |
Project Q119334 in Poland |
Statements
994,193.11 zloty
0 references
2,426,044.75 zloty
0 references
40.98 percent
0 references
24 July 2015
0 references
31 March 2017
0 references
ZGROMADZENIE PANIEN OFIAROWANIA NAJŚWIĘTSZEJ MARYI PANNY
0 references
Potrzeba realizacja niniejszego projektu wynika z analizy problemów, z jakimi boryka się jedna z najlepszych w województwie szkół kształcących na poziomie ogólnym – Liceum Ogólnokształcące im. Jana Pawła II – Sióstr Prezentek. Głównymi problemami, które niniejszy projekt stara się rozwiązać, są: • Zbyt mała powierzchnia dydaktyczna • Niski dostęp dzieci i młodzieży do nowoczesnej i dobrze wyposażonej infrastruktury sportowej oraz dydaktycznej (ograniczony dostęp uczniów do nowoczesnej infrastruktury (ICT) , materiałów edukacyjnych, sprzętu) • Brak możliwości realizacji alternatywnych, aktywnych form spędzania czasu wolnego dzieci i młodzieży z możliwością kreowania kompetencji istotnych dla rynku pracy, gospodarki opartej na wiedzy Celem niniejszego projektu jest wzrost dostępności oraz jakości i atrakcyjności oferty edukacyjnej na poziomie ogólnym w mieście Rzeszowie, poprzez rozbudowę istniejącego obiektu Liceum Ogólnokształcącego. Cel ten zostanie zrealizowany poprzez następujący zakres rzeczowy projektu: - - rozbudowę istniejącego obiektu o nowe skrzydło, - dostosowanie obiektu do potrzeb osób niepełnosprawnych – montaż windy, umożliwiającej dotarcie na każdą kondygnację nowej oraz istniejącej części szkoły, - przygotowanie pomieszczenia, stanowiącego przedłużenie istniejącej Sali gimnastycznej, w której będzie sala do ćwiczeń (fitness) + siłownia, - dostawa sprzętu ICT w celu unowocześnienia działalności placówki, - dostawa pomocy dydaktycznych na potrzeby pracowni fizyki. W wyniku projektu powierzchnia użytkowa obiektu zwiększy się o 670,99 m2 a kubatura o 2 689 m3, docelowe parametry odpowiednio: 3 915,03 m2 oraz 12 724 m2. Projekt realizowany jest w partnerstwie z Fundacją Akademia Szczęśliwej Rodziny - udział partnera w projekcie polega na wniesieniu zasobów ludzkich, wiedzy i doświadczenia - posiada charakter niefinansowy. Rezultatem projektu będzie wzrost liczby miejsc w szkole o 10 uczniów, zapewniając miejsca łącznie dla 447 uczniów. (Polish)
0 references
The need to implement this project stems from the analysis of the problems faced by one of the best schools in the voivodship that educate on the general level – John Paul II Secondary School – Sisters of Presents. The main problems this project seeks to address are: • Too small educational space • Low access for children and young people to modern and well-equipped sports and teaching infrastructure (limited access of pupils to modern infrastructure (ICT), educational materials, equipment) • Inability to implement alternative, active forms of leisure time for children and young people with the possibility of creating competences relevant to the labour market, knowledge-based economy The aim of this project is to increase the availability and quality and attractiveness of educational offer at the general level of the city. This objective will be achieved through the following material scope of the project: — – extension of the existing facility with a new wing, – adaptation of the facility to the needs of people with disabilities – installation of an elevator, enabling access to each floor of the new and existing part of the school, – preparation of the room, which is an extension of the existing gym, in which there will be a fitness room + gym, – delivery of ICT equipment to modernise the activity of the facility, – delivery of teaching aid for the needs of the physics studio. As a result of the project, the usable area of the facility will increase by 670.99 m² and the volume by 2689 m³, the target parameters respectively: 3915.03 m² and 12724 m². The project is implemented in partnership with the Foundation The Happy Family Academy – the participation of a partner in the project involves the provision of human resources, knowledge and experience – has a non-financial character. The project will result in an increase in the number of places in the school by 10 pupils, providing seats for a total of 447 pupils. (English)
20 October 2020
0 references
La nécessité de mettre en œuvre ce projet résulte d’une analyse des problèmes rencontrés par l’une des meilleures écoles de la province d’enseignement général — l’école secondaire Jean-Paul II — Sœurs des cadeaux. Les principaux problèmes que ce projet vise à résoudre sont les suivants: • Manque d’espace pédagogique • Faible accès des enfants et des jeunes à des infrastructures sportives et pédagogiques modernes et bien équipées (accès limité des étudiants aux infrastructures modernes (TIC), matériels éducatifs, équipements) • L’absence de possibilité de mettre en œuvre des formes de loisirs alternatives et actives pour les enfants et les jeunes, avec la possibilité de créer des compétences pertinentes pour le marché du travail, l’économie de la connaissance. L’objectif de ce projet est d’accroître la disponibilité, la qualité et l’attractivité de l’offre éducative au niveau général dans la ville de Rzeszów, en élargissant les installations existantes de l’École secondaire générale. Cet objectif sera atteint grâce à la portée substantielle suivante du projet: — L’extension de l’installation existante avec une nouvelle aile, — adaptation de l’installation aux besoins des personnes handicapées — installation d’un ascenseur permettant d’atteindre chaque étage de la partie nouvelle et existante de l’école, — préparation d’une salle, qui est une extension du gymnase existant, dans lequel il y aura une salle de fitness + gymnase, — fourniture d’équipements TIC pour moderniser les activités de l’installation, — fourniture d’aides pédagogiques pour les besoins du studio de physique. À la suite du projet, la surface utile de l’installation augmentera de 670,99 m² et le volume de 2 689 m³, les paramètres cibles respectivement: 3 915,03 m² et 12 724 m². Le projet est mis en œuvre en partenariat avec la Fondation de l’Académie de la Famille heureuse — la participation du partenaire au projet consiste à apporter des ressources humaines, des connaissances et de l’expérience — il a un caractère non financier. Le projet entraînera une augmentation du nombre de places scolaires de 10 élèves, ce qui permettra d’accueillir un total de 447 élèves. (French)
2 December 2021
0 references
Identifiers
RPPK.06.04.03-18-0076/16
0 references