Construction of street lighting in Bukovec (Q101988)
Jump to navigation
Jump to search
Project Q101988 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of street lighting in Bukovec |
Project Q101988 in Poland |
Statements
408,900.45 zloty
0 references
528,500.0 zloty
0 references
77.37 percent
0 references
1 October 2017
0 references
30 September 2018
0 references
GMINA BRÓJCE
0 references
CELEM BEZPOŚREDNIM PROJEKTU JEST BUDOWA OŚWIETLENIA ULICZNEGO W BUKOWCU Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (LEDOWE OPRAWY ULICZNE). BUDOWA W/W INFRASTRUKTURY PRZYCZYNI SIĘ DO POPRAWY JAKOŚCI POWIETRZA NA TERENIE GMINY ORAZ CAŁEGO REGIONU ŁÓDZK., A TAKŻE PRZYCZYNI SIĘ DO ZMNIEJSZENIA ZAPOTRZEBOWANIA NA ENERGIĘ SEKTORA PUBLICZNEGO. CELAMI POŚREDNIMI (SZCZEGÓŁOWYMI) PROJEKTU BĘDĄ: • ZWIĘKSZENIE OBSZARU WOJEW. I KRAJU, NA KTÓRYM POPRAWIE ULEGNIE STAN POWIETRZA, • ZWIĘKSZENIE ŚWIADOMOŚCI SPOŁECZ. W ZAKRESIE OCHRONY ŚROD. W TYM W SZCZEGÓLNOŚCI POWIETRZA, • ZMNIEJSZENIE KOSZTÓW EKSPLOATACYJNYCH OŚWIETLENIA ULICZNEGO W PORÓWNANIU DO BUDOWY W SYSTEMIE TRADYCYJNYM, • ZMNIEJSZENIE ENERGOCHŁONNOŚCI SEKTORA PUBLI., • ZWIĘKSZENIE KOMFORTU ŻYCIA MIESZKAŃCÓW GMINY, • ZWIĘKSZENIE BEZPIECZEŃSTWA MIESZKAŃCÓW GMINY, • POPRAWA WYPOSAŻENIA W INFRASTRUKTURĘ UŻYTECZNOŚCI PUBLI. GMINY, • ZMNIEJSZENIE EMISJI ZANIECZYSZCZEŃ (W TYM CO2). CELEM ZAPEWNIENIA BEZKOLIZYJNEGO PROWADZENIA BUDOWY, KOLEJNOŚĆ WYKONYWANIA ROBÓT BĘDZIE NASTĘPUJĄCA: 1. ZŁĄCZA KABLOWE-KOSZTY KWALIF. GMINA WYKONUJE 8 ZŁĄCZY W SZAFKACH OŚWIETLENIA ULICZNEGO. W RAMACH ODRĘBNEGO OPRACOWANIA - KOSZT REALIZACJI PONOSI PGE DYSTRYBUCJA SA, POZA PROJEKTEM GMINY BUDOWANE SĄ I WYMIENIANE ZŁĄCZA W STACJACH TRANSFORMATOROWYCH. GMINA PONOSI JEDYNIE KOSZT MONTAŻU KABLA OD ZŁĄCZA PGE DO SZAFEK OŚWIETLENIA ULICZNEGO. TAKI ZABIEG JEST KONIECZNY ABY WPIĄĆ PROJEKTOWANE OŚWIETLENIE W ISTNIEJĄCE I ZAPEWNIĆ PRZEPŁYW ENERGII, 2. BUDOWA ROZDZIELNI OŚWIETLENIA ULIC, 3. BUDOWA LINII KABLOWEJ, 4. BUDOWA SŁUPÓW OŚWIETLENIA, 5. MONTAŻ OPRAW OŚWIETLENIA, 6. PODŁĄCZENIE PRZEWODÓW, 7. WYKONANIE POMIARÓW, 8. UPORZĄDKOWANIE TERENU. POTENCJALNYMI UŻYTKOWNIKAMI PROJEKTU BĘDĄ WSZYSCY MIESZKAŃCY GMINY BRÓJCE (W ROKU 2015 R. - ZAMIESZKIWAŁO 6 390 OS) ZE SZCZEGÓLNYM WSKAZANIEM MIESZKAŃCÓW MIEJSCOWOŚCI BUKOWIEC ORAZ POTENCJALNI NOWI MIESZKAŃCY GMINY. (Polish)
