THERMAL MODERNISATION OF PUBLIC BUILDINGS – RECONSTRUCTION OF THE HEALTH CENTRE IN DAŃKOWY TOGETHER WITH THERMOMODERNISATION (Q101939)
Jump to navigation
Jump to search
Project Q101939 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF PUBLIC BUILDINGS – RECONSTRUCTION OF THE HEALTH CENTRE IN DAŃKOWY TOGETHER WITH THERMOMODERNISATION |
Project Q101939 in Poland |
Statements
108,607.08 zloty
0 references
127,773.04 zloty
0 references
85.0 percent
0 references
1 July 2016
0 references
30 September 2016
0 references
GMINA BIAŁA RAWSKA
0 references
Projekt obejmuje realizację działań termomodernizacyjnych w budynku mieszkalno-usługowym w Dańkowie w gminie Biała Rawska. Głównym celem projektu jest poprawa energetyczna przedmiotowego budynków poprzez kompleksowe działania termomodernizacyjne. Zaplanowana inwestycja w sposób zdecydowany przyczyni się do zwiększenia oszczędności wytwarzanej energii, optymalizacji kosztów eksploatacji budynku, a tym samym zmniejszenia emisji szkodliwych substancji do atmosfery.W ramach prac termomodernizacyjnych zostały przewidziane następujące prace: Zadanie 1 – Prace przygotowawcze - Zadanie obejmuje przygotowanie studium wykonalności, Zadanie 2 – Prace budowlane – Zadanie polega na wykonaniu prac termomodernizacyjnych dla budynku mieszkalno-usługowego w Dańkowie wynikających z załączonego audytu energetycznego i obejmuje: • Ocieplenie ścian zewnętrznych o powierzchni 433 m2 • Ocieplenie ścian zewnętrznych piwnic w gruncie o powierzchni 74 m2 • Ocieplenie dachu wraz z pokryciem papą termozgrzewalną o powierzchni 290 m2 • Wymiana okien o powierzchni 6,5m2 • Wymiana drzwi i wrót zewnętrznych o powierzchni 17,2 m2 • Wymiana instalacji c.o. • Wymiana instalacji c.w. Zadanie 3 – Prace towarzyszące - Zadanie obejmuje koszty dodatkowych prac budowlanych i wykończeniowych niezwiązanych bezpośrednio z pracami termomodernizacyjnymi. Zadanie 4 – Zarządzanie projektem i jego obsługa – Zadanie obejmuje koszty nadzoru inwestorskiego oraz promocji projektu. Przewidziane w ramach projektu działania pozwolą na zmniejszenie zapotrzebowania na energię przedmiotowego budynku o 67,4%, co przełoży się na obniżenie zużycia paliw konwencjonalnych i spowoduje ograniczenie emisji zanieczyszczeń powietrza. Projekt będzie realizowany na terenie gminy Biała Rawska. Jego odbiorcami będą lokatorzy zamieszkujący przedmiotowy budynek, pracownicy i pacjenci placówki zdrowotnej (parter budynku) oraz wszyscy mieszkańcy gminy Biała Rawska z uwagi na wpływ projektu na poprawę stanu środowiska naturalnego. (Polish)
0 references
The project includes the implementation of thermal modernisation activities in the residential and service building in Dańków in the Biała Rawska commune. The main objective of the project is to improve the energy of the buildings concerned through comprehensive thermo-modernisation measures. The planned investment will make a decisive contribution to increasing energy savings, optimising the building’s operating costs and thus reducing emissions of harmful substances into the atmosphere.The following work was envisaged as part of the thermal modernisation work: Task 1 – Preparatory work – The task includes the preparation of a feasibility study, Task 2 – Construction works – The task consists of carrying out thermal retrofitting works for the residential and service building in Dańków resulting from the attached energy audit and includes: • Warming of the external walls of 433 m² • Warming of the outer walls of the cellars in the ground area of 74 m² • Roof warming and thermal insulation covering 290 m² • Replacement of windows with an area of 6.5 m² • Replacement of doors and doors with an area of 17.2 m² • Replacement of central heating installations • Replacement of hot water installations. Task 3 – Accompanying work – The task covers the costs of additional construction and finishing works. Task 4 – Project management and operation – The task includes the costs of investor supervision and project promotion. The measures envisaged in the project will reduce the energy demand of the building in question by 67.4 %, which will reduce the consumption of conventional fuels and reduce emissions of air pollutants. The project will be implemented in Biała Rawska commune. Its recipients will be tenants living in the building, employees and patients of the health centre (ground floor of the building) and all residents of the Biała Rawska commune due to the impact of the project on improving the environment. (English)
17 October 2020
0 references
Le projet comprend la mise en œuvre d’activités de modernisation thermique dans un bâtiment résidentiel et de services à Dańków, dans la municipalité de Biała Rawska. L’objectif principal du projet est d’améliorer l’énergie des bâtiments concernés par des activités globales de thermomodernisation. L’investissement prévu contribuera de manière décisive à l’augmentation des économies d’énergie, à l’optimisation des coûts d’exploitation du bâtiment et, partant, à la réduction des émissions de substances nocives dans l’atmosphère. Activité 1 — Travaux préparatoires — La tâche comprend la préparation d’une étude de faisabilité, la tâche 2 — Travaux de construction — La tâche consiste à réaliser des travaux de modernisation thermique pour le bâtiment résidentiel et de service à Dańków résultant de l’audit énergétique ci-joint et couvre: • Isolation des murs extérieurs d’une superficie de 433 m² • Réchauffement des murs extérieurs des caves dans la surface de 74 m² • Chauffage du toit avec un revêtement de 290 m² chauffant • Remplacement des fenêtres d’une superficie de 6,5 m² • Remplacement des portes et des portails extérieurs par une surface de 17,2 m² • Remplacement des installations de chauffage • Remplacement des installations d’eau chaude. Activité 4 — Gestion de projet et service — La tâche couvre les coûts de supervision des investisseurs et de promotion des projets. Les mesures envisagées dans le cadre du projet permettront de réduire la demande énergétique du bâtiment de 67,4 %, ce qui réduira la consommation de combustibles conventionnels et les émissions de polluants atmosphériques. Le projet sera mis en œuvre dans la municipalité de Biała Rawska. Ses bénéficiaires seront les locataires du bâtiment, le personnel et les patients de l’établissement de santé (rez-de-chaussée du bâtiment) et tous les résidents de la municipalité de Biała Rawska en raison de l’impact du projet sur l’amélioration de l’environnement. (French)
1 December 2021
0 references
Identifiers
RPLD.04.02.02-10-0040/16
0 references