“Modernisation of the People’s Theatre buildings with the construction of the necessary infrastructure for cultural activities and the development of space around buildings for public and social purposes” (Q114359)

From EU Knowledge Graph
Revision as of 19:47, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Modernisation du bâtiment technique du théâtre administratif Le théâtre 23 dans le cadre de la revitalisation des infrastructures culturelles créera un nouvel espace public convivial pour les citoyens. La revitalisation de l’espace autour des bâtiments du théâtre sera réalisée en même temps que la construction des infrastructures nécessaires à la réalisation d’activités culturelles.Les paramètres caractéristiques de la taille de l’objet seront m...)
Jump to navigation Jump to search
Project Q114359 in Poland
Language Label Description Also known as
English
“Modernisation of the People’s Theatre buildings with the construction of the necessary infrastructure for cultural activities and the development of space around buildings for public and social purposes”
Project Q114359 in Poland

    Statements

    0 references
    5,187,377.16 zloty
    0 references
    1,244,970.52 Euro
    13 January 2020
    0 references
    7,980,580.35 zloty
    0 references
    1,915,339.28 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 January 2019
    0 references
    31 October 2021
    0 references
    TEATR LUDOWY
    0 references
    Modernizacja budynku techniczno administracyjnego Teatru os. Teatralne 23 jako element rewitalizacji obszarów infrastruktury kultury spowoduje powstanie nowej, przyjaznej mieszkańcom przestrzeni publicznej. Zostanie przeprowadzona rewitalizacja przestrzeni wokół budynków Teatru wraz z budową niezbędnej infrastruktury do prowadzenia działań kulturalnych.Charakterystyczne parametry wielkościowe przedmiotowego obiektu ulegną zmianie w związku z planowaną przebudową i rozbudową.Parametry projektowanej inwestycji zgodnie z przekazaną koncepcją:Powierzchnia terenu inwestycji: 1846,20 m2Powierzchnia zabudowy istniejąca: 708,66 m2Powierzchnia zabudowy projektowana: 964, 20 m2Powierzchnia użytkowa istniejąca: 1824,12Powierzchnia użytkowa projektowana: 3518,3 m2Piwnica 649,20 m2Parter 806,00 m2Piętro 1 669,40 m2Piętro 2 666,40 m2Piętro 3 727,30 m2Powierzchnia całkowita projektowana: 2878,30 m2w tym: pow. adaptowana: 1779,52 m2 pow. nowoprojektowana:1104,78 m2 pow. ruchu: 945,50 m2Kubatura istniejąca: 10254,31 m2Kubatura projektowana: 17235,20 m2w tym: część nadziemna: 14026,20 m2 część podziemna: 3209,00 m2Przebudowa części parterowej oraz I piętra utworzy na obydwu kondygnacjach otwartą przestrzeń dla widza i wydzielone części: administracyjną oraz zaplecza teatralnego.Modernizacja sali teatralnej Stolarni, rozbudowa Sali prób i adaptacja na salę dla dzieci.Przebudowa II piętra wzbogaci obiekt o dodatkowe pokoje gościnne oraz salę wielofunkcyjną.Piętro III, poza już istniejącymi pokojami gościnnymi, wyposażone będzie w dużą przestrzeń magazynową oraz pracownie.Zagospodarowanie terenu przewiduje oprócz likwidacji istniejącego ogrodzenia urządzenie zewnętrznej przestrzeni, która zasadniczo stanowi duży taras stanowiący zarazem zadaszenie części podziemnej budynku. W części taras przewidziany jest do zazielenienia a w części stanowi podłogę z desek. Pozostałe, wolne od zabudowy tereny przeznaczone są na zieleń. (Polish)
    0 references
    Modernisation of the technical and administrative building of the Teatr os. Theatrical 23 as part of the revitalisation of cultural infrastructure will create a new, friendly public space. The revitalisation of the space around the theatre’s buildings will be carried out together with the construction of the necessary infrastructure for conducting cultural activities.The characteristic size parameters of the facility will change due to the planned reconstruction and expansion.Parameters of the project project according to the presented concept: 1846,20 m2Existing surface area: 708,66 m2Construction surface designed: 964, 20 m2Existing surface area: 1824,12Use surface designed: 3518,3 m2Piwnica 649,20 m2Parter 806,00 m2Field 1 669.40 m2Field 2 666.40 m2Pion 3727.30 m² Total surface designed: 2878,30 m² of which: adaptable area: 1779,52 m² newly designed area: 1104,78 m² of traffic area: 945,50 m2Existing body: 10254,31 m2Designed body: 17235,20 m² of which: terrestrial part: 14026,20 m² underground part: 3209,00 m2Reconstruction of the ground floor and the first floor will create on both floors an open space for the viewer and separate parts: administrative and theatre facilities.Modernisation of the carpentry shop theatre hall, extension of the rehearsal room and adaptation to the children’s room.Reconstruction of the second floor will enrich the building with additional guest rooms and multifunctional room.Pietro III, apart from existing guest rooms, will be equipped with a large storage space and studios. Part of the terrace is for greening and part of the floor with boards. Other areas, free of construction, are intended for greenery. (English)
    20 October 2020
    0 references
    Modernisation du bâtiment technique du théâtre administratif Le théâtre 23 dans le cadre de la revitalisation des infrastructures culturelles créera un nouvel espace public convivial pour les citoyens. La revitalisation de l’espace autour des bâtiments du théâtre sera réalisée en même temps que la construction des infrastructures nécessaires à la réalisation d’activités culturelles.Les paramètres caractéristiques de la taille de l’objet seront modifiés en raison de la reconstruction et de l’agrandissement prévus.Paramètres de l’investissement projeté selon le transfert koncepcją:powierzchnia de la zone d’investissement: 1846,20 m2Zone de construction existante: 708,66 m² Surface du bâtiment conçue: 964,20 m² Superficie exploitée existante: 1824,12 Surface au sol conçue: 3518.3 m2Piwnica 649.20 m2Partenaire 806,00 m2Patro 1 669.40 m2Fare 2 666.40 m2Patro 3 727,30 m² Surface totale conçue: 2 878,30 m² dont: zone adaptable: 1 779,52 m² de surface nowoprojektowana:1104,78 m² de zone de circulation: 945,50 m² Cabine existante: 10 254,31 m² Quantité désignée: 17 235,20 m² dont: section générale: 14 026,20 m² partie souterraine: 3209,00 m2Reconstruction du rez-de-chaussée et du premier étage créera un espace ouvert pour le spectateur sur les deux étages et pièces séparées: installations administratives et théâtrales.Modernisation de la salle de théâtre du Carpenter, extension de la salle de répétition et adaptation à la chambre des enfants.La reconstruction du deuxième étage enrichira l’installation de chambres d’hôtes supplémentaires et d’une salle multifonctionnelle. Outre les chambres d’hôtes déjà existantes, le III sera équipé d’un grand espace de rangement et d’un atelier.Le développement de la zone prévoit l’enlèvement de la clôture existante, un dispositif d’espace extérieur, qui constitue essentiellement une grande terrasse, qui est également une toiture de la partie souterraine du bâtiment. En partie, la terrasse est prévue pour le verdissement et en partie est un étage en planches. D’autres espaces libres sont destinés à la verdure. (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.11.01.01-12-0560/17
    0 references