0 references
THE DIRECT OBJECTIVE OF THE PROJECT IS TO BUILD STREET LIGHTING IN BUKOWC USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT (LED STREET LUMINAIRES). THE CONSTRUCTION OF THE ABOVEMENTIONED INFRASTRUCTURE WILL CONTRIBUTE TO THE IMPROVEMENT OF AIR QUALITY IN THE MUNICIPALITY AND THE ENTIRE ŁÓDZK REGION, AND WILL ALSO CONTRIBUTE TO THE REDUCTION OF PUBLIC SECTOR ENERGY DEMAND. THE INDIRECT (SPECIFIC) OBJECTIVES OF THE PROJECT WILL BE: • INCREASING THE AREA OF VOIVODSHIPS. AND THE COUNTRY WHERE THE AIR CONDITION WILL IMPROVE, • INCREASE PUBLIC AWARENESS. FOR THE PROTECTION OF WEDNESDAYS. IN PARTICULAR, AIR, • REDUCTION OF OPERATING COSTS OF STREET LIGHTING COMPARED TO CONSTRUCTION IN THE TRADITIONAL SYSTEM, • DECREASE THE ENERGY INTENSITY OF THE PUBLI SECTOR., • INCREASE THE COMFORT OF THE RESIDENTS OF THE COMMUNE, • INCREASE SAFETY OF RESIDENTS OF THE MUNICIPALITY, • IMPROVEMENT OF EQUIPMENT WITH THE INFRASTRUCTURE OF UTILITY PUBS. MUNICIPALITIES, • REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). IN ORDER TO ENSURE THAT CONSTRUCTION WORKS ARE CARRIED OUT WITHOUT COLLISION, THE ORDER OF EXECUTION OF THE WORKS SHALL BE AS FOLLOWS: 1. CABLE CONNECTORS-KWALIF COSTS. THE MUNICIPALITY MAKES 8 CONNECTORS IN STREET LIGHTING CABINETS. AS PART OF A SEPARATE STUDY – THE COST OF IMPLEMENTATION IS BORNE BY PGE DISTRIBUTION SA, APART FROM THE PROJECT OF THE COMMUNE, CONNECTORS ARE BUILT AND REPLACED IN TRANSFORMER STATIONS. THE MUNICIPALITY ONLY BEARS THE COST OF INSTALLING THE CABLE FROM THE PGE CONNECTOR TO THE STREET LIGHTING CABINETS. SUCH A TREATMENT IS NECESSARY TO PLUG THE DESIGNED LIGHTING INTO EXISTING AND ENSURE THE FLOW OF ENERGY, 2. CONSTRUCTION OF A STREET LIGHTING SWITCHBOARD, 3. CABLE LINE CONSTRUCTION, 4. CONSTRUCTION OF LIGHT POLES, 5. INSTALLATION OF LIGHTING LUMINAIRES, 6. WIRE CONNECTION, 7. TAKING MEASUREMENTS, 8. TIDY UP THE AREA. POTENTIAL USERS OF THE PROJECT WILL BE ALL RESIDENTS OF BRÓJCE COMMUNE (IN 2015 – HAD A POPULATION OF 6,390 OS) WITH A SPECIAL INDICATION OF THE INHABITANTS OF BUKOWIEC AND POTENTIAL NEW RESIDENTS OF THE COMMUNE. (English)
17 October 2020
0 references
