Creation of a park in Słodów and revalorisation of the H. Sienkiewicz Park in Włocławek (Q85744)

From EU Knowledge Graph
Revision as of 21:06, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet est situé dans la voïvodie de kuj.-pom., dans la région de Włocławek. Selon les documents stratégiques au niveau du pays et de la voïvodie. La surface du projet est de 7,99 ha. C’est une zone à la frontière des 3 plus grands districts: Centre-ville, Sud et Château. Les travaux de construction comprennent: remise en état de la verdure dégradée le long de la piste cyclable prévue en suivant la ruelle détruite du parc historique H.Sienkie...)
Jump to navigation Jump to search
Project Q85744 in Poland
Language Label Description Also known as
English
Creation of a park in Słodów and revalorisation of the H. Sienkiewicz Park in Włocławek
Project Q85744 in Poland

    Statements

    0 references
    10,520,221.62 zloty
    0 references
    2,524,853.19 Euro
    13 January 2020
    0 references
    12,376,731.32 zloty
    0 references
    2,970,415.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 August 2019
    0 references
    GMINA MIASTO WŁOCŁAWEK
    0 references
    0 references
    0 references

    52°39'56.2"N, 19°5'46.0"E
    0 references
    Przedsięwzięcie zlokalizowane jest w woj. kuj.-pom., na terenie m.Włocławek. Zgodnie z dok. strategicznymi na poziomie kraju i woj. Pow. ter. projektu wynosi 7,99 ha. Jest to obszar na pograniczu 3 największych dzielnic: Śródmieścia, Południa i Zazamcza. W ramach robót bud. przewiduje się: odnowienie zdegradowanej zieleni wzdłuż planowanego ciągu pieszo-rowerowego w śladzie zniszczonej alei parkowej w zabytkowym Parku im.H.Sienkiewicza, który zapewni bezpośrednie połącz. istniejącego i planowanego parku, a także umożliwi dostęp do nowych ter. zielonych mieszkańcom Śródmieścia i Zazamcza oraz utworzenie nowego parku na Słodowie. Planowane prace: rewaloryzacja i przebudowa istniejącej szaty roślinnej,zabiegi z zakresu gospodarki drzewostanem (m.in. zachowanie starodrzewia, eliminacja gat. inwazyjnych), renowacja ter. zieleni, wielogatun. i wielopiętrowe nasadzenia drzew, krzewów i bylin wzbogacające istniejącą szatę roślinną (gł.Gat.rodzime), z uwzględnieniem lokal. uwarunkowań siedliskowych, montaż budek lęgowych dla ptaków i domków dla owadów, umocnienie zboczy przed osuwaniem się mas ziemnych i zabezpieczenie przed spływem wód powierzchniowych z wykorzyst. projektowanych umocnień jako siedzisk dla rekreacji codziennej, profilowanie ter. w obszarze skarp, niwelacja wybranych nasypów i nierówności, zasypanie niecek nieczynnych basenów, uporządkowanie ter. w rejonie 2 stawów (wycinka roślin w związku z utrzymaniem wód stojących. (Polish)
    0 references
    The project is located in the Kuj-pom voivodship, in the area of Włocławek. According to strategic docs at the level of the country and the wars. The project is 7.99 ha. It is an area on the border of the 3 largest districts: Downtown, South and Castle. As part of the construction works, the following are envisaged: the renovation of the degraded greenery along the planned walk-bike line in the footsteps of the destroyed park in the historic H.Sienkiewicz Park, which will provide a direct connection of the existing and planned park, will also allow access to new green areas of the inhabitants of Śródmieście and Zazamcz and the creation of a new park in Słodów. Planned work: recuperation and reconstruction of the existing plant robe, treatments in the field of tree standing (e.g. preservation of the old tree, elimination of species. invasive), restoration of ter. greenery, multi-gat. and multi-storey planting of trees, bushes and perennials enriching the area of the existing plant robe (headed.Gat.rody), taking into account the premises. (English)
    14 October 2020
    0 references
    Le projet est situé dans la voïvodie de kuj.-pom., dans la région de Włocławek. Selon les documents stratégiques au niveau du pays et de la voïvodie. La surface du projet est de 7,99 ha. C’est une zone à la frontière des 3 plus grands districts: Centre-ville, Sud et Château. Les travaux de construction comprennent: remise en état de la verdure dégradée le long de la piste cyclable prévue en suivant la ruelle détruite du parc historique H.Sienkiewicz, qui fournira une connexion directe avec le parc existant et prévu, ainsi que l’accès à de nouvelles zones vertes pour les habitants de Śródmieście et Zazamcz et la création d’un nouveau parc à Słodów. Travaux prévus: revalorisation et reconstruction des robes de plantes existantes, traitements dans le domaine de la gestion forestière (par exemple préservation des vieux arbres, élimination des espèces envahissantes), restauration de la verdure, plantation à plusieurs étages d’arbres, d’arbustes et de vivaces enrichissant la robe végétale existante (Gat.rodzime), y compris les conditions d’habitat, installation de stands de reproduction pour les oiseaux et les maisons d’insectes, fortification des pentes contre les glissements de terrain et protection contre le ruissellement des eaux de surface contre l’utilisation de fortifications conçues comme sièges pour les loisirs quotidiens, profilage de ter. dans la zone des pentes, nivellement de remblai sélectionnés et inégalité, remplissage des bassins de bassins inactifs, ordre ter. dans la zone de 2 étangs (coupage des plantes dans le cadre de l’entretien des eaux stagnantes. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.05.00-00-0123/16
    0 references