INVESTMENT IN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES IN BRENEN POLSKA (Q101849)
Jump to navigation
Jump to search
Project Q101849 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | INVESTMENT IN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES IN BRENEN POLSKA |
Project Q101849 in Poland |
Statements
197,100.0 zloty
0 references
262,800.0 zloty
0 references
75.0 percent
0 references
1 February 2018
0 references
31 December 2018
0 references
BRENEN POLSKA HENRYK WŁODARCZYK
0 references
Projekt pn. „Inwestycja w infrastrukturę służącą do produkcji energii elektrycznej ze źródeł odnawialnych w firmie Brenen Polska” dotyczy inwestycji w zakresie budowy instalacji wykorzystującej energię słoneczną, której łączna maksymalna moc zainstalowana wynosiła będzie 39,48 kWp . Zadanie realizowane będzie w okresie od dnia 01.02.2018r. do dnia 31.12.2018r. W celu realizacji inwestycji koniecznej jest nabycie w ramach Zadania 1 [Budowa mikroinstalacji fotowoltaicznej „on-gird” o mocy 39,48 kWp usługi na roboty budowlane, w wyniku których powstanie środek trwały - instalacja fotowoltaiczna typu „on-grid”, tzn. wpięta do sieci elektroenergetycznej o mocy ok. 39,48 kWp. Instalacja będzie zamonto-wana na dachu budynku zlokalizowanego przy ul. Kaliskiej 45 w miejscowości Warta i składała się będzie ze 141 paneli monokrystalicznych i falowników oraz infrastruktury montażowo-konstrukcyjnej, zabezpieczeń i okablowania. Na instalacje i uruchomienie złożą się: konfiguracja oraz montaż. Kompletna i autonomiczna instalacja fotowoltaiczna zagwarantować powinna Wnioskodawcy osiągnięcie co najmniej następujących korzyści z wdrożenia inwestycji: Generator energii fotowoltaicznej (sieć AC) – osiągnięcie wydajności na poziomie min. 36.755,88 kWh/ rocznie Prognozowany zysk roczny – min. 931 kWh/kWp Stosunek wydajności (PR) – min. 87% Emisja CO2, której dało się uniknąć – min. 22.582,56kg/rok Grupy docelowe: Pracownicy, kontrahenci i Firma BRENEN [użytkownicy bezpośredni - energia na potrzeby własne] oraz Krajowa Sieć Elektroenergetyczna [użytkownik po-średni – odbiorca nadwyżek prądu]. (Polish)
0 references
Project Mon. “Investment in infrastructure for the production of electricity from renewable sources in Brenen Polska” concerns investments in the construction of solar installations with a total maximum installed capacity of 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, it is necessary to acquire within Task 1 [Construction of a photovoltaic micro-installation “on-Gird” with a capacity of 39,48 kWp of construction services, resulting in the creation of a fixed asset – photovoltaic installation of the “on-grid” type, i.e. plugged into the power grid with a capacity of approx. 39,48 kWp. The installation will be installed on the roof of a building located on the street. Kaliska 45 in Warta will consist of 141 monocrystalline panels and inverters as well as assembly and construction infrastructure, security and wiring. Installations and commissioning will consist of: configuration and installation. A complete and autonomous PV installation should ensure that the applicant achieves at least the following benefits from the implementation of the investment: Photovoltaic power generator (AC network) – output of at least 36755.88 kWh/year Projected annual profit – min. 931 kWh/kWp Capacity ratio (PR) – min. 87 % Avoidable CO2 emissions – min. 22582,56 kg/year Target group: Employees, contractors and BRENEN [direct users – self-contained energy] and the National Electricity Network [intermediate user – receiver of excess current]. (English)
17 October 2020
0 references
Projet intitulé «Investissement dans les infrastructures de production d’électricité à partir de sources renouvelables à Brenen Polska» désigne un investissement dans la construction d’une installation utilisant l’énergie solaire, dont la capacité installée maximale totale sera de 39,48 kWc. L’activité se déroulera entre le 01/02/2018 et le 31.12.2018. Afin de réaliser l’investissement, il est nécessaire d’acquérir, dans le cadre de la tâche 1 [Construction d’une microinstallation photovoltaïque «sur ceinture» d’une capacité de 39,48 kWp un service de travaux de construction, ce qui donne lieu à un actif permanent — une installation photovoltaïque sur réseau, c’est-à-dire raccordée au réseau électrique d’une capacité d’env. 39,48 kWc. L’installation sera installée sur le toit du bâtiment situé à ul. Kaliska 45 à Warta et se composera de 141 panneaux monocristallins et onduleurs ainsi que des infrastructures d’assemblage et de construction, de sécurité et de câblage. Les installations et la mise en service comprendront: configuration et assemblage. Une installation photovoltaïque complète et autonome devrait garantir que la requérante tire au moins les avantages suivants de la mise en œuvre de l’investissement: Générateur d’énergie photovoltaïque (réseau CA) — efficacité minimale de 36 755,88 kWh/an Bénéfice annuel prévu — min. 931 kWh/kWp Ratio de performance (PR) — minimum 87 % d’émissions de CO2 qui pourraient être évitées — min. 22 582,56 kg/an Groupes cibles: Employés, entrepreneurs et brenen [utilisateurs directs — énergie à usage propre] et le réseau électrique national [utilisateur moyen — client d’électricité excédentaire]. (French)
1 December 2021
0 references
Identifiers
RPLD.04.01.02-10-0214/16
0 references