L’OBJECTIF DU PROJET DIRECT EST DE CONSTRUIRE L’ÉCLAIRAGE PUBLIC À BUKOWIEC À L’AIDE D’APPAREILS ÉCONOMES EN ÉNERGIE ET RESPECTUEUX DE L’ENVIRONNEMENT (ÉCLAIRAGES PUBLICS DIRIGÉS). LA CONSTRUCTION DE L’INFRASTRUCTURE SUSMENTIONNÉE CONTRIBUERA À AMÉLIORER LA QUALITÉ DE L’AIR DANS LA MUNICIPALITÉ ET L’ENSEMBLE DE LA RÉGION DE ŁÓDZK ET CONTRIBUERA ÉGALEMENT À RÉDUIRE LA DEMANDE D’ÉNERGIE DU SECTEUR PUBLIC. LES OBJECTIFS INTERMÉDIAIRES (DÉTAILLÉS) DU PROJET SERONT LES SUIVANTS: • AUGMENTER LA ZONE DE GUERRE. ET LE PAYS OÙ L’ÉTAT DE L’AIR VA S’AMÉLIORER • ACCROÎTRE LA SENSIBILISATION DU PUBLIC. EN TERMES DE MESURES DE CONSERVATION. Y COMPRIS, EN PARTICULIER, L’AIR, • LA RÉDUCTION DES COÛTS D’EXPLOITATION DE L’ÉCLAIRAGE PUBLIC PAR RAPPORT À LA CONSTRUCTION DANS LE SYSTÈME TRADITIONNEL, • LA RÉDUCTION DE L’INTENSITÉ ÉNERGÉTIQUE DU SECTEUR PUBLIC. • AUGMENTER LE CONFORT DE VIE DES HABITANTS DE LA COMMUNE, • AUGMENTER LA SÉCURITÉ DES RÉSIDENTS DE LA MUNICIPALITÉ, • AMÉLIORER L’ÉQUIPEMENT DE L’INFRASTRUCTURE DES SERVICES PUBLICS DE LA PUBLICATION. LES MUNICIPALITÉS, • RÉDUIRE LES ÉMISSIONS DE POLLUANTS (Y COMPRIS LE CO2). AFIN D’ASSURER LA NON-COLLISION DE LA CONSTRUCTION, L’ORDRE D’EXÉCUTION DES TRAVAUX SERA LE SUIVANT: 1. CONNECTEURS DE CÂBLE — QUALIF COÛTS. LA MUNICIPALITÉ FABRIQUE 8 CONNECTEURS DANS DES ARMOIRES D’ÉCLAIRAGE PUBLIC. DANS LE CADRE D’UNE ÉTUDE DISTINCTE — LE COÛT DE MISE EN ŒUVRE EST SUPPORTÉ PAR PGE DISTRIBUTION SA, OUTRE LE PROJET, LES MUNICIPALITÉS SONT CONSTRUITES ET REMPLACÉES DES CONNECTEURS DANS LES STATIONS DE TRANSFORMATION. LA COMMUNE NE SUPPORTE QUE LES FRAIS D’INSTALLATION DU CÂBLE DU CONNECTEUR PGE AUX ARMOIRES D’ÉCLAIRAGE PUBLIC. UN TEL TRAITEMENT EST NÉCESSAIRE POUR INSÉRER L’ÉCLAIRAGE CONÇU DANS L’EXISTANT ET ASSURER LE FLUX D’ÉNERGIE, 2. CONSTRUCTION D’UN TABLEAU D’ÉCLAIRAGE PUBLIC, 3. CONSTRUCTION D’UNE LIGNE DE CÂBLE, 4. CONSTRUCTION DE POTEAUX D’ÉCLAIRAGE, 5. INSTALLATION D’APPAREILS D’ÉCLAIRAGE, 6. CONNEXION FILAIRE, 7. PERFORMANCE DES MESURES, 8. NETTOYEZ LE TERRAIN. LES UTILISATEURS POTENTIELS DU PROJET SERONT TOUS LES RÉSIDENTS DE LA COMMUNE DE BRÓJCE (EN 2015-6.390 OS) AVEC UNE INDICATION SPÉCIALE DES HABITANTS DE BUKOWIEC ET DES NOUVEAUX RÉSIDENTS POTENTIELS DE LA MUNICIPALITÉ. (French)
1 December 2021
0 references
Identifiers
RPLD.04.03.01-10-0002/17
0 references