Construction of a photovoltaic installation for the production of power for ROTOR (Q104863)

From EU Knowledge Graph
Revision as of 09:12, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consiste en la construction de panneaux photovoltaïques sur le toit de l’usine ROTOR Mechanics Machines Ryszard Walczak à Motycz, Motycz 325C. L’installation se compose de 60 panneaux photovoltaïques d’une puissance unitaire de 265 Wp, puissance d’installation 15,9 kWp. L’installation produira de l’électricité pour les besoins de ROTOR. L’objectif du projet est d’accroître la compétitivité de l’entreprise en réduisant les coûts de cons...)
Jump to navigation Jump to search
Project Q104863 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic installation for the production of power for ROTOR
Project Q104863 in Poland

    Statements

    0 references
    57,145.01 zloty
    0 references
    13,714.80 Euro
    13 January 2020
    0 references
    87,915.4 zloty
    0 references
    21,099.7 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 April 2018
    0 references
    30 September 2018
    0 references
    ROTOR ZAKŁAD MECHANIKI MASZYN SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Projekt polega na budowie instalacji paneli fotowoltaicznych na dachu budynku przedsiębiorstwa ROTOR Zakład Mechaniki Maszyn Ryszard Walczak w Motyczu, Motycz 325C. Instalacja składa się z 60 paneli fotowoltaicznych o mocy jednostkowej 265 Wp, moc instalacji 15,9 kWp. Instalacja produkowała będzie energię elektryczną na potrzeby firmy ROTOR. Celem projektu jest podniesienie konkurencyjności przedsiębiorstwa poprzez obniżenie kosztów zużywanej energii. Panele fotowoltaiczne zostaną zamontowane na południowo-wschodniej połaci dachowej pod kątem 17° na systemie montażowym. W celu zoptymalizowania produkcji energii, zastosowany zostanie system, w którym każdy z modułów fotowoltaicznych ma własny traker śledzący punkt mocy maksymalnej. W celu zwiększenia współczynnika auto-konsumpcji i tym samym zredukowania ilości energii oddanej do sieci zakładu energetycznego, system fotowoltaiczny zostanie wyposażony w programowalny sterownik do optymalizacji poboru własnego, energii wytwarzanej przez elektrownię fotowoltaiczną. Moduł pomiarowy będzie mierzył w czasie rzeczywistym prąd we wszystkich fazach. W projekcie założono, że zarówno falownik jak i kontroler zarządzania energią, zostaną podłączone do wewnętrznej sieci LAN z dostępem do Internetu. Kontroler zarządzania energią, generuje własną witrynę dostępną w sieci LAN, do której jest podłączony. Za jej pośrednictwem użytkownik ma możliwość wprowadzania ustawień dotyczących pracy kontrolera a także generowania raportów okresowych. Witryna daje możliwość podglądu na żywo dla m. in. takiego parametru jak wartość prądowa i kierunek przepływu prądu dla każdej fazy w instalacji wewnętrznej. System monitoringu użyty będzie także w multimedialnym systemie prezentacji danych poprzez wyświetlenie parametrów instalacji fotowoltaicznej na ekranie monitora. Dane te będą prezentowane w sposób dostępny dla osób trzecich w siedzibie inwestora, pełniąc rolę informacyjną oraz podnosząc świadomość ekologiczną. (Polish)
    0 references
    The project consists of the construction of the installation of photovoltaic panels on the roof of the company ROTOR Machine Mechanics Department Ryszard Walczak in Motycz, Motycz 325C. The installation consists of 60 photovoltaic panels with a unit output of 265 Wp, installation power of 15,9 kWp. The installation will produce electricity for ROTOR’s needs. The aim of the project is to increase the competitiveness of the company by reducing the costs of energy consumed. Photovoltaic panels will be installed in the south-eastern roofing area at an angle of 17° on the assembly system. In order to optimise energy production, a system will be used in which each of the photovoltaic modules has its own traker tracking the maximum power point. In order to increase the auto-consumption factor and thereby reduce the amount of energy put into the power plant’s grid, the photovoltaic system will be equipped with a programmable controller to optimise own consumption, energy generated by a photovoltaic power plant. The measuring module will measure in real time the current in all phases. The project assumes that both the inverter and the power management controller will be connected to an internal LAN with Internet access. The energy management controller generates its own website available on the LAN to which it is connected. Through it, the user is able to set settings for the controller’s work as well as generate periodic reports. The site gives you the possibility to view live for, among others, a parameter such as current value and current flow direction for each phase in the internal installation. The monitoring system will also be used in the multimedia data presentation system by displaying the parameters of the photovoltaic installation on the monitor screen. This data will be presented in a manner accessible to third parties at the investor’s premises, performing an informational role and raising environmental awareness. (English)
    17 October 2020
    0 references
    Le projet consiste en la construction de panneaux photovoltaïques sur le toit de l’usine ROTOR Mechanics Machines Ryszard Walczak à Motycz, Motycz 325C. L’installation se compose de 60 panneaux photovoltaïques d’une puissance unitaire de 265 Wp, puissance d’installation 15,9 kWp. L’installation produira de l’électricité pour les besoins de ROTOR. L’objectif du projet est d’accroître la compétitivité de l’entreprise en réduisant les coûts de consommation d’énergie. Des panneaux photovoltaïques seront montés sur le toit sud-est à un angle de 17° sur le système de montage. Afin d’optimiser la production d’énergie, un système sera utilisé lorsque chacun des modules photovoltaïques a son propre traker suivi du point de puissance maximale. Afin d’augmenter le taux d’autoconsommation et ainsi réduire la quantité d’énergie transférée au réseau de la centrale électrique, le système photovoltaïque sera équipé d’un régulateur programmable pour optimiser la consommation de sa propre énergie produite par une centrale photovoltaïque. Le module de mesure mesurera le courant dans toutes les phases en temps réel. Le projet suppose que l’onduleur et le contrôleur de gestion de l’énergie seront connectés à un réseau local interne avec accès Internet. Le contrôleur de gestion de l’alimentation génère son propre site web disponible sur le réseau local auquel il est connecté. Grâce à elle, l’utilisateur a la possibilité d’entrer des paramètres pour le travail du contrôleur ainsi que de générer des rapports périodiques. Le site vous donne la possibilité de visualiser en direct des paramètres tels que la valeur du courant et la direction du flux de courant pour chaque phase de l’installation interne. Le système de surveillance sera également utilisé dans un système multimédia de présentation des données en affichant les paramètres de l’installation photovoltaïque sur l’écran de l’écran. Ces données seront présentées d’une manière accessible à des tiers dans les locaux de l’investisseur, à titre d’information et de sensibilisation à l’environnement. (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0049/17
    0 references