Construction of the pipeline between Lewin Brzeski and Paczków on the Hanuszów – Otmuchów section (Q86119)

From EU Knowledge Graph
Revision as of 10:16, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Nyski (Q2577174), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q86119 in Poland
Language Label Description Also known as
English
Construction of the pipeline between Lewin Brzeski and Paczków on the Hanuszów – Otmuchów section
Project Q86119 in Poland

    Statements

    0 references
    0 references
    7,025,941.59 zloty
    0 references
    1,686,225.98 Euro
    13 January 2020
    0 references
    11,512,090.66 zloty
    0 references
    2,762,901.76 Euro
    13 January 2020
    0 references
    61.03 percent
    0 references
    1 July 2017
    0 references
    30 June 2022
    0 references
    POLSKA SPÓŁKA GAZOWNICTWA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    50°28'25.7"N, 17°19'57.0"E
    0 references

    50°27'55.4"N, 17°10'22.8"E
    0 references
    Zakres rzeczowy projektu: Przebudowa gazociągu DN 150 CN 6,3 MPa relacji Lewin Brzeski – Paczków, odcinek Hanuszów – Otmuchów. Zadania - gazociąg w/c Hanuszów – Goświnowice, - gazociąg w/c Goświnowice – Otmuchów. Projektowany gazociąg budowany będzie na terenach pól uprawnych, z dala od zabudowy mieszkalnej. Trasa będzie przebiegała równolegle do gazociągu starego w odległości 0,5 do 1,5 m za wyjątkiem krótkich odcinków, gdzie projektowany gazociąg prowadzony jest równolegle do granic działek na wniosek właścicieli terenu. Opisywany gazociąg przebiega przez gminy już zgazyfikowane. Modernizacja przedmiotowej sieci spowoduje, także zmniejszenie strefy kontrolowanej, co w konsekwencji pozwoli na swobodniejsze gospodarowanie gruntami wzdłuż trasy gazociągu. (Polish)
    0 references
    In-kind scope of the project: Reconstruction of the DN 150 CN 6.3 MPa relations between Lewin Brzeski and Paczków, section of Hanuszów – Otmuchów. Tasks – gas pipeline w/C Hanuszów – Goświnowice, – gas pipeline w/c Goświnowice – Otmuchów. The planned gas pipeline will be built in arable fields, away from residential buildings. The route will run parallel to the old pipeline at a distance of 0.5 to 1.5 m, except for short sections, where the planned pipeline is run parallel to the boundaries of the plots at the request of the landowners. This gas pipeline runs through the municipalities already gasified. The modernisation of the network will also reduce the controlled zone, which will, as a result, allow for more free management of land along the pipeline route. (English)
    14 October 2020
    0 references
    Portée matérielle du projet: Reconstruction du gazoduc DN 150 CN 6.3 MPa entre Lewin Brzeski et Paczków, section Hanuszów — Otmuchów. Tâches — Hanuszów — gazoduc Goświnowice, — gazoduc à Goświnowice — Otmuchów. Le gazoduc prévu sera construit sur des terres agricoles, loin du développement résidentiel. L’itinéraire se déroulera parallèlement à l’ancien gazoduc à une distance de 0,5 à 1,5 m, à l’exception des tronçons courts, où le gazoduc prévu est exploité parallèlement aux limites des parcelles à la demande des propriétaires fonciers. Ce gazoduc traverse les municipalités déjà gazéifiées. La modernisation du réseau réduira également la zone contrôlée, ce qui donnera lieu à une gestion plus libre des terres le long de l’itinéraire pipelinier. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.07.01.00-00-0008/16
    0 references