Demolition and construction of a new bridge with a touring bridge over the river. Guard in Skwierzyn in the course of Voivodeship No. 159, Nowe Polichno-Skwierzyna in km 13+ 423 (Q100447)

From EU Knowledge Graph
Revision as of 08:43, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend la démolition et la construction d’un nouveau pont, ainsi qu’un pont de détour à travers le district de Skwierzyna, le long de la route no 159 New Polichno-Skwierzyna sur une distance de 0,21 km, dans le cadre de la démolition et de la construction de travées, de supports intermédiaires et de pieds, Prévu pour les supports et structures de soutien de l’installation dans le domaine des travaux routiers, travaux de ponts avec él...)
Jump to navigation Jump to search
Project Q100447 in Poland
Language Label Description Also known as
English
Demolition and construction of a new bridge with a touring bridge over the river. Guard in Skwierzyn in the course of Voivodeship No. 159, Nowe Polichno-Skwierzyna in km 13+ 423
Project Q100447 in Poland

    Statements

    0 references
    14,583,545.81 zloty
    0 references
    3,500,050.99 Euro
    13 January 2020
    0 references
    16,386,006.54 zloty
    0 references
    3,932,641.57 Euro
    13 January 2020
    0 references
    89.0 percent
    0 references
    1 January 2014
    0 references
    22 August 2017
    0 references
    WOJEWÓDZTWO LUBUSKIE / ZARZĄD DRÓG WOJEWÓDZKICH W ZIELONEJ GÓRZE
    0 references
    0 references

    52°35'48.1"N, 15°30'4.0"E
    0 references
    Przedsięwzięcie obejmuje rozbiórki i budowę nowego mostu wraz z mostem objazdowym przez rz.Wartę w m.Skwierzyna w ciągu drogi woj.nr 159 Nowe Polichno-Skwierzyna na odc.dł.0,21 km, w zakresie rozbiórki istn.konstrukcji przęseł, podpór pośrednich oraz przyczółków, Planowane wyk. podpór i konstrukcji nośnej obiektu w zakresie robót drog., mostowych wraz z elektr., teletech. oraz sanit.(przebud.sieci wodoc. i bud.kanalizacji). Celem nadrzędnym proj.jest poprawa dostępności do autostrad i dróg ekspresowych poprzez zwiększenie standardu i jakości sieci dróg woj. oraz BRD. Realizacja projektu przyczyni się do wzmocnienia spójności polskiej sieci transp.z systemami transp. krajów UE, zapewnienie gospod.i przestrzennej spójności kraju i poszczególnych regionów z przestrzenią europejską. W wyniku inwestycji planuje się osiągnięcie nw. celów: • ułatwiona dostępność do głównych szlaków komunikacyjnych, zwłaszcza do autostrady A2 oraz drogi ekspresowej S3, • b. dobry stan techniczny mostu w m.Skwierzyna w ciągu drogi woj. nr 159, • b. dobry stan techniczny drogi, redukujący nadmierne zużycie paliwa, hałas i emisje spalin, • poprawa bezpieczeństwa pieszych poprzez zabezpieczenie ruchu pieszego balustradą na krawędzi chodnika i skarpy na moście, • odpowiednie spadki poprzeczne i równości w kierunku poprzecznym i podłużnym – zwiększenie bezpieczeństwa i komfortu jazdy oraz poprawa warunków odwodnienia, • zwiększenie atrakcyjności inwestycyjnej oraz aktywizacji gospod.reg., • ułatwiony dostęp komunikacyjnych do Regionalnego Parku Przemysłowego w Skwierzynie wchodzącego w skład KSSSE, • wzrost mobilności mieszkańców, • ułatwiony przejazd przez Skwierzynę w ciągu drogi woj. 159 – b. dobry stan naw. drogowej na moście – skrócenie czasu przejazdu. Interesariuszami proj.są: mieszkańcy obszaru wsparcia – G. Skwierzyna, Pow.Międzyrzeckiego, Woj.Lubuskiego; przedsiębiorcy; instytucje publiczne; organizacje pozarządowe; władze państwowe i samorządowe; użytkownicy drogi publicznej (Polish)
    0 references
    The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads (English)
    17 October 2020
    0 references
    Le projet comprend la démolition et la construction d’un nouveau pont, ainsi qu’un pont de détour à travers le district de Skwierzyna, le long de la route no 159 New Polichno-Skwierzyna sur une distance de 0,21 km, dans le cadre de la démolition et de la construction de travées, de supports intermédiaires et de pieds, Prévu pour les supports et structures de soutien de l’installation dans le domaine des travaux routiers, travaux de ponts avec électr., télétech. et assainissement.(reconstruction du réseau wodoc et construction de l’égout). L’objectif principal du projet est d’améliorer l’accessibilité aux autoroutes et aux voies rapides en améliorant la qualité et la qualité du réseau routier de la province et de la BRD. La mise en œuvre du projet contribuera à renforcer la cohérence du réseau transp. polonais avec les systèmes transp. des pays de l’UE, en assurant la cohésion spatiale du pays et des différentes régions avec l’espace européen. Grâce à l’investissement, les objectifs suivants sont prévus: • facilité d’accès aux principaux axes de transport, en particulier à l’autoroute A2 et à l’autoroute S3, • b. bon état technique du pont dans la ville.Skwierzyna pendant la route de voïvodie no 159, • b. bon état technique de la route, réduction de la consommation excessive de carburant, du bruit et des émissions d’échappement, • amélioration de la sécurité des piétons en protégeant la circulation piétonne par des balustrades au bord du trottoir et des pentes sur le pont, • baisses latérales appropriées et égalité dans les directions latérales et longitudinales — augmentation de la sécurité et du confort de la conduite et amélioration des conditions de drainage, • augmentation de l’attractivité des investissements et activation des gospod.reg., • facilité d’accès au parc industriel régional de Skwierzyna, qui fait partie de la KSSSE, • augmentation de la mobilité des résidents, • facilitation du passage à Skwierzyna le long de la route de la province. 159 — b. bon état de la route sur le pont — raccourcir le temps de trajet. Les parties prenantes du projet sont: habitants de la zone de soutien — G. Skwierzyna, Pow. Międzyrzecki, voïvodie de Lubuski; les opérateurs économiques; les institutions publiques; les organisations non gouvernementales; Les autorités de l’État et les collectivités locales; usagers de la route publique (French)
    1 December 2021
    0 references

    Identifiers

    RPLB.05.01.01-08-0003/16
    0 references