Development of a method of identification of optimal control of small hydroelectric power plants (Q81483)

From EU Knowledge Graph
Revision as of 14:55, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): «Reference_aid_programme number: SA.42799(2015/X), help_de_minimis: Article 42 du règlement du ministre des infrastructures et du développement du 10 juillet 2015 relatif à l’octroi d’une aide financière par l’Agence polonaise pour le développement de l’entreprise dans le cadre du programme opérationnel «Croissance intelligente 2014-2020» Le projet concerne les petites centrales hydroélectriques d’une puissance maximale de 1 MW, utilisant princi...)
Jump to navigation Jump to search
Project Q81483 in Poland
Language Label Description Also known as
English
Development of a method of identification of optimal control of small hydroelectric power plants
Project Q81483 in Poland

    Statements

    0 references
    85,000.0 zloty
    0 references
    20,400.0 Euro
    13 January 2020
    0 references
    100,000.0 zloty
    0 references
    24,000.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 March 2019
    0 references
    31 July 2019
    0 references
    PRZEDSIĘBIORSTWO PRODUKCYJNO HANDLOWO USŁUGOWE "ENERGIA" MARZENA BARTNIK, MARCIN BARTNIK SPÓŁKA CYWILNA
    0 references
    0 references
    „Numer_referencyjny_programu_pomocowego: SA.42799(2015/X), pomoc_de_minimis: §42 rozporządzenia Ministra Infrastruktury i Rozwoju z dnia 10 lipca 2015 r. w sprawie udzielania przez Polską Agencję Rozwoju Przedsiębiorczości pomocy finansowej w ramach Programu Operacyjnego Inteligentny Rozwój 2014–2020” Przedmiotem projektu są małe elektrownie wodne o mocy do 1MW, wykorzystujące głównie maszynę indukcyjną jako generator oraz różnego typu turbiny wodne. Z uwagi na trudny i kosztowny proces identyfikacji parametrów pracy tych obiektów oraz zmieniające się okresowo właściwości hydrologiczne i hydrauliczne są one zazwyczaj nieoptymalnie sterowane. Skutkuje to niską sprawnością przetwarzania energii co przekłada się na słaby efekt ekonomiczny elektrowni. Projekt ten ma za zadanie poprawę sprawności tego typu elektrowni poprzez optymalizację parametrów sterowania. Głównym rezultatem projektu powinna być procedura wykonywania procesu identyfikacji optymalnego sterowania dla wybranego obiektu MEW z generatorem indukcyjnym. Istotnym elementem będzie sposób opracowania danych pomiarowych celem automatycznego wyznaczenia krzywej pracy optymalnej. Innowacja tego rozwiązania będzie polegała na wykorzystaniu zaawansowanych technik przetwarzania i analizy danych pomiarowych celem eliminacji błędów pomiarowych oraz skrócenia czasu trwania niezbędnych pomiarów. (Polish)
    0 references
    ‘Aid programme reference number: SA.42799(2015/X), help_de_minimis: §42 of the Ordinance of the Minister of Infrastructure and Development of 10 July 2015 on the granting by the Polish Agency for Enterprise Development financial assistance under the Operational Programme Intelligent Development 2014-2020" The subject of the project are small hydro power plants up to 1 MW, mainly using an induction machine as a generator and various types of water turbines. Due to the difficult and costly process of identifying the operating parameters of these objects and periodically changing hydrological and hydraulic properties, they are usually suboptimally controlled. This results in low energy conversion efficiency, which translates into a weak economic effect of the power plant. This project aims to improve the efficiency of this type of power plant by optimising control parameters. The main result of the project should be the procedure for identifying optimal control for the selected MEW object with an induction generator. An important element will be the method of developing measurement data in order to automatically determine the optimal work curve. The innovation of this solution will consist of the use of advanced techniques for processing and analysing measurement data to eliminate measurement errors and to shorten the duration of the necessary measurements. (English)
    14 October 2020
    0 references
    «Reference_aid_programme number: SA.42799(2015/X), help_de_minimis: Article 42 du règlement du ministre des infrastructures et du développement du 10 juillet 2015 relatif à l’octroi d’une aide financière par l’Agence polonaise pour le développement de l’entreprise dans le cadre du programme opérationnel «Croissance intelligente 2014-2020» Le projet concerne les petites centrales hydroélectriques d’une puissance maximale de 1 MW, utilisant principalement une machine à induction comme générateur et divers types de turbines à eau. En raison du processus difficile et coûteux d’identification des paramètres d’exploitation de ces installations et de l’évolution périodique des propriétés hydrologiques et hydrauliques, ils sont généralement sous-optimaux. Il en résulte une faible efficacité de conversion énergétique, ce qui se traduit par un faible effet économique de la centrale. Ce projet vise à améliorer l’efficacité de ce type de centrale en optimisant les paramètres de contrôle. Le principal résultat du projet devrait être la procédure d’identification du contrôle optimal de l’objet MEW sélectionné avec un générateur inductif. Un élément important sera la façon de développer des données de mesure afin de déterminer automatiquement la courbe de travail optimale. L’innovation de cette solution consistera à utiliser des techniques avancées pour le traitement et l’analyse des données de mesure afin d’éliminer les erreurs de mesure et de réduire la durée des mesures nécessaires. (French)
    30 November 2021
    0 references

    Identifiers

    POIR.02.03.02-24-0025/18
    0 references