“Green energy – construction of photovoltaic power plant” (Q116839)

From EU Knowledge Graph
Revision as of 06:40, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet concerne un investissement consistant en la construction d’une centrale photovoltaïque d’une capacité maximale de 0,89991 MW. Le projet met en œuvre l’objectif spécifique: Augmentation de la part de la production d’énergie renouvelable distribuée Mesure 5.1 ROPWP. La mise en œuvre du projet contribuera à accroître la part des énergies renouvelables dans la production totale d’énergie. La mise en œuvre des mesures entraînera une réducti...)
Jump to navigation Jump to search
Project Q116839 in Poland
Language Label Description Also known as
English
“Green energy – construction of photovoltaic power plant”
Project Q116839 in Poland

    Statements

    0 references
    2,110,639.88 zloty
    0 references
    506,553.57 Euro
    13 January 2020
    0 references
    3,170,557.13 zloty
    0 references
    760,933.71 Euro
    13 January 2020
    0 references
    66.57 percent
    0 references
    29 June 2018
    0 references
    30 July 2019
    0 references
    AGRA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°6'59.4"N, 23°12'18.0"E
    0 references
    Przedmiotem projektu jest inwestycja polegająca na budowie elektrowni fotowoltaicznej o mocy do 0,89991MW. Projekt wprost realizuje Cel szczegółowy: Zwiększony udział rozproszonej produkcji energii ze źródeł odnawialnych Działania 5.1 RPOWP. Realizacja projektu przyczyni się do zwiększenia udziału energii odnawialnej w produkcji energii ogółem. Efektem realizacji działań będzie redukcja emisji CO2 i poprawa stanu środowiska, ale także wzrost potencjału ekonomicznego województwa. Realizacja projektu przyczyni się do osiągnięcia wskaźnika rezultatu RPOWP : Udział energii ze źródeł odnawialnych w końcowym zużyciu energii brutto z 15,5%w 2012 do 18,6% w 2023. Projekt pozwoli na osiągnięcie następujących wskaźników produktu : • Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI) MW – 0,89991 (2019r) • Liczba wbudowanych jednostek wytwarzania energii elektrycznej z OZE - 1 szt (2019r) • Liczba przedsiębiorstw otrzymujących wsparcie (CI) – 1 szt. (2019r) • Szacowany spadek emisji gazów cieplarnianych (CI) tony ekwiwalentu CO2 –691,55 (2020r) – wielkość w pierwszym pełnym roku po zakończeniu realizacji projektu. Dla oszacowania efektu ekologicznego wykorzystano referencyjny wskaźnik emisyjności dwutlenku węgla dla produkcji energii elektrycznej, który dla energii elektrycznej wynosi 0,812 Mg CO2/MWh rezultatu: • Produkcja energii elektrycznej z nowo wybudowanych /nowych mocy wytwórczych instalacji wykorzystujących OZE MWh/rok – 871,67 w 2020 r • Nowe miejsce pracy – 1 etat Wnioskujemy o dofinansowanie projektu w ramach 3 typu przewidzianego w niniejszym konkursie: Inwestycji z zakresu budowy nowych lub zwiększenia mocy jednostek wytwarzania energii elektrycznej i ciepła z OZE (biomasy, biogazu, energii wiatru, słońca, wody oraz ziemi) wraz z podłączeniem do sieci dystrybucyjnej/przesyłowej. Planowany termin rzeczowej realizacji projektu marzec - czerwiec 2019r. (Polish)
    0 references
    The subject of the project is an investment involving the construction of a photovoltaic power plant with a capacity of up to 0,89991 MW. The project implements the specific objective: Increased share of distributed renewable energy production Measures 5.1 RPOWP. The implementation of the project will contribute to increasing the share of renewable energy in total energy production. The result of the implementation of the measures will be to reduce CO2 emissions and improve the state of the environment, but also to increase the economic potential of the voivodship. The implementation of the project will contribute to achieving the result indicator of RPOWP: Share of energy from renewable sources in gross final energy consumption from 15.5 % in 2012 to 18.6 % in 2023. The project will achieve the following product indicators: • Additional renewable energy generation capacity (CI) MW – 0.89991 (2019 years) • Number of built-in RES generation units – 1 units (2019r) • Number of enterprises receiving support (CI) – 1 units. (2019r) • Estimated decrease in greenhouse gas emissions (CI) tons CO2-691.55 (2020r) – volume in the first full year after completion of the project. For the estimation of the environmental effect, a reference carbon footprint for electricity production was used, which for electricity is 0,812 Mg CO2/MWh of the result: • Manufacture of electricity from newly built/new generation capacity installations using RES MWh/year – 871.67 in 2020 • New workplace – 1 jobs We apply for funding of the project under the 3 type foreseen in this competition: Investments in the construction of new or increased power generation units for electricity and heat from RES (biomass, biogas, wind, sun, water and land) with connection to the distribution/transmission network. Planned deadline for the actual implementation of the project March – June 2019 (English)
    20 October 2020
    0 references
    Le projet concerne un investissement consistant en la construction d’une centrale photovoltaïque d’une capacité maximale de 0,89991 MW. Le projet met en œuvre l’objectif spécifique: Augmentation de la part de la production d’énergie renouvelable distribuée Mesure 5.1 ROPWP. La mise en œuvre du projet contribuera à accroître la part des énergies renouvelables dans la production totale d’énergie. La mise en œuvre des mesures entraînera une réduction des émissions de CO2 et une amélioration de l’environnement, mais aussi une augmentation du potentiel économique de la voïvodie. La mise en œuvre du projet contribuera à la réalisation de l’indicateur de résultat ROPWP: Part de l’énergie produite à partir de sources renouvelables dans la consommation finale brute d’énergie, de 15,5 % en 2012 à 18,6 % en 2023. Le projet permettra d’obtenir les indicateurs de réalisation suivants: • Capacité supplémentaire de production d’énergie renouvelable (IC) MW — 0,89991 (2019) • Nombre d’unités de production d’électricité SER intégrées — 1 pcs (2019) • Nombre d’entreprises bénéficiant d’un soutien (IC) — 1 PC. (2019) • Réduction estimée des émissions de gaz à effet de serre (IC) tonnes d’équivalent CO2-691.55 (2020) — volume au cours de la première année complète après l’achèvement du projet. Le référentiel carbone de référence pour la production d’électricité, qui est de 0,812 Mg de CO2/MWh pour l’électricité, a été utilisé pour estimer l’effet écologique: • Production d’électricité à partir de nouvelles capacités de production d’installations utilisant des RES MWh/an — 871,67 en 2020 • Nouveau lieu de travail — 1 emploi Nous sollicitons un financement pour le projet de type 3 prévu dans ce concours: Investissements dans la construction de capacités nouvelles ou accrues d’unités produisant de l’électricité et de la chaleur à partir de sources d’énergie renouvelables (biomasse, biogaz, vent, soleil, eau et terre) ainsi que le raccordement au réseau de distribution/transmission. Date prévue de mise en œuvre matérielle du projet Mars — Juin 2019. (French)
    2 December 2021
    0 references

    Identifiers

    RPPD.05.01.00-20-0322/17
    0 references