Construction of the S7 Radom road (Jedlińsk) – Jędrzejów, St. Chęciny – Jędrzejów (Q85825)

From EU Knowledge Graph
Revision as of 21:05, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet sera mis en œuvre dans les districts de Kielce et Jędrzejowski (Voïvodie de Swietokrzyskie) et comprendra: — construction d’une route express d’une section de 2x2 et d’une longueur de 21,553 km; — la construction de trois pôles routiers («Tokarnia», «Brzegi» «Mnichów»), deux lieux de service de voyage («Wmyków», «Podlesie») et le site de contrôle des véhicules «wrzosy»; — la construction et la reconstruction nécessaires de structures t...)
Jump to navigation Jump to search
Project Q85825 in Poland
Language Label Description Also known as
English
Construction of the S7 Radom road (Jedlińsk) – Jędrzejów, St. Chęciny – Jędrzejów
Project Q85825 in Poland

    Statements

    0 references
    387,422,101.1 zloty
    0 references
    92,981,304.26 Euro
    13 January 2020
    0 references
    455,790,707.18 zloty
    0 references
    109,389,769.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    50°39'25.9"N, 20°17'47.4"E
    0 references

    50°48'6.8"N, 20°52'54.1"E
    0 references
    Projekt będzie realizowany na obszarze powiatów kieleckiego i jędrzejowskiego (woj. świętokrzyskie) i obejmuje: - budowę drogi ekspresowej o przekroju poprzecznym 2x2 i długości 21,553 km; - budowę trzech węzłów drogowych („Tokarnia”, „Brzegi” „Mnichów”), dwóch Miejsc Obsługi Podróżnych („Smyków”, „Podlesie”) oraz Miejsca Kontroli Pojazdów „Wrzosy”; - niezbędną budowę i przebudowę obiektów inżynierskich, dróg, ciągów pieszo-jezdnych, ekranów akustycznych, przejść dla zwierząt, przepustów drogowych, systemu odprowadzania wód deszczowych, oświetlenia, kolidującego uzbrojenia terenu, urządzeń BRD; - wyburzenia i rozbiórki budynków i budowli, - nasadzenia zieleni. (Polish)
    0 references
    The project will be carried out in the areas of Kielce and jjrzejowski districts (Świętokrzyskie voivodeship) and includes: — construction of an expressway with a cross section of 2x2 and a length of 21,553 km; — construction of three road junctions (“Tokarnia”, “Brzegi” “Mnichów”), two Travel Service Facilities (“Smyków”, “Podlesie”) and Vehicle Control Sites “Wrzosy”; — the necessary construction and reconstruction of engineering facilities, roads, walking and roadways, acoustic screens, animal crossings, road culverts, rainwater drainage system, lighting, conflicting equipment, BRD equipment; — demolition and demolition of buildings and buildings, – planting greenery. (English)
    14 October 2020
    0 references
    Le projet sera mis en œuvre dans les districts de Kielce et Jędrzejowski (Voïvodie de Swietokrzyskie) et comprendra: — construction d’une route express d’une section de 2x2 et d’une longueur de 21,553 km; — la construction de trois pôles routiers («Tokarnia», «Brzegi» «Mnichów»), deux lieux de service de voyage («Wmyków», «Podlesie») et le site de contrôle des véhicules «wrzosy»; — la construction et la reconstruction nécessaires de structures techniques, de routes, de voies de marche et de conduite, d’écrans acoustiques, de passages d’animaux, de ponceaux routiers, de systèmes de drainage des eaux de pluie, d’éclairage, d’armements terrestres interférants, d’équipements de BRD; — démolition et démolition de bâtiments et de bâtiments, — plantation de verdure. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.03.01.00-00-0004/15
    0